Objective
GIFT
Water intake Crude tie-in point FCP Facilities Wellpad Garraf Base
facilities camp (GBC)
iver
H F 28
12” 15km Light Oil km
”8
Highw
fR
18 J 28
True North 2015
Garra
PL WP-E C 28
28” 107km Heavy Oil
ay # 7
r e
v e ak
D 28
2018
Ri Int
ird ter H 21
Th Wa
Badra – Garraf G 14
2019
om m
Tie-in WP-C K 35
Fr 32k
WP-P B 7
Ga 2027 D 7
rr af GIFT WP-A H 7
Co
il
tO
ntr WP-Q
act
Ligh
WP-H
PG
Ar WP-F
ea
km L
Bo
2 km
Legend un
da
9
8” 9 2
Road ry
28”
River WP-K
Light Oil Pipeline WP-J
Dry Gas Pipeline
LPG Pipeline
Gas
WPF
8 wells
Oil
Gathering
Facilities
WPP
3 wells
WPE
FCP- GATHERING STATION 10 wells
WPQ
6 wells
TRAIN 1 TRAIN 2
5
FCP Process Diagram
GTU
Fuel Gas
Rundown
Off-spec
Cooler
T-1700
T-1400 A
7,950 KL Two Fixed Roof Crude day
( 18” 8 Km) Crude oil storage tanks (2x50,000
Storage Tank
bbl working vol)
On-spec
T-1400 B
7,950 KL
Overall Crude Process Description
Facilities Photos
EXPORT PUMP
POWER PLANT
FLARE STACKS
STORAGE TANKS
8
CCR Operations
CENTER CONTROL ROOM
DCS (Distributed Control System )
- Function Distributed Control System is specially designed with redundancy and diagnostic capabilities to improve control
reliability and performance. It gives greater flexibility to control distributed discrete field devices and its operating stations.
Weather broadcast.
- Function Information wind speed and outside Temperature to monitor plan activity outside.
Toxic chemicals
Electricity
Confined spaces
H2S
Rotating equipment
In order to avoid any incidents and process upset all visitor are obliged to follow PCIHBV Safety
Rules and Regulation which stipulated in ZeTo Rules:
Please be aware that for all activities carried inside the wellpad area all contractors and
visitors must obtain Permit To Work certificate. Only approved and valid permit will allow to
do any activities inside the wellpad area. Examples of activities:
1. Vehicle entry;
2. Taking photo;
3. Excavation works;
4. Lifting loads;
5. Instrumentation calibration;
6. Entering wellhead cellar;
7. Portable generators using;
8. Etc.
Infield Pipelines 9 23
(Oil) 12 (Oil) + 11 (WI)
Power Plant 1 2
(15 MW) (15 +72 MW)
Internal