You are on page 1of 24

New Power Solution VDF Huawei Wireless 1.

• Department: name: NTD QM electrical safety


• Author’s name: Liucheng (Leo) /Heiko Zander/ Marcus Lindemans/ Tomas Hruska/ Kaifeng Guo
• Date: 20200415

Security Level:
1
Version Control

NO. Version Modify by Description


Scenario Definition.
1 1.0 Heiko Zander 04.2020
Acknowledged by VEFK Huawei/VDF
Heiko Zander, Michael After check more clear details, add
2 1.3 04.2020
Wischtukat alarms to X6 , ABB without caractarisitcs
3 1.4 Michael Wischtukat Page 14 Cable information 04.2020

2
Overview – introduction, ALL Scenarios

Power requirements of new products led to update of solution scenarios Single band RRU (<500W average power)
 Delivery of Huawei OVP was stopped. Can’t be installed anymore. Scenario Description
Only new Rosenberger OVP SLPDU058-00 or/and Huawei DC Box only to be used Scenario S1 ≤20m between DC Box and RRU 4mm2
 Rosenberger OCB (Outdoor Connection Box) SLPDU059-00 introduced 21m ~50m between Rosenberger OVP and DC Box 16mm2
Scenario S2
Its use depends on distance between RRU and Rosenberger OVP box
 Cable wire diameter is calculated by distance between RRU and Rosenberger OVP. Scenario S3 51m ~100m between Rosenberger OVP and DC Box 2x16mm2
 Special mix scenario for Multiband RRU(>500W) and single band RRU up to 20m only (M1.2)
 In case of changing or installing new RRU, new Rosenberger OVP box is needed Multiband RRU(valid for RRU5501,RRU5509t,RRU5519et)
 New BBU5900 introduced (refer to separate chapter in this .ppt)
 Grounding concept updated (refer to separate chapter in this .ppt) Scenario Description
 Use breakers characteristic B or C. Values defined for particular scenarios! Special Scenario M1.1 ≤20m between DC Box and RRU 4mm2 3 Multiband RRU only
precondition! Scenario M1.2 ≤20m between DC Box and RRU 4mm2 ”Mixed”
Huawei recommendation: Scenario M2 ≤40m between Rosenberger OVP and RRU 6mm2
use Rosenberger cables and accessories only Scenario M3 41m ~ 60m between Rosenberger OVP and RRU 10mm2
• lightweight
Scenario M4 61m ~ 100m between Rosenberger OVP and RRU 16mm2
• stock management simplified
• end to end solution products
• Hotline support 5G AAU
Scenario Description
Scenario A1 ≤20m between Rosenberger OVP and AAU 6mm2

Scenario A2 20m ~50m between Rosenberger OVP and AAU 16mm2

Scenario A3 51m ~80m between Rosenberger OVP and AAU 25mm2

Special cases e.g. distance higher than in above scenarios or exceptional cases
need to be approved by VEFK Huawei – heiko.zander@huawei.com

Page 3 3
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules

4
Singleband RRU Power Solution(Summary)
Delivery of Huawei OVP was stopped. Can’t be installed anymore.
Only new Rosenberger OVP SLPDU058-00 or/and Huawei DC Box only to be used
In case of changing or installing new RRU, new Rosenberger OVP box is needed
To see original old solutions please refer to Germany VDF_site_solution guide(2017))
New BBU5900 introduced (refer to separate chapter in this .ppt)

5
Scenario S1: up to 20m between DC Box and RRU

Breaker B or C
 Use 2p-50A

6
Scenario S2: 21 to 50m between OVP and DC-Box

For single band RRUs we will still use existing scenarios –


changes marked red
 Only new Rosenberger OVP to be used
 Only Huawei DC latest version box (ODM06D-1) can be reused or new
 Any work on the current scenario (RRU swap, additional RRU)
change OVP to Rosenberger and make sure DC Box is the latest
Huawei DC Box version
ODM06D-1  check the breaker is 2p-50A

Rosenberger OVP
SLPDU058-00

Note:
 For Rosenberger OVP follow Rosenberger ‘s installation guide.
 In case of any questions contact Rosenberger support
7
Scenario S3: 51 to 100 m between OVP and DC-Box

