Professional Documents
Culture Documents
Control Loop
1- Prerequisites
a- PID
b- Water / Steam Curve
c- Instrumentation
2- HRSG
a- LP Eco
b- Drum Levels
c- FW Pumps
d- HP Steam Temp
e- HRH Steam Temp
f- Steam Bypasses
CTCC Sabon 109FA – ICS Training
Control Loop
3- BOP
a- Condensate Pump
b- Condenser Level
c- Auxilliary Steam and
Cooling Steam
CTCC Sabon 109FA – ICS Training
Control Valve
Gas Fuel
CTCC Sabon 109FA – ICS Training
P + +
Setpoint + Actuator
I +
+
+
- D
PID Controller
Process
Variable
Process
CTCC Sabon 109FA – ICS Training
1- Prerequisites
b- Water and Steam Curve
H2O – Saturation Curve
320°C
280°C
240°C
200°C
Temperature in °C
160°C
120°C
80°C
40°C
0°C
10 20 30 40 50 60 70 80 90 100 120
Pressure in Bara
CTCC Sabon 109FA – ICS Training
Level
Range
p
CTCC Sabon 109FA – ICS Training
1- Prerequisites
c- Instrumentation
Water and Steam Flow Calculation
PT TT p
2- HRSG
a- LP Eco
Water
To LP Drum
TT TT
dPmax
Setpoint = PV PID
LP Drum dP
Tsat – 5°C FT
PID
Setpoint =
Function of
Low Select Fuel Gas
Sulfur’s rate
PID TT
Water
From Condensate
CTCC Sabon 109FA – ICS Training
2- HRSG
b- Drum Level
1 Element Control
PT
Or PV
= 0 mm
(NWL)
Water Water and Steam
CTCC Sabon 109FA – ICS Training
2- HRSG
b- Drum Level
3 Elements Control
PT
FT
FT
Drum Drum Level
LT Calculation
PV
Bias
PID
PV PID Setpoint =
Setpoint f(drum
pressure)
Water Water and Steam
(during
startup)
Or
= 0 mm
(NWL)
CTCC Sabon 109FA – ICS Training
2- HRSG
b- Drum Level Drum Level Start Up Curve
Pressure
CTCC Sabon 109FA – ICS Training
2- HRSG IP FW Pumps
c- FW Pumps
IP Drum
LP Drum
PV
FT PID
Setpoint = 34 t/h
CTCC Sabon 109FA – ICS Training
HP Drum
LP Drum
FT
PT TT
PV PID
Hydrocoupling
Water Density
Flow Setpoint
F(x,y)
M RPM
Manufacturer Curve
CTCC Sabon 109FA – ICS Training
H L
dPT
HP Drum
LP Drum
PV
PID dP Setpoint = 16 Bar
M
CTCC Sabon 109FA – ICS Training
2- HRSG
d- HP Steam Temp
Steam to HP ST Steam from HP
Superheater
TT
PV
Max Setpoint
PID
= 566 °C
Setpoint
PID PV
TT
Water from
HP FW Pump
CTCC Sabon 109FA – ICS Training
2- HRSG
e- HRH Steam Temp
Steam to IP ST Steam from IP
Superheater
TT Steam from HP ST
Outlet
PV
Max Setpoint
PID
= 566 °C
Setpoint
PID PV
TT
Water from IP
FW Pump
CTCC Sabon 109FA – ICS Training
2- HRSG
f- Steam Bypasses
PID Setpoint
PV
PT
Steam from
Superheater
TT
Water from
Condenser Condensate
PV
Setpoint PID
2- HRSG Required
Water Flow
f- Steam Bypasses
Steam
Energy
Steam Flow
Caculation
PT TT
Steam from
Superheater
TT
Water from
Condenser Condensate
PV
Setpoint PV
Setpoint PID PID FT
Bias
3- BOP
a- Condensate Pumps
Condenser
PV PID Setpoint :
1 or 2 pumps running
FT
To HRSG, Bypass
Attemperation …
CTCC Sabon 109FA – ICS Training
Setpoint = 63 mm
3- BOP
b- Condenser Level Setpoint = 44 mm
PID PID
PV PV
LT
Condenser
Recirculation
To HRSG,
Bypass
Attemp …
CTCC Sabon 109FA – ICS Training
To drain system
PV
PID dPT
PID PV
Setpoint = Setpoint =
f(Condenser pressure) Required Steam
Flow (calculated)