Security Level:
1
Version Control
2
Overview – introduction, ALL Scenarios
Power requirements of new products led to update of solution scenarios Single band RRU (<500W average power)
Delivery of Huawei OVP was stopped. Can’t be installed anymore. Scenario Description
Only new Rosenberger OVP SLPDU058-00 or/and Huawei DC Box only to be used Scenario S1 ≤20m between DC Box and RRU 4mm2
Rosenberger OCB (Outdoor Connection Box) SLPDU059-00 introduced 21m ~50m between Rosenberger OVP and DC Box 16mm2
Scenario S2
Its use depends on distance between RRU and Rosenberger OVP box
Cable wire diameter is calculated by distance between RRU and Rosenberger OVP. Scenario S3 51m ~100m between Rosenberger OVP and DC Box 2x16mm2
Special mix scenario for Multiband RRU(>500W) and single band RRU up to 20m only (M1.2)
In case of changing or installing new RRU, new Rosenberger OVP box is needed Multiband RRU(valid for RRU5501,RRU5509t,RRU5519et)
New BBU5900 introduced (refer to separate chapter in this .ppt)
Grounding concept updated (refer to separate chapter in this .ppt) Scenario Description
Use breakers characteristic B or C. Values defined for particular scenarios! Special Scenario M1.1 ≤20m between DC Box and RRU 4mm2 3 Multiband RRU only
precondition! Scenario M1.2 ≤20m between DC Box and RRU 4mm2 ”Mixed”
Huawei recommendation: Scenario M2 ≤40m between Rosenberger OVP and RRU 6mm2
use Rosenberger cables and accessories only Scenario M3 41m ~ 60m between Rosenberger OVP and RRU 10mm2
• lightweight
Scenario M4 61m ~ 100m between Rosenberger OVP and RRU 16mm2
• stock management simplified
• end to end solution products
• Hotline support 5G AAU
Scenario Description
Scenario A1 ≤20m between Rosenberger OVP and AAU 6mm2
Special cases e.g. distance higher than in above scenarios or exceptional cases
need to be approved by VEFK Huawei – heiko.zander@huawei.com
Page 3 3
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules
4
Singleband RRU Power Solution(Summary)
Delivery of Huawei OVP was stopped. Can’t be installed anymore.
Only new Rosenberger OVP SLPDU058-00 or/and Huawei DC Box only to be used
In case of changing or installing new RRU, new Rosenberger OVP box is needed
To see original old solutions please refer to Germany VDF_site_solution guide(2017))
New BBU5900 introduced (refer to separate chapter in this .ppt)
5
Scenario S1: up to 20m between DC Box and RRU
Breaker B or C
Use 2p-50A
6
Scenario S2: 21 to 50m between OVP and DC-Box
Rosenberger OVP
SLPDU058-00
Note:
For Rosenberger OVP follow Rosenberger ‘s installation guide.
In case of any questions contact Rosenberger support
7
Scenario S3: 51 to 100 m between OVP and DC-Box
50A 50A
Note:
For Rosenberger OVP follow Rosenberger ‘s installation guide.
In case of any questions contact Rosenberger support
8
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules
9
Special Scenario M1.1: ≤20m between Huawei DC BOX and RRU - 3 Multiband RR
U only Huawei DC box reuse or new for the same level installation.
Material Qty Description
Huawei DC box 1pcs in case of new
Max 3 Multiband RRU L2 2x4mm²
1 pcs/sector
Cable between distribution Box and RRU
up to 20m, Power cable NYCWY or Rosenberger
cable SL2CXXMM2FRNC-S-BK-R or N2XC2Y
R R R L1 2x16mm²
1pcs (reuse Cable between Delta and distribution Box
case) up to 20m, NYCWY or Rosenberger
R R R cable 2pcs (new case) SL2CXXMM2FRNC-S-BK-R
U U U
PSS, DC Box and RRU
must be on the same level!
use only positions 0, 2 and
L2 4!!
L2 L2
thermal dissipation security!
Page 10 10
Special Scenario M1.2: ≤20m between Huawei DC BOX and RRU – “Mixed”
Huawei DC box reuse or new for the same level installation.
Material Qty Description
Huawei DC box 1pcs in case of new
Max 3 Multiband RRU L2 2x4mm²
1 pcs/sector
Cable between distribution Box and RRU
up to 20m, Power cable NYCWY or Rosenberger
cable SL2CXXMM2FRNC-S-BK-R or N2XC2Y
R R R R R R L1 2x16mm² Cable between Delta and distribution Box
2pcs up to 20m, NYCWY or Rosenberger
R R R R R R cable
SL2CXXMM2FRNC-S-BK-R
U U U U U U
2x 2x16m2 between OVP and Power Supply are necessary
If missing, install the 2nd one and connect to 1p-50A, and check the 1st breaker
L2 also 1p-50A (if not change!)
L2 For Multiband use only
L2 L2 L2 PSS, DC Box and RRU must be on the same level!
L2 positions 0, 2 and 4!!
thermal dissipation security!