For single band RRUs we will still use existing


scenarios – changes marked red
 Only new Rosenberger OVP to be used
 Only Huawei DC latest version box (ODM06D-1) can be
reused or new
 Any work on the current scenario (RRU swap, additional
Huawei DC Box
ODM06D-1 RRU) change OVP to Rosenberger and make sure DC
Box is the latest version
 2x2x16m2 between OVP and Power Supply are necessary
If missing, install the 2nd one and connect to 1p-50A, and
check the 1st breaker also 1p-50A (if not change!)
Rosenberger OVP
SLPDU058-00

50A 50A

Note:
 For Rosenberger OVP follow Rosenberger ‘s installation guide.
 In case of any questions contact Rosenberger support
8
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules

9
Special Scenario M1.1: ≤20m between Huawei DC BOX and RRU - 3 Multiband RR
U only Huawei DC box reuse or new for the same level installation.
Material Qty Description
Huawei DC box 1pcs in case of new
Max 3 Multiband RRU L2 2x4mm²
1 pcs/sector
Cable between distribution Box and RRU
up to 20m, Power cable NYCWY or Rosenberger
cable SL2CXXMM2FRNC-S-BK-R or N2XC2Y
R R R L1 2x16mm²
1pcs (reuse Cable between Delta and distribution Box
case) up to 20m, NYCWY or Rosenberger
R R R cable 2pcs (new case) SL2CXXMM2FRNC-S-BK-R
U U U
 PSS, DC Box and RRU
must be on the same level!
use only positions 0, 2 and
L2 4!!
L2 L2
thermal dissipation security!

Reuse  In case of new DC Box


always 2x2x16mm² and 2x 1p-50A
DC-BOX
New
L1 DC-BOX
keep L1 Multiband RRU
2p-50A R RRU5501,
PSS 1p-50A 1p-50A R RRU5509t,
U
-48V DC RRU5519et

Page 10 10
Special Scenario M1.2: ≤20m between Huawei DC BOX and RRU – “Mixed”
Huawei DC box reuse or new for the same level installation.
Material Qty Description
Huawei DC box 1pcs in case of new
Max 3 Multiband RRU L2 2x4mm²
1 pcs/sector
Cable between distribution Box and RRU
up to 20m, Power cable NYCWY or Rosenberger
cable SL2CXXMM2FRNC-S-BK-R or N2XC2Y
R R R R R R L1 2x16mm² Cable between Delta and distribution Box
2pcs up to 20m, NYCWY or Rosenberger
R R R R R R cable
SL2CXXMM2FRNC-S-BK-R
U U U U U U
 2x 2x16m2 between OVP and Power Supply are necessary
If missing, install the 2nd one and connect to 1p-50A, and check the 1st breaker
L2 also 1p-50A (if not change!)
L2 For Multiband use only
L2 L2 L2  PSS, DC Box and RRU must be on the same level!
L2 positions 0, 2 and 4!!
thermal dissipation security!
See previous slide for detail

Reuse  In case of new DC Box


always 2x2x16mm² and 2x 1p-50A
DC-BOX
If power higher than over 50A or average power
sum more than 2500W an extra cable needed New R Single-Band RRU
50A per cable R
RRU type Av.power [W]
L1 DC-BOX U
The other RRU

RRU5309 800M 2T2R 225


L1 Multiband RRU
1p-50A 1p-50A
RRU5901 1.8G 4T4R 346 R RRU5501,
RRU3828 (LTE/UMTS2100) 148 PSS 1p-50A 1p-50A R RRU5509t,
RRU3838 Blade(LTE/UMTS2100)2T2R 2x40W 230 U
RRU5904 2.1G 4T4R/ 1.8G 4T4R 431
-48V DC RRU5519et

Page 11 11
Scenario M2: ≤40m between Rosenberger OVP and Multiband RRU
both Rosenberger and NYCWY power cable
Multi-Band RRU Rosenberger SL2CXXMM2 FRNC-S-BK-r
RRU5501, Material Qty Description
Rosenberger OVP box 1pcs
RRU5509t,
R R R 1 Cable between Rosenberger OVP
RRU5519et L2 2x6mm² cable
R R R pcs/sector and RRU up to 40 m
U U U 1 Cable between Delta and
L1 2x10mm² cable
pcs/sector Rosenberger OVP up to 10 m

