This document proposes a model for grid voltage synchronization of distributed generation systems under grid fault conditions. A block diagram and connection diagram are presented, along with the equipment used such as an AVR microcontroller, CT/PT, ADC, IGBT, and solar panel. A flowchart shows the working process. Advantages include reduced fault time, increased power factor and efficiency, and minimum settlement time. The conclusion states that the proposed algorithm allows for quick synchronization within 47.50 seconds under faulty conditions using a PR controller.
This document proposes a model for grid voltage synchronization of distributed generation systems under grid fault conditions. A block diagram and connection diagram are presented, along with the equipment used such as an AVR microcontroller, CT/PT, ADC, IGBT, and solar panel. A flowchart shows the working process. Advantages include reduced fault time, increased power factor and efficiency, and minimum settlement time. The conclusion states that the proposed algorithm allows for quick synchronization within 47.50 seconds under faulty conditions using a PR controller.
This document proposes a model for grid voltage synchronization of distributed generation systems under grid fault conditions. A block diagram and connection diagram are presented, along with the equipment used such as an AVR microcontroller, CT/PT, ADC, IGBT, and solar panel. A flowchart shows the working process. Advantages include reduced fault time, increased power factor and efficiency, and minimum settlement time. The conclusion states that the proposed algorithm allows for quick synchronization within 47.50 seconds under faulty conditions using a PR controller.
Content: Abstract Proposed model Block diagram Equipment used Connection diagram Flowchart for working Advantages Conclusion Abstract : Power system has electrical energy as the vital part the energy can be acquired from the sustainable and non-sustainable sources like solar, wind, biomass, water, and coal, nuclear, oil, thermal respectively In past the synchronization is the real issue because of the time utilization for the estimation of grid variables. In this work the batery based distributed generator is considered for the analysis. Proposed model : The grid related process, each and every DG procedure is ordinarily coordinated to contribute or embed energy to the grid supply, which is the current regulate form in unbending harmony with the network. Block diagram: Equipment used: AVR MICROCONTROLLER CT/PT ADC or IGBT 25N120 BC 547 transistor Voltage regulator- 780 and 7812 5 Solar panel Battery STEP-UP TRANSFORMER Connection diagram: Flow chart for working: Advantages : ItReduce Fault time. Increase Power Factor(>95). Reduce Harmonics Increase Efficiency Minimum settle Time Cost effective Conclusion : The algorithm to make the system as quick convergence. The yield of the inverter and the grid is nearly accomplishing a similar value. The quick synchronization can take 47.50 seconds under faulty conditions. The execution examination is done with the current PI controller. The P-V, I-V qualities of voltage, current and power is estimated from the PV system. The proposed algorithm for derivation of controller parameters with PR controller provides Quick synchronization with lesser THD percentage was observed through this work THANK YOU