You are on page 1of 8

Course: Introduction To product and operation

management.

Course ID: MGT330

Course Instructor: DR. MD KHASHIDUZZAMAN

TOPIC: CONSTRAINT MANAGEMENT

COMPANY : AARONG (RMG)

TEAM : GOLDRATT
INTRODUCTION
ENTERPRISE OF BRAC

LEADING FASHION HOUSE IN BANGLADESH

MAINTAIN THE BASIC CHARACTERISTICS

PRODUCED BY HUMAN HAND AND HIGH QULLITY MECHINARIES

AARONG TARGET FOCUS ON THIS CORONA PANDEMIC

CORONA PENDAMIC EFFECT THE MANUFACTURING INDUSTRIES

GOVERNMENT NEW WORKING ENVIROMENT LAW

CEO WANTS TO MEET THE MARKET DEMAND

EFFICIENT WORKING STATION

QUALITY STANDARD
WHY DO AARONG NEED CONSTRAINMENT MANAGEMENT PLANNING?

FOUCS ON BALANCING FLOW NOT IN BALANCING CAPACITY

EFFICIENTY REACH THEIR DESIRE OUTCOME

MAKE THE BOTTLENECK MORE SUFFICIENT

MAINTAIN THE PRODUCT QUALITY IS THE ULTIMATE KEY FOR AARONG

IN THIS PENDAMIC CEO WANTS TO PROFUCED 160 UNIT PER 7 HOURS SHIFT IN 2 MONTHS
WORKING STATIONS

A. Receiving fabric and relaxing B. Form lay out and cutting C. Fabric laying

E. Fabric cutting F. Embroiling and screen printing


D. Fabric marking

H.CHECKING AND LAUNDRY I. FUSSING AND PRESSING


G. SEWING

J. PACKAGING AND DELIVERY


BOTTLENECK

WORK STATION ‘H’ CONSIDER AS BOTTLENECK


INSPECT ALL THE INDIVIDUAL PRODUCT TO ENSURE THE PRODUCT QUALITY
WORKER NUMBER IS LOW DUE TO THIS PANDEMIC
IT TAKES TO 120 SEC FOR PER ladies kurti

Work station assemble line

A =90 F=50 G=25


sec

Summation of all working time is 427 second


B =40 E =28 H=120

C =13
sec
D =sec I=17 J=20
Cycle time

Cycle time showing 157.5 seconds 7 hours work shift convert into 25200
seconds
And the unit is 160 ladies kurti.
Theoretical minimum number
Putting in the TM formula it shows there need 2.711 or 3 stations to finished the work

Station 1 ( with A,B AND C)

STATION 2 ( D, E,F AND G)

STATION 3 ( H,I AND J )


IDLE TIME

Where ,
Number of cycle time is 157.5
Total time 427 seconds
With 3 three group work station can gain 45.5 extra time

Efficiency

Our line balancing Efficiency shows 90.37%


Balance delay

Balance delay is 9.63%