2x6mm², L2≤40mL2 L2 L2
NYCWY
Material Qty Description
SLPDU058-00 Rosenberger OVP box 1pcs

Cable between Rosenberger


L2 2x6mm² cable 1 pcs/sector
OVP and RRU up to 40m

Cable between Delta and


L1 2x10mm² cable 1 pcs/sector
Rosenberger OVP up to 10 m

2x10mm², L1≤10m
32A or DCDU 30A
43.2V-54V output X6 terminal
PSS S1 32A/30A Alarm Cable Multiband RRU
L1
R RRU5501,
-48V S2 32A/30A L1 R RRU5509t,
DC S3 32A/30A L1 U
RRU5519et

Page 12 12
Scenario M3: ≤60m between Rosenberger OVP and Multiband RRU
only Rosenberger power cable
Rosenberger SL2C10MM2 FRNC-S-BK-r
Material Qty Description
Rosenberger OVP box 1pcs
Cable between Rosenberger OVP and
R R R L2 2x10mm² cable 1 pcs/sector RRU up to 60 m, SL2C10MM2 FRNC-S-
R R R BK-r
U U U Cable between Delta and OVPup to 10
L1 2x10mm² cable 1 pcs/sector
m, SL2C10MM2 FRNC-S-BK-r

2x10mm², L2≤60mL2 L2 L2

SLPDU058-00

2x10mm², L1≤10m
32A or DCDU 30A
43.2V-54V output X6 terminal
PSS S1 32A/30A Alarm Cable Multiband RRU
L1
R RRU5501,
-48V S2 32A/30A L1 R RRU5509t,
DC S3 32A/30A L1 U
RRU5519et

Page 13 13
Scenario M4: 61m ~ 100m between Rosenberger OVP and OCB
Rosenberger & N2xC2Y or NYCWY & N2xC2Y
R R R Rosenberger SL2C FRNC-S-BK-r L1,L2,L3
R R R
U U U
NYCWY L1,L2,L3
2x4mm², L3≤10mL3 L3 L3

Note :
SLPDU059-00
Only L3 4mm2 power cable can use N2xC2Y (Huawei Cable), otherwise cannot.
Material Qty Description
Rosenberger OVP box 1pcs
2x16mm², 60m<L2 ≤100m
L2 L2 L2 OCB 1 pcs/sector
L3 2x4mm² cable 1 pcs/sector Cable between OCB and RRU up to 10 m
Cable between Rosenberger OVP and OCB
SLPDU058-00
L2 2x16mm² cable 1 pcs/sector From 61m to 100m, NYCWY or Rosenberger SL2C16MM2
FRNC-S-BK-r
Cable between Delta and Rosenberger OVP
L1 2x10mm² cable 1 pcs/sector up to 10m, NYCWY or Rosenberger SL2C16MM2 FRNC-S-
BK-r

2x10mm², L1≤10m
32A or DCDU 30A
PSS S1 32A/30A L1
X6 terminal Multiband RRU
L1 Alarm Cable
-48V S2 32A/30A
R RRU5501,
L1
DC S3 32A/30A R RRU5509t,
43.2V-54V output U
RRU5519et

Page 14 14
• Singleband RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules

15
Scenario A1: ≤20m between Rosenberger OVP and AAU

Material Qty Description


Rosenberger OVP box 1pcs
AAU5613 AAU5613 AAU5613 Cable between Rosenberger OVP and AAU up to 20
L2 2x6mm² cable 1 pcs/sector
m, NYCWY or Rosenberger
Cable between Delta and Rosenberger OVP up to 10
L1 2x16mm² cable 1 pcs/sector m, NYCWY or Rosenberger or H07RN-F

