Exemption from penalty on increase in Maximum Demand

 BMRCL is receiving Power Supply from KPTCL grid Sub Stations at Four (4) Receiving Sub Stations (RSS)
1
KPTCL
Present CD 4000 kVA
Nagasandra SRS
BMRCL GSS
KPTCL KPTCL North
REMCO Vrushabhavathi Peenya RSS
KPTCL
GSS GSS 2 x 25 MVA Welcast

Baiyappanahalli
2 x 25 MVA GSS
Present CD 5000 kVA
BMRCL Mysore Road
RSS
Mysore Road

East

West
BMRCL
Baiyappanahalli RSS
Present CD 5000 kVA 2 x 25 MVA
KPTCL
Khodays 2 x 25 MVA KPTCL
KPTCL
GSS BMRCL HAL
Hoody GSS
Puttenahalli South GSS
KPTCL RSS
Present CD 10000 kVA
Subramanya
pura GSS Yelachenahalli
 As per condition of supply of Electricity of Distribution Licensees notified in GOK Gazette dated
17.06.2006, 20,000 kVA is the limit for power drawl at 66 kV level.
2
 Penalty imposed by BESCOM due to increase in Maximum Demand during KPTCL grid Sub Station failure.

2017-18 2018-19 2019-20 Total


No. of Failures
RSS No. of Failures Penalty No. of Failures Penalty No. of Failures Penalty
where demand
Penalty
where demand Amount paid where demand Amount paid where demand Amount paid Amount paid
exceeded CD
exceeded CD in Lakhs exceeded CD in Lakhs exceeded CD in Lakhs in Lakhs

Baiyappana
halli - - 1 7.55 - - 1 7.55
Mysore
Road 2 20.29 1 5.56 - - 3 25.85
Peenya 1 9.03 6 53.00 1 8.86 8 70.89
Puttenahalli - - 4 40.08 1 9.29 5 49.37
Total Penalty paid 17 153.66
3  Maximum Demand expected to rise in worst scenario i.e., outage of one or two RSS at a time with planned
headway of 2.5 min with 6 cars.

Present Scenario 2021 Scenario (As per Simulation results)


MD expected in MD expected in MD expected in
Receiving Sub MD in Normal mode
Emergency mode of Normal mode of Emergency mode of
Station (RSS) of Operation (kVA)
Operation (kVA) Operation (kVA) Operation (kVA)
Baiyappanahalli 8,000 13,000 23,950 50,550
Mysore Road 4,000 12,000 19,850 47,120
Peenya 5,000 13,000 25,170 52,690
Puttenahalli 5,000 10,000 25,800 52,690

 Therefore, HPC requested to direct BESCOM for:


• Concurring BMRCL for drawl of Power up to 50 MVA at 66 kV level at each station during emergencies, i.e.,
complete outage of One/Two RSS.
• Exemption from levying penalty to BMRCL for the additional Maximum Demand drawl during such exigencies.