Out line…
Background Of Nefas Silk Paint
Factory
Over All Internship Experience
Internship Benefit Gained
Proposal Project And Contribution
Conclusion And Recommendation
2
Background Of The Factory
Mission:-
To create highly competitive staff in manufacturing.
To manufacture paint products through operational
efficiency, excellence and sustainability in the market.
To increase remarkable market share at the international
level.
4
Vision:-
Continually decreasing production cost.
To create a sustainable competitive Paint industry.
To be the leading company in paint industry and make more customer.
5
What is paint?
Paint is defined as a unique homogeneous mixture of three
major ingredients namely Binder, Pigment, Additives.
When it applied on the surface as a thin layer that forms a solid
dry adherent film after oxidation/evaporation/ polymerization.
The word paint covers whole varieties of decorative and
protective coating that are used to impart a high degree of
protection to engineering, building, and other materials.
6
Customers of the Company
Societies Industry
around the construction
factory Customers development
of the
Company
Different trade
House
organizations
Construction
that distribute
Company
paint
7
Process Description of paint Production in the
Factory
8
The Organizational Structure and Work Flows of
NSPF
Organizational Structure
In the company, there are 7 different sections that are involved with
different jobs inter-acted one other. These sections are:
Human resource development section
Management office
Raw material store and purchasing section
Product store and sellers’ section
Maintenance section
Production section
Laboratory and quality control section
9
Work Flows of NSPF
General manager
Deputy general
Operation manager
Product and
technician Personal
Quality control
Store
Maintenance administration
General service
10
Overall Internship Experience
To enhance understanding of academic
materials
provide students the opportunity to test their
interest.
Over all
internship To apply what was learned in class (theory,
experience skill development, professionalism) to the
working world.
It is "bridges" between the academic
environment and a future work environment.
11
Section we have been working
Technique department
We have been working in the technique
department.
Forman and
planner section
Identify machinery to be inspected.
Recording maintenance cost and spare
part used on life time history card.
Auto-
Electri
cal
mecha
nical
mecha Distributing maintenance report to
nic
worksh worksh
op op
worksh responsible division that is to the head
op
of technique department and
participate on any maintenance
activity.
12
Power Panel Boards
Distribution panel board:-kid of power panel board has
component of an electricity supply system which divides
an electrical power feed into subsidiary load plane board.
13
PLC is a special form of microprocessor-based on controller that
14
Input and Output device for PLC
The main applications of PLCs are industrial automation and
control of industrial equipment’s.
Input device:-The term sensor is used for an input device that
provides a usable output in response to a specified physical
input.
Output device:- The term actuator is used for the device that
transforms the electrical signal into some more powerful action,
which then results in control of the process
They are output devices which are used to convert energy into
some form/kind of motion
15
The Challenges we have faced
It was so difficult to be familiar to some new technological
machinery.
we haven’t theoretical knowledge about PLC before the
internship so it was difficult to easily understand it.
The Measures we have taken
we tried to observe them with the electricians,
To understand about PLC and other electrical device we
read different books.
16
Internship Benefits Gained
We are almost saw the practical aspects of the courses and
their application in real work.
18
Industrial Problem Solving Capability
19
Improving team playing skill
In company all of the workers’ are sociable. We discuss about the works
and other related issues wisely and in maintenance time work as a team
Leadership Skills
20
AUTOMATIC POCKET PAINT FILLING AND PACKING SYSTEM
USING PLC
Identified problems
In Nefas Silk Paints Factory there are some
problems we identified during our stay for
internship. The main problems are:
Project and Lack of Belt conveyors controlling in case
Contribution of it all works are did in human labor. Some
of this are:- transporting, labeling, packing
etc
The company needs more sensor and other
materials to produce more paint.
21
Objectives
The main objectives of our project is to design the controlling
system and the advantages of the uses controlling technology
for Nefas silk paints factory during paint productions by using
PLC.
Specific Objective
To minimize physical labor.
To minimize time for maintenance.
To minimize wastage time for productions.
To identify the problem easily when the fault is occurring on.
To increase the speed of paint production
To increase the quality of paint production
22
Scope of the project
The scope of our project is not wide. There are many
advanced technologies, which are mainly designed for belt
conveyor controlling system in other factories. Because of
this, the scope of our project concentrates only in nefas silk
paint factory.
24
SYSTEM DESIGN k
t a n
m ix
-
Pre
Paint Thank
Pigments
Auto Manual
25
Software implementation
Flowchart
START
Start button No
pushed?
Yes
Motor = on
Conveyer belt = on
Is there any No
pocket under solenoid valve
Yes
Motor = off
Conveyer belt = off
Solenoid valve = on
Yes
No No
Is the pocket full?
Yes
Solenoid valve = off
Motor = on
Conveyer belt = on
27
Simulation Result After Run The Program
28
Conclusion
29
Recommendation
For company:-
We would like to recommend that nefas silk paints factory should enhance
that have many limitation during paints production.
Adding additional machine with the old machine
Modify all the system control of old line with the computerized system.
Modernize the production of paint using new technology, such as Belt
conveyer using PLC controlling to transport.
For university:-
Also we would like to recommend that Bule Hora University should have
many limitations during our internship and all that we studies. We can try
that limitation as follow:
The university should give different software as one course before
internship.
We understand that the controlling components are the back bone of all factories
and it is essential for the world. So that university must try to fulfill different
types of component.
The university must communicate with the company deeply in order to
30
solve the complex situation for the student.
THANK YOU
FOR
YOUR
ATTENSION!!
31