2x6mm², L2≤20m L2 L2 L2

SLPDU058-00

2x16mm², L1≤10m

L1
X6 terminal
PSS S1 40A
L1 Alarm Cable
S1 40A
-48V DC S1 40A
L1

Page 16 16
Scenario A2: ≤ 50m between Rosenberger OVP and AAU

Material Qty Description


AAU5613 AAU5613 AAU5613 Rosenberger OVP box 1pcs
OCB 1 pcs/sector
Cable between OCB and AAU. Up to 10 m. All types of
L3 2x6mm² cable 1 pcs/sector
current cables
2x6mm², L3≤10mL3 L3 L3 Cable between Rosenberger OVP and OCB
L2 2x16mm² cable 1 pcs/sector
From 21m to 50 m, NYCWY or Rosenberger

SLPDU059-00 Cable between Delta and Rosenberger OVP


L1 2x16mm² cable 1 pcs/sector
up to 10 m, NYCWY or Rosenberger or H07RN-F

2x16mm², L2 ≤50mL2 L2 L2
SLPDU058-00

2x16mm², L1≤10m

L1
PSS S1 40A L1
X6 terminal
S1 40A
Alarm Cable
-48V DC S1 40A
L1

Page 17 17
Scenario A3: ≤ 80m between Rosenberger OVP and AAU

Material Qty Description


AAU5613 AAU5613 AAU5613 Rosenberger OVP box 1pcs
OCB 1 pcs/sector
Cable between OCB and AAU. Up to 10 m. All
L3 2x6mm² cable 1 pcs/sector
types of current cables

2x6mm², L3≤10mL3 L3 L3 L2 2x25mm² cable 1 pcs/sector


Cable between Rosenberger OVP and OCB
From 51m to 80 m, NYCWY or Rosenberger

SLPDU059-00 Cable between Delta and Rosenberger OVP


L1 2x16mm² cable 1 pcs/sector
up to 10 m, NYCWY or Rosenberger or H07RN-F

2x25mm², L2 ≤80mL2 L2 L2
SLPDU058-00

2x16mm², L1≤10m

L1
PSS S1 40A
L1
X6 terminal
S1 40A
Alarm Cable
-48V DC S1 40A
L1

Page 18 18
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• GND

19
BBU5900 Power Solution
Solution 1
BBU5900 always new DCDU12b!
(DCDU11b can be exceptionally reused, follow Huawei installation guide)

UPEU Use 25A or 30A Breaker


Power Supply System
ABB Breaker at Priority Line
UPEU Load 0 1 2 3 4 5 6 7 8 9 (all 30A)
delivered max. 20m
Huawei Power cable 4mm 2 diameter Cable specification Breaker ABB
2x2x16mm2 SL2C16MM2FRNC-S-BK-R or H07RN-F 2pieces 1p-50A
1x2x35mm2 SL2C35MM2FRNC-S-BK-R or H07RN-F 1piece 2p-50A

Exceptional case
BBU5900

UPEU Power Supply System


use ABB 4x 1p-32A
UPEU at Priority Line
delivered Huawei Power cable 4mm 2
or
Rosenberger SL2C4MM2FRNC-S-BK-R
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules

21
DC cable grounding rules – Where?
1. grounding clip must be near to inlet of a building/container in case the OVP is indoors.
No grounding near to inlet of a building/container or Cabinet in case the OVP is outdoors.
OVP outdoors

OVP is indoors

Valid only in case that grounding of shielding is done in distribution box on one side and RRU or OCB on the other one. See following pages.
It is the case of all scenarios described in this document!

Page 22 22
DC cable grounding rules 1/2 – How?
1a. Cabinet – Outdoor Delta –
no grounding of the cable to Distribution Box in cabinet X
just cut and wrap with isolation tape
X
X
1b. Room - Indoor Delta - no grounding in the cabinet X

2. OVP & OCB Box Rosenberger and Huawei DC Box (see MA_SLPDU058-xx.pdf)
Always attach shielding to the clamp. Ensure solid metallic contact!

Examples:
For cable specific information refer to
MA_SLPDU058-xx.pdf

MA_SLPDU058-xx.pdf

Page 23 23
DC cable grounding rules 2/2 – How?
3. RRU & MEB
YES NO

professional pressing

4. GND clip Don’t cut the shield

a) remove isolation - length based on producer specification


b) isolate professionally – waterproof, UV resistant
c) secure with cable tight, GND cable pointing downwards to certified GND clamp