Professional Documents
Culture Documents
2021
content
Mechanism
Leaks through casing, tubing or packers allow water from
non- oil-productive zones to enter the production string.
OIL
REASONS :
High pressure
Bad cementing Casing leak
water
Solution
shutoff using plugs, cement and packers
plugs
oil
water
Mechanism
These channels allow water to flow behind casing in
the annulus and it inside into wellbore.
Oil
Reasons
Poor cement
Solution
gel (quite small path)
squeeze cement
gel & cement
water
Side track
REASONS :
high production rate
Lower density difference
High vertical permeability
OWC
Oil mobility
Water coning
high water production in all the oil reservoirs is consider from the
production problems which it adversely impact to the oil production