You are on page 1of 12

Bi-weekly Progress No.

07
Meeting for Civil Works
for Bekasi Technical Centre

12 April 2021
Water Requirement Calculation 1
Water Demand Calculation Flow Water Consumption & Criteria Standard
Design
No Land Use Unit Source
Standard
Noerbambang & Morimura,
1 Office lpcd 100
1993:48
Noerbambang & Morimura,
2 Laboratory lpcd 200
1993:48
3 Utility lpcd 50 SNI 03- 7065-2005
4 Wet Braking Track m3/hour 199 IDIADA Report
5 Wet Handling Track m3/hour 875 IDIADA Report

Water Demand Forecast of Proving Ground


Land Use Water Demand
  m3/day liter/sec
Population Capacity Standard
Building, Laboratory & Utility 339 4
Design Test Track 25,776 298
No Land Use Unit Source
Standard Existing Building 83 0.96
1 Office m2/person 15 Neufert Sub Total 26,198 303
2 Laboratory m2/person 15 Neufert NRV, Water loss (10%) 2,6198 30.3
English Partnership Employment
3 Utility m2/person 50 Raw Water Requirement 28,817 334
Densities Guide
Water Source Alternatives 2

Suggested Intake Kali Malang


(Option-1)
El. ± 24m *

WTP MM2100
(Option-2)
El. ± 31 m *

Deep Well
Option-3

Proving Ground Area Suggested WTP/


El. 35-45 m Reservoir

Transmission Line WTP MM2100 to PG (length : ± 3.6 km)


Transmission Line Intake Kali Malang to PG (length : ± 3.13 km)

* Noted : Some Elevation/ Ground Level only Based on Google Earth (further study is required)
Comparison Table of Water Source Alternatives (1) 3

The alternative sources of water supply that are most


likely to be implemented are the following three options:
• Option 1-Kalimalang
• Option 2- WTP MM2100
• Option 3- Deep Well

No Parameter Option-1 (Kalimalang) Option-2 (WTP MM2100) Option-3 (Deep Well)


1 Quantity • Channel Design • Clean water treatment • Depressed aquifer of CAT
Discharge Capacity : plant with a capacity of Bekasi-Karawang : 6 million
12.5-82 m3/s 72,000 m3/ day (0.83 m3/year (0.2 m3/s)
• Actual Channel m3/s) • Groundwater exploitation
Discharge (sluice gate) (Source: mm2100.co.id) activities are required
50 m3/s

2 Quality Relatively good / raw The water produced is in Raw water quality standard
water quality standard accordance with clean water (Further Study Required)
( Further study Required) quality standards
3 Water Usage 50% Irrigation, 30% raw Clean Water Supply for Water Supply for residential,
water supply for DKI, 20% MM2100 Industrial Area. irrigation system, industrial and
for other area (PJT II) others
Comparison Table of Alternative Water Source (2) 4

No Parameter Option-1 (Kalimalang) Option-2 (WTP MM2100) Option-3 (Deep Well)


4 Accessibility •Distance to PG : 3.13 km •Distance to PG : 3.6 km Inside PG Area.
•Distance to service •Transmission route: have to •The route can follow the existing
area cross the toll road road
•Access Road/
transmission route

5 Existing Water •Not Available yet •MM2100 has existing Kalimalang •Not Available yet
Supply •Have to built new intake and WTP (72,000 m3/day) •Have to built : Deep Wells, WTP,
Infrastructure infrastructure such as : intake, •Still need additional ground tank, distribution Pipeline,
transmission pipeline, WTP, infrastructure such as : and groundwater protection
ground tank, and distribution Transmission pipeline, ground infrastructure (Monitoring wells and
system. tank, distribution system. affixing wells)
6 Management Management activities can be Management activities will Management activities can be carried
Independency carried out independently and depend on other parties out independently and not
not dependent on other (MM2100). dependent on outside parties
parties.
7 Permits & Legality The licensing for raw water Licensing tends not to be too The groundwater use permit needs to
extraction is in accordance difficult, it needs cooperation with be extended for every three years,
with the rules of PJT II, the MM2100 and the requirements for
transmission line crosses the groundwater utilization are also more
toll road (Licensing will be complicated as stated in the Bekasi
complicated too) District Regulation on Groundwater
Management, 2012.
Weighing Analysis of Water Source Alternatives 5

