BMRCL is receiving Power Supply from KPTCL at Four (7) Receiving Sub Stations (RSS)

Nagasandra KPTCL
KPTCL KPTCL SRS GSS
Hejjala REMCO North BMRCL
1 GSS GSS
KPTCL
Peenya
RSS
KPTCL Vrushabhavathi KPTCL
Kumbulagodu GSS Welcast
GSS 2 x 25 MVA GSS

BMRCL Present CD 5000 kVA


Challaghatta BMRCL Mysore
RSS Road RSS

Baiyappanahalli

White Field
2 x 25 MVA 2 x 25 MVA

Mysore Road

Kadugodi
Challaghatta

Present CD 6000 kVA Present CD 4000 kVA East

West Present CD 10000 kVA Present CD 6000 kVA


Present CD 5000 kVA 2 x 25 MVA
KPTCL BMRCL 2 x 31.5 MVA
2 x 25 MVA BMRCL
Khodays Kadugodi
Baiyappanahalli
GSS RSS
BMRCL RSS
KPTCL Puttenahalli
Subramanyap RSS
ura GSS Yelachenahalli KPTCL KPTCL
Hoody Hoody
GSS GSS
KPTCL KPTCL
KPTCL Present CD 6000 kVA EPIP GSS
HAL GSS
Khodays 2 x 25 MVA Anjanapura Township
GSS
BMRCL
Anjanapura
KPTCL RSS
Somanahalli
GSS South
2
 Penalty imposed by BESCOM due to increase in Maximum Demand during KPTCL grid Sub Station failure.

2017-18 2018-19 2019-20 Total


No. of Failures
RSS No. of Failures Penalty No. of Failures Penalty No. of Failures Penalty
where demand
Penalty
where demand Amount paid where demand Amount paid where demand Amount paid Amount paid
exceeded CD
exceeded CD in Lakhs exceeded CD in Lakhs exceeded CD in Lakhs in Lakhs

Baiyappana
halli - - 1 7.55 - - 1 7.55
Mysore
Road 2 20.29 1 5.56 - - 3 25.85
Peenya 1 9.03 6 53.00 1 8.86 8 70.89
Puttenahalli - - 4 40.08 1 9.29 5 49.37
Total Penalty paid 17 153.66
3  Maximum Demand expected to rise in worst scenario i.e., outage of one or two RSS at a time with planned
headway of 2.5 min with 6 cars.

Present Scenario 2021 Scenario (As per Simulation results)


MD expected in MD expected in MD expected in
Receiving Sub MD in Normal mode
Emergency mode of Normal mode of Emergency mode of
Station (RSS) of Operation (kVA)
Operation (kVA) Operation (kVA) Operation (kVA)
Baiyappanahalli 8,000 13,000 23,950 50,550
Mysore Road 4,000 12,000 19,850 47,120
Peenya 5,000 13,000 25,170 52,690
Puttenahalli 5,000 10,000 25,800 52,690

 Therefore, HPC requested to direct BESCOM for:


• Concurring BMRCL for drawl of Power up to 50 MVA at 66 kV level at each station during emergencies, i.e.,
complete outage of One/Two RSS.
• Exemption from levying penalty to BMRCL for the additional Maximum Demand drawl during such exigencies.