You are on page 1of 4

High water cut : 1-Casing leaks(vertical well )

Entering water to the production string as results to the leaks.

 Reasons :
 High the pressure.
 bad of cementing process.

Oil
 Solutions : zone

 bridge plugs.

 Cement plug.

 packers. Water zone

leak

this figure showing the Casing leaks


High water cut : 1-Casing leaks (vertical well )

 This type is prime candidate for low- cost,


inside-casing water shut- off technology.

Figure 1 using inflatable packer

Figure2 using bridge plug


High water cut : 2-Channel flow behind casing

Failed primary cementing can connect water- bearing zones to the pay
zone (below middle).

 Reasons :
bad primary cementing. oil
Poor cement

 Solutions :
high-strength squeeze cement(secondary cementing). water

Fig.Channel flow behind casing

You might also like