Based on the initial information that has been obtained, Weighting analysis is carried out for each parameter, as
follows:
Weighing Criteria Weighing Analysis
Code Parameter Classification Score Score Total Score (Weight x Score)
Raw Water 1 Option-1 Option-2 Option-3 Option-1 Option-2 Option-3
A Water Quality Criteria Weight
Clean Water 3 Kalimalan WTP Kalimalan WTP Deep
< 0.5 m3/s 1 g MM2100 Deep Well g MM2100 Well
B Water Quantity 0.5 -10 m3/s 2 A 10% 1 3 1 10 30 10
>10 m3/s 3 B 20% 3 2 1 60 40 20
Water Source >3.5 km 1 C 10% 2 1 3 20 10 30
Distance/ 1.5 -3.5 km 2 D 10% 1 2 3 10 20 30
C
Transmission
E 10% 1 2 1 10 20 10
Pipe Length <1.5 km 3
F 20% 2 3 1 40 60 20
Hard (crossing toll road) 1 G 20% 3 1 3 60 20 60
Access roads
Medium (crossing local   100% Total 210.00 200.00 180.00
and
D road) 2
transmission
routes Easy (follow the road
plan) 3
Existing Water Not Available 1
E Supply Insufficient (still lacking) 2
Infrastructure Already built 3
Hard 1 Final Score Ranking:
Permit and
F
Legality
Medium 2 1st Option-1 (Kalimalang)
Easy 3
Management Dependent 1
2nd Option-2 (WTP MM2100)
G
Independency Independent 3 3rd Option-4 (Deep Well)
Water Supply Scheme Alternatives 6

Alternative- 1

a) Average water requirement (AWR): 26,198 m3/day or 303lps  


  c) Capacity of WTP : 28,817 m3/day or 334 lps
b) Intake/WTP capacity  
 AWR : 26,198 m3/day d) WTP + Ground Reservoir area requirement : 9-12 m2 / lps (based on previous
 Water loss (10%) : 2,619 m3/day project) = 12 m2 x 334 lps = 4,000 m2
 Intake capacity : 28,817 m3/day or 334 lps  
 Transmission Pipeline
- Length : 3,110 m
- Diameter : 500 mm
- Pump Req : Q= 400 m3/hour, H= 30 m,
Quantity = 4 (3 duty+1reserve)
Water Supply Scheme Alternatives 7

Alternative-2

a) Average water requirement (AWR): 26,198 m3/day or 303lps


   Transmission Pipeline from MM2100 (clean water)
b) Intake Kalimalang capacity (50%) - Length : 3,600 m
 AWR : 26,198 m3/day*50% =13,099 m3/day - Diameter : 350 mm
 Water loss (10%) : 1,309 m3/day - Pump Req : Q= 200 m3/hour, H= 30 m, Quantity = 4 (3
 Intake capacity : 14,408 m3/day or 167 lps duty+1 reserve)
 Transmission Pipeline from Kalimalang  
- Length : 3,110 m  
- Diameter : 350 mm c) Capacity of WTP : 14,408 m3/day or 167 lps (raw water only from Kalimalang intake)
- Pump Req : Q= 200 m3/hour, H= 30 m, Quantity =  
4 (3 duty+1 reserve) d) WTP + Ground Reservoir area requirement : 2,600 m2
   
Water Supply Distribution Concept (1) 8

Alternative- 1 (Integrated Distribution Pipeline)

a) Length of pipe:
• Dia 110 mm, L = 1,938 m
• Dia 200 mm, L = 1,434 m
• Dia 400 mm, L = 816 m
• Dia 500 mm, L = 2,643 m
• Dia 600 mm, L = 895 m
 
b) Pump Requirement:
• Q = 372 m3/hour, H = 30 m, Qty=
(3+1 reserve)
 
Water Supply Distribution Concept (2) 9

Alternative- 1 (Separated Distribution Pipeline)

 
a) Length of pipe:
• Dia 63 mm, L = 1,540 m
• Dia 110 mm, L = 3,100 m
• Dia 200 mm, L = 1,434 m
• Dia 400 mm, L = 816 m
• Dia 500 mm, L = 297 m
• Dia 600 mm, L = 895 m
 
b) Pump Requirement:
• Q = 360 m3/hour, H = 25 m, Qty= (3+1
reserve)
• Q = 12 m3/hour, H = 25 m, Qty= (3+1
reserve)
 
Wastewater System 10

Design Criteria
The Consultant
No Item Unit
WTP + Ground Standard
Reservoir Capacity of sewerage % of water
1 80
network consumption
0.3 for gravity system
2 Minimum Velocity m/s
0.6 for pump system
3 Pipe depth m 1.5-3
Water consumption: 4 Infiltration rate % 10-15
Water consumption: 5 Manhole distance m 50 m
• Main Building Recycling
• Test Track
• Laboratory Test • Fire Fighting

Wastewater Discharge Forecast
Staff Personnel
Wastewater Discharge
Land Use
m3/day liter/sec
Drainage System
Sewerage System Building, Laboratory & 270.81 3.1
utility area
Existing Building 66.4 0.76
Pond /Water Q Average 336.86 3.9
WWTP
Storage Q Max day 421 4.8
• Average wastewater discharge (AWD) = 80% x water consumption = 336.86
m3/day
• WWTP capacity = AWD x safety factor (1.25) = 421 m3/day or 4.8 lps
• WWTP area requirement : 70-100 m2 / lps (based on previous project) = 100 m2 x
4.8 lps = 480 m2 ~ 500 m2
Wastewater Piping Network 11

Length of pipe:
• Dia 63 mm, L = 542.5 m
• Dia 110 mm, L = 333.5 m
• Dia 150 mm, L = 359.5 m
• Dia 200 mm, L = 284 m
• Dia 300 mm, L = 518 m