The Schedule of Rates (SOR) is a standard document used in public sector construction that provides estimated rates for materials, labor, and equipment to aid in project costing, tendering, and contracting. Major government departments that utilize SORs include CPWD, PWD, WRD, and Irrigation Departments. Targeting departments with large construction budgets that conduct repetitive types of work where product solutions are applicable will help in gaining departmental approval and inclusion in SOR lists.
The Schedule of Rates (SOR) is a standard document used in public sector construction that provides estimated rates for materials, labor, and equipment to aid in project costing, tendering, and contracting. Major government departments that utilize SORs include CPWD, PWD, WRD, and Irrigation Departments. Targeting departments with large construction budgets that conduct repetitive types of work where product solutions are applicable will help in gaining departmental approval and inclusion in SOR lists.
The Schedule of Rates (SOR) is a standard document used in public sector construction that provides estimated rates for materials, labor, and equipment to aid in project costing, tendering, and contracting. Major government departments that utilize SORs include CPWD, PWD, WRD, and Irrigation Departments. Targeting departments with large construction budgets that conduct repetitive types of work where product solutions are applicable will help in gaining departmental approval and inclusion in SOR lists.
The Schedule of Rates is well known as rate guide in the construction
industry and is the standard document used in public sector construction work. It is considered as key reference for •estimating, •tendering and •contracting work in the construction sector.
It helps in benchmarking and ensuring that planned construction is carried
out cost effectively as possible
DEPARTMENTAL APPROVAL is different from PROJECT
SPECIFICATION. Departments which have SOR’s? • CPWD • PWD • WRD • Irrigation Departments • R&B • Building Construction Division DEPARTMENTAL APPROVAL is different from PROJECT SPECIFICATION. Departmental approvals • Some departments have their own List of Approved products. These departments may vary from State to state. Some examples are – CIDCO – IWD – DGSND – DGNP etc. DEPARTMENTAL APPROVAL is different from PROJECT SPECIFICATION. Which departments to target • Departments with maximum fund • Repetitive nature of work where our scope prevails • PWD and WRD shall be given maximum importance
DEPARTMENTAL APPROVAL is different from PROJECT
SPECIFICATION. How to do it? • Liason with departments • Find out the projects, other works and understand our solution/products scope • Convey the suitability of solution and products and put forward the request of inclusion • Start interaction at Top level-Like CE/SE • Take off Department Approval/Schedule of Rates may have the following steps. You may find out the exact procedure of the department that individual region is selecting: • Product Registration form • Details and Documents to be attached. (Company Details, Project Credentials, Projects details etc) • Submission to concerned person who will move our case ahead • Understand the hierarchy (how our case will move-Procedure and the related officers) • Consultancy Charges that may be required • Presentation and Regular meetings • Visit to Factory (Please do not initiate this from our side, only if it is mandatory or the client is insisting we need to move this) Immediate Tools
• Existing SOR’s of other state’s similar
departments • IS-16014:2012 • IRC 34 • IRC 56 • Credential and past performance of same department if any Assignment 1-Give Our Equivalent • Gabian Structure (Providing and construction of a gabain structure with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanized steel wire @ 32 kg per 10sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire Assignment 2 • From your SOR yearly planner, Identify the relevant officials(of department targeted) whom to be contacted and list the procedure for SOR- These details to be provided for Minimum 3 no of SOR before 13th March