Sector-Cross Issue means that sector of a site is serving the area in a direction
different to azimuth.
For example, sector 1 is serving the area of sector 2, and sector 2 is serving the
area of sector 1. This is known as complete Sector Cross
When TX feeder cable connected in diversity port and diversity cable connected in
TX port. This problem arises due to jumper cables has been cross-connected
between RRU & Antennas which could be caused due to human mistake during
site activities, also sometime installation and integration not performed by the
same day even sometimes not by the same team. (there are 3 to 10 day different
from installation to integration some time it will take long time)
Ph6 and Ph7 Sector Cross Analysis-HXCT
2. Analysis how you reach to this conclusion :