You are on page 1of 25

© ABB India; Power Systems

RTU560 Training. - 1 -
02/12/23

RTU560
© ABB India; Power Systems
RTU560 Training. - 2 -
02/12/23

Tools
Engineering tool RTUtil 560
 RTUtil 560 based on standard Windows®
 Engineering principle acc. IEC1346-1
 Open data exchange concept
 Import/Export of configuration data with MS
EXCEL / CSV-Files
 Automatic Generation of Documentation
 Support of process signal mapping
 Reverse engineering of configuration
data
© ABB India; Power Systems
RTU560 Training. - 3 -
02/12/23
RTU560 Excel Import
 Excel Import
 Easy and quick data entry of addresses and PDP parameters
 Excel tables adaptable to customers’ requirements
© ABB India; Power Systems
RTU560 Training. - 4 -
02/12/23
RTU560 Excel Import
 Benefits
 No special program knowledge required
 Easy and convenient data input with MS Excel
 Copy and Paste for similar process parameters
 Signal Lists in Excel can be used for project documentation
 !!! Engineering times and costs can be reduced considerably !!!
© ABB India; Power Systems
RTU560 Training. - 5 -
02/12/23
Web-Server Functions/ Diagnosis RTU560

 System Diagnosis
 Monitoring of RTU internal error messages
 Process Diagnosis
 Monitoring of all connected process signals
(RTU, SUB-RTU, IED)
 Command Execution for Commissioning
Purposes
 Down- and upload of configuration data
© ABB India; Power Systems
RTU560 Training. - 6 -
02/12/23
© ABB India; Power Systems
RTU560 Training. - 7 -
02/12/23
Web-Server Functions/ Diagnosis RTU560
© ABB India; Power Systems
RTU560 Training. - 8 -
02/12/23
Web-Server Functions/ Diagnosis RTU560
© ABB India; Power Systems
RTU560 Training. - 9 -
02/12/23
Web-Server Functions/ Diagnosis RTU560
© ABB India; Power Systems
RTU560 Training. - 10 -
02/12/23
Web-Server Functions/ Diagnosis RTU560
© ABB India; Power Systems
RTU560 Training. - 11 -
02/12/23
Web-Server Functions/ Diagnosis RTU560
© ABB India; Power Systems
RTU560 Training. - 12 -
02/12/23
Web-Server Functions/ Diagnosis RTU560
© ABB India; Power Systems
RTU560 Training. - 13 -
02/12/23
Engineering example.
© ABB India; Power Systems
RTU560 Training. - 14 -
02/12/23
RTU Configuration.
Initialize Signal Tree

 The Signal tree is defined.The


name and length of the levels
are given.
 Four levels are defined
Station : 10 Characters length
Subnet : 6 Characters length
Bay : 4 Characters length
Scada Object : 12 Characters
length(last level has no name)
© ABB India; Power Systems
RTU560 Training. - 15 -
02/12/23
© ABB India; Power Systems
RTU560 Training. - 16 -
02/12/23
Build the Network tree.
Build the Signal Tree.

 When the outgoing feeders


are exactly the same, they can
be copied as shown.
 The name of the station
appears as “COPY” and has to
be replaced and the signal
tree is built.
© ABB India; Power Systems
RTU560 Training. - 17 -
02/12/23
Build the Hardware Tree.
 The nodes, RTU lines and other
data points defined in the other
trees are linked in the hardware
tree.
The following parameters for RTU &
Comm. Boards(SLI&ETH) are
to be set:
 Time Synchronization mode
 Initial redundancy mode
 Administration mode
 Node name
 IP address
 Subnet mask
© ABB India; Power Systems

 Default gateway
RTU560 Training. - 18 -
02/12/23
Build the Hardware Tree.
Node name
IP address
Subnet mask
Default gateway

I/O Part
The I/O racks and I/O Boards are added.
They can be added only if the I/O Bus is defined.
© ABB India; Power Systems
RTU560 Training. - 19 -
02/12/23
SEV Address and Link Data Points.

 Before linking the data


points the start address
of the RTU system event
block is to be set.
 SEV link and ASDU
address are used as
default address of the
data points.
© ABB India; Power Systems
RTU560 Training. - 20 -
02/12/23
The data points can now be linked.
© ABB India; Power Systems
RTU560 Training. - 21 -

Now the RTU’s have been engineered with the RTUtil 560
02/12/23
Configuration Files
Before Configuration files are built the project is saved. Three
download files are built.
 .gcd
 .iod
 .oad
© ABB India; Power Systems
RTU560 Training. - 22 -
02/12/23
RTU560 Web page
Frame Structure
1. Main menu Frame
2. Presentation Frame
3. Selection Frame
© ABB India; Power Systems
RTU560 Training. - 23 -
02/12/23
System Diagnosis

This Page gives


information about the
actual state of the
RTU560.
The Diagnosis
Information is
displayed in two
different views.
 General view
Detailed view
© ABB India; Power Systems
RTU560 Training. - 24 -
02/12/23
Hardware Tree

The hardware tree provides information about the configuration and


© ABB India; Power Systems

actual values of the process objects according to the configuration in


RTU560 Training. - 25 -

RTUtil560.
02/12/23

You might also like