PDO

NORM Management System

Brett Young

21 –23 Feb 2005 NORM Workshop 2005


Specification SP 1170
Version .3.0

– Defines responsibilities
– Est. Dose limits
– Inc. NORM Radiological Surveys
into the PTW
– Training
– Transport and Storage Locations
– Emergency Procedures
– Incorporates NORM Management
Guidelines
21 –23 Feb 2005 NORM Workshop 2005
SP 1170
• PDO Policy
– Plant that has conveyed or stored production fluids
(water/oil) or gas are potentially NORM contaminated.
• Dose Limits
– 1 mSv/year for PDO workers & contractors
– NORM Guideline CSM.001 provides guidance on
action limits
• Inhalation / Ingestions Limits
– 5 cps above background - PPE

21 –23 Feb 2005 NORM Workshop 2005


NORM Management Guidelines
• Based on Syrian Guidelines
– “How to”….. guidelines
– Inc. NRS in PTW for consistency of approach
– Added flow charts for specific activities
– Modified to include PDO’s meters

21 –23 Feb 2005 NORM Workshop 2005


HEMP - Permit To Work
• Production oil/gas/water - conveyed/stored
– Trips PTW which requires a NORM
Radiological Survey (NRS)
– Measurements conducted by RPT
– Recorded and attached to PTW
– NRS stipulates controls
• e.g. PPE, Supervised/Controlled Areas.

21 –23 Feb 2005 NORM Workshop 2005


Example - Zauliyah
• Measurements for Tank T7402
– Ground 5 μSv/hour (450 - 500 cps) exterior wall
– At 50 cm above ground = 2.0 μSv/hr exterior wall
– At 1.0 m above ground = 1.5 μSv/hr (125 cps) exterior wall
– At 1.5 m above ground = 20 cps exterior wall

Inside tank in centre approx. 15 - 20 μSv/hr


Workers 4 hrs per day inside cleaning = 80 μSv/day

80 uSv/day x 14 (days) = 1120 μSv/2 weeks inside tank


> 1 mSv/2 weeks
21 –23 Feb 2005 NORM Workshop 2005
NORM Radiological Survey √ 24372
21 –23 Feb 2005 NORM Workshop 2005
Example of NORM Survey Report Certificate No: 24372
DATE TIME WORK INSTS USED TESTED CONTAMINATION TYPE CONDITION WORK TYPE BACKGROUND
30/01/2005 PERMIT No: (TICK) (TICK)
24362 MiNI MONITOR - EP 15 SLUDGE √ WET 3 CPS
WET
FIELD LOCATION: Zauliyah MINI MONITOR - 44A/B √ SAND DRY CPS
GRAETZ 5X DOSE-RATE √ SCALE HOT CPS
DRY
Mini 1000 Dose-Rate Meter FLUID AGGRESSIVE 0.1 Sv/h
Mini 900
EXTERNAL Mini 900 44A/B Probe
EP15 Probe
OR INTERNAL GAMMA Sv/h GAMMA Sv/h
Equipm ent/Area tested (E / I) CPS CPS CONTACT AT WORK POSITION
Tank 7402 at bottom Ext 500 5.2 1 - 5.2
exterior at 50 cm above base Ext 200 20 20
1.5 metres high on exterior of tank Ext 25 0.2 1-5.2
Internal dose rate of tank Int. 800 20 20

Job Supervisor to com plete and pass to Focal Point


Special NORM Precautions: (Tick as appropriate) after perm it closure. RPA to com plete
Impervious/disposable coverall, hood, PVC/rubber gloves, (rubber)
DEPARTMENT /
√ boots,goggles. PERSONNEL INVOLVED TOTAL HOURS ESTIMATED DOSE IN
CONTRACTOR
√ If > 5 cps above background use filtering face-piece respirator type P3 (FFP3). IN NORM WORK WORKED μSv/h (μSv/day)
√ Area demarcation & w arning signs required Moh'd UIB 10 3 (24)
Welding - Full face respirator w ith P3 filter. On RPS Advice Ahmed OICC 10 3 (24)
√ Air supplied respiratory equipment. On RPS Advice Patel OICC 10 20 (80)
√ If Dose-Rate > 1Sv/h - Record exposed w orkers names in next column. Dharm a Al-Hassan 10 1 (8)
If Dose-Rate > 7.5Sv/h Contact RPS or CRFP for advice and restrict entry. Khalifa OICC 10 20 (80)
√ Area demarcation & w arning signs required Soud OICC 10 20 (80)
√ Floor area to be covered w ith heavy quality polythene sheeting Vikhram OICC 10 20 (80)
√ Washing/decontamination facilities required for w orkers
√ Workers to be checked for NORM contamination before leaving radiological area
√ Contamination check of area and tools required after completing w ork.
Contaminated items to be w rapped in plastic sheet and labelled w ith signs
√ Transport & Disposal arrangements required for contaminated materials

SURVEYED BY NAME REF IND.DATE SUPERVISOR NAME DATE


RPS/RPT Brett Young MSE 32 30/1/2005 Moh'd Al-Bahja

Distribution: White copy: Attach to Work Permit. Pink copy: PDO Supervisor/Operator, to keep copy at site. Green copy: Local RPS/RPT Records
21 –23 Feb 2005 NORM Workshop 2005
Monitoring of Personnel
• Action Limit 1 μSv/hour
• Record on NORM Radiological Survey
• Attached to PTW
• RPT estimates workers daily dose
• > 8 μSv/day record into a database

• Risk assessment - Tank cleaners and sludge farm


operators required to wear TLD Badge
21 –23 Feb 2005 NORM Workshop 2005
Bahja NORM Storage facility
400 m
Entrance

* Concrete pad
Rest Room 100 m x 50 m
& Toilet 400 m

gate
2 Pits
Sludge Storage
100m*10m*1m depth

Scrap metal Drum storage Tubulars


50m x 25m 50m x 25m
50m x 25m

21 –23 Feb 2005 NORM Workshop 2005


NORM Survey Proposal
Reservoir to Min Al Fahal (MAF)
• Oil/water/gas  wells  manifold/gathering station
 Main pumping station (MPS)  MAF tanks

Survey Proposal
• Survey backwards from MPS (dehydration tanks) 
Gathering Stations (separators)  % well heads
• Fields declared
– Green (NORM Free)
– Yellow (NORM Suspected)
– Red (Known NORM)
• Work back as to which geology, depth, water chemistry,
E.O.R. programs are likely to produce NORM
21 –23 Feb 2005 NORM Workshop 2005
Further discussion
1. Does PDO need dedicated Interior based RPS?
2. How do other organisations consistently identify
contaminated plant/areas? Do you use a PTW
system or other?
3. Are surveys a useful tool? Do you utilise a
similar method or other than proposed?

21 –23 Feb 2005 NORM Workshop 2005