Client: QATARGAS
1
Doha, 05 Jul 2022 Saipem. Engineering Energy
Saipem Classification - General Use
NFPS PROJECT
Meeting Agenda
Description
• Safety Moment
• AOB
28” CRA PL12S (5.7km) 28” CRA PL13S (10.4km) 28” CRA PL14S (7.8km) 28” CRA PL10S (6.8km) 28” CRA PL12N (11.6km)
28” CRA PL10LS (6.8km)
Awarded under
separate contract
6.6 kV SC12S (3.2km)
11 kV SC13S (19.7km)
6.6 kV SC13S (13.2km)
28” PL10 decom.
IFA:
• Noise Study Report for RP8S
• Noise Study Report for RP11S
• Noise Study Report for RT-2
• Dropped Object Study Report for RP11S
• Fire and Gas Detection Layout for RP8S
• Onshore Plant North Firefighting & Safety equipment layout plans (Slug catcher #1)
AFC WITHHOLD:
• CAP 437 and Helideck Design ReportS for WHP12N, WHP14S, WHP13S, WHP12S, RP8S and RP11S
• Onshore plant south Firefighting & safety equipment layout plans (Slug Catcher #3)
• Onshore Plant North safety sign layouts plans (Slug catcher#1)
LOSS PREVENTION
Documents issued last week
AFC:
• Safety Equipment List for RP11S
• Safety Equipment List for RT-2
• Firewater Hydraulic Analysis for WHP12N
• Hazardous Area Classification Layouts for RP10S
• Hazardous Area Classification Layouts for RT-2
• Safety Sign Layouts for RP10S
• Fire and Gas Detection Layouts for RT-2
• Temporary Refuge Impairment Analysis Report for RT-2
• Temporary Refuge Impairment Analysis Report for RP8S
• Temporary Refuge Impairment Analysis Report for RP11S
• Temporary Refuge Impairment Analysis Report for WHP14S
• Smoke and Gas Ingress Analysis Report for RP8S
• Smoke and Gas Ingress Analysis Report for RP11S
• POB Study – Re-AFC
IFA:
• Hazardous Area Classification Layouts for RP11S
• Fire and Gas Detection Layouts for RP11S
• PID DIFFS for WHP14S and WHP12N – IFH
• Fire Risk Assessment Report for RP8S
• Fire Risk Assessment Report for RP11S
AFC:
• Safety Sign Layouts for RT-2
• Safety Sign Layouts for RP11S
• Firewater Demand Calculation for RT-2
• Helideck Wind Turbulence and Temperature Rise Study Report for WHP12S
10
Action #1, #11, #13, #18, #19, #72, #74, #75, #76, #80 are closed
CONTRACTOR INSTRUMENTATION 15 10 25 PFP Requirement on Valves have been communicated with INS team
Acoustic insulation will be indicated in PIDs
CONTRACTOR STRUCTURAL 2 6 8 Action #24, #25, #28, #29, #30, #49 are closed
Action #2, #4, #5, #8 are closed as PFP Markup at Framing Plan have been sent to
CONTRACTOR STRUCTURAL / SITE 20 4 24 YARD.
Requirement (Markup at Plot Plan) have been shared to SITE / FABRICATION YARD
Action #3, #6, #21, #61, #66, #71, #86, #90 are closed
CONTRACTOR STRUCTURAL / ARCHITECTURAL / 6 8 14
SITE
Requirement have been shared to SITE / FABRICATION YARD
CONTRACTOR PIPING / SITE 7 7 Requirement have been shared to SITE / FABRICATION YARD
STRUCTURAL
MECHANICAL
Action #33, #44 are closed
PIPING
CONTRACTOR ARCHITECTURAL 6 2 8 STR has obtained blast value in their report
MEC has conveyed blast value to vendor packages
INSTRUMENTATION
LOSS PREVENTION
MECHANICAL
CONTRACTOR INSTRUMENTATION 1 1 2 Action #47 is closed
LOSS PREVENTION (safety sign)
Action #36, #37, #52, #53, #54, #55 are closed
COMPANY LOSS PREVENTION 0 6 6 CPY has shared CAP437 Verification checklist, to be included in next revision of the
report
ERM 4 1 5 Action #35 is closed
Total Action 75 47 122
11
CONTRACTOR INSTRUMENTATION 5 2 3
CONTRACTOR STRUCTURAL 5 5 0
CONTRACTOR PIPING / STRUCTURAL 1 1
CONTRACTOR PROCESS 29 12 17
CONTRACTOR PROCESS/ STRUCTURAL 1 1
MECHANICAL /
CONTRACTOR 7 7 .
INSTRUMENTATION
CONTRACTOR LOSS PREVENTION 25 20 5
CONTRACTOR PIPING 1 1
Total Action 74 41 33
12
HAZOP Actions
Area Total Under Sign by CTR or CPY Closed action
GF 286 62 128
BF 121 7 53
ONS 99 22 36
SIL Actions
Area Total Under Sign by CTR or CPY Closed action
GF 9 0 5
BF 9 0 5
ONS 4 3 0
DRA Actions
Area Total Under CTR Sign Closed action
Overall Actions from 1st 33 17 1
DRA
13
14
15