OUTLINE
Expected Challenges
Mitigation Plans
A detailed plan will be prepared after the inspection of the drilling site
is carried out by our Field crew.
2-3 Trucks will be needed for mobilization of equipment and other
required items to site
OILFIELD MANAGEMENT SERVICES
LIMITED
Inspection and test running of equipment for the H-PTP QAQC team before
Load out
A comprehensive list shall be compiled for all items on trucks. This list
shall also act as checklist to ensure that all required items have been
loaded on trucks.
The items list shall contain the equipment description/name, quantity on
the location on truck
OILFIELD MANAGEMENT SERVICES
LIMITED
Expected Challenges
Equipment Failures
Belts failures
Plugging of Equipments
Insufficient Skips
OILFIELD MANAGEMENT SERVICES
LIMITED
Challenges Mitigation
All equipment are installed with requisite sensors to ensure easy
troubleshooting.
We have highly trained and experienced personnel that can respond
to any operational issues, as each crew consist of a mechanic, an
electrician and a welder.
We ensure that spares that are prone to failure made available on
site.
To account for all eventualities, we have in place a 24hr operational
support and logistics team.
The team should ensure that sufficient skips quantity are always
available.
OILFIELD MANAGEMENT SERVICES
LIMITED
The field team shall consist of 2 crews of 3 personnel, with each crew running
the 12 hours shift. Each crew shall consist of a supervisor a mechanic and an
Electrician for prompt turn around time for repairs and maintenance during