See previous slide for detail
Page 11 11
Scenario M2: ≤40m between Rosenberger OVP and Multiband RRU
both Rosenberger and NYCWY power cable
Multi-Band RRU Rosenberger SL2CXXMM2 FRNC-S-BK-r
RRU5501, Material Qty Description
Rosenberger OVP box 1pcs
RRU5509t,
R R R 1 Cable between Rosenberger OVP
RRU5519et L2 2x6mm² cable
R R R pcs/sector and RRU up to 40 m
U U U 1 Cable between Delta and
L1 2x10mm² cable
pcs/sector Rosenberger OVP up to 10 m
2x6mm², L2≤40mL2 L2 L2
NYCWY
Material Qty Description
SLPDU058-00 Rosenberger OVP box 1pcs
2x10mm², L1≤10m
32A or DCDU 30A
43.2V-54V output X6 terminal
PSS S1 32A/30A Alarm Cable Multiband RRU
L1
R RRU5501,
-48V S2 32A/30A L1 R RRU5509t,
DC S3 32A/30A L1 U
RRU5519et
Page 12 12
Scenario M3: ≤60m between Rosenberger OVP and Multiband RRU
only Rosenberger power cable
Rosenberger SL2C10MM2 FRNC-S-BK-r
Material Qty Description
Rosenberger OVP box 1pcs
Cable between Rosenberger OVP and
R R R L2 2x10mm² cable 1 pcs/sector RRU up to 60 m, SL2C10MM2 FRNC-S-
R R R BK-r
U U U Cable between Delta and OVPup to 10
L1 2x10mm² cable 1 pcs/sector
m, SL2C10MM2 FRNC-S-BK-r
2x10mm², L2≤60mL2 L2 L2
SLPDU058-00
2x10mm², L1≤10m
32A or DCDU 30A
43.2V-54V output X6 terminal
PSS S1 32A/30A Alarm Cable Multiband RRU
L1
R RRU5501,
-48V S2 32A/30A L1 R RRU5509t,
DC S3 32A/30A L1 U
RRU5519et
Page 13 13
Scenario M4: 61m ~ 100m between Rosenberger OVP and OCB
Rosenberger & N2xC2Y or NYCWY & N2xC2Y
R R R Rosenberger SL2C FRNC-S-BK-r L1,L2,L3
R R R
U U U
NYCWY L1,L2,L3
2x4mm², L3≤10mL3 L3 L3
Note :
SLPDU059-00
Only L3 4mm2 power cable can use N2xC2Y (Huawei Cable), otherwise cannot.
Material Qty Description
Rosenberger OVP box 1pcs
2x16mm², 60m<L2 ≤100m
L2 L2 L2 OCB 1 pcs/sector
L3 2x4mm² cable 1 pcs/sector Cable between OCB and RRU up to 10 m
Cable between Rosenberger OVP and OCB
SLPDU058-00
L2 2x16mm² cable 1 pcs/sector From 61m to 100m, NYCWY or Rosenberger SL2C16MM2
FRNC-S-BK-r
Cable between Delta and Rosenberger OVP
L1 2x10mm² cable 1 pcs/sector up to 10m, NYCWY or Rosenberger SL2C16MM2 FRNC-S-
BK-r
2x10mm², L1≤10m
32A or DCDU 30A
PSS S1 32A/30A L1
X6 terminal Multiband RRU
L1 Alarm Cable
-48V S2 32A/30A
R RRU5501,
L1
DC S3 32A/30A R RRU5509t,
43.2V-54V output U
RRU5519et
Page 14 14
• Singleband RRU
• Multiband RRU
• 5G AAU
• BBU5900
• DC Cable grounding rules
15
Scenario A1: ≤20m between Rosenberger OVP and AAU
2x6mm², L2≤20m L2 L2 L2
SLPDU058-00
2x16mm², L1≤10m
L1
X6 terminal
PSS S1 40A
L1 Alarm Cable
S1 40A
-48V DC S1 40A
L1
Page 16 16
Scenario A2: ≤ 50m between Rosenberger OVP and AAU
2x16mm², L2 ≤50mL2 L2 L2
SLPDU058-00
2x16mm², L1≤10m
L1
PSS S1 40A L1
X6 terminal
S1 40A
Alarm Cable
-48V DC S1 40A
L1
Page 17 17
Scenario A3: ≤ 80m between Rosenberger OVP and AAU
2x25mm², L2 ≤80mL2 L2 L2
SLPDU058-00
2x16mm², L1≤10m
L1
PSS S1 40A
L1
X6 terminal
S1 40A
Alarm Cable
-48V DC S1 40A
L1
Page 18 18
• Single band RRU
• Multiband RRU
• 5G AAU
• BBU5900
• GND
19
BBU5900 Power Solution
Solution 1
BBU5900 always new DCDU12b!
(DCDU11b can be exceptionally reused, follow Huawei installation guide)
Exceptional case
BBU5900
21
DC cable grounding rules – Where?
1. grounding clip must be near to inlet of a building/container in case the OVP is indoors.
No grounding near to inlet of a building/container or Cabinet in case the OVP is outdoors.
OVP outdoors
OVP is indoors
Valid only in case that grounding of shielding is done in distribution box on one side and RRU or OCB on the other one. See following pages.
It is the case of all scenarios described in this document!
Page 22 22
DC cable grounding rules 1/2 – How?
1a. Cabinet – Outdoor Delta –
no grounding of the cable to Distribution Box in cabinet X
just cut and wrap with isolation tape
X
X
1b. Room - Indoor Delta - no grounding in the cabinet X
2. OVP & OCB Box Rosenberger and Huawei DC Box (see MA_SLPDU058-xx.pdf)
Always attach shielding to the clamp. Ensure solid metallic contact!
Examples:
For cable specific information refer to
MA_SLPDU058-xx.pdf
MA_SLPDU058-xx.pdf
Page 23 23
DC cable grounding rules 2/2 – How?
3. RRU & MEB
YES NO
professional pressing
Page 24 24