A.33 KV Line
A.33 KV Line
Achievement Weekly
Scope as per Cumulative Cumulative
Scope as per LOA (23.11.18 to
Sr. Survey Achievement Achieveme
District Name of PSS Name of Feeder 30.11.18) Remarks
No. nt (In % of
Pole Length Pole Length Pole Length Pole Length
length)
( Nos.) (CKM) (Nos.) (CKM) (Nos.) (CKM) (Nos.) (CKM)
Katiahr 1 Manihari PSS Katakus GSS to Manihari Pss 194 9.535 194 9.535 Charged
Katiahr 2 Azamnagar PSS Salmari GSS to Azamnagar PSS 234 11.383 234 11.383 Charged
Katiahr 3 Balrampur PSS Dalkhola GSS to Balrampur PSS 284 10.559 284 10.559 Charged
Katiahr 4 Amdabad PSS Katakus GSS to Amdabad PSS 308 16 308 11.921 WIP
Katiahr 5 Mansahi PSS Katakus GSS to Mansahi PSS 0 0
Katiahr 6 Hasanganj PSS Dantkhora PSS to Hasanganj PSS 40 2 40 WIP
Katiahr 7 Sameli PSS Kurshela PSS to Sameli PSS 145 12 115 WIP
SUB TOTAL
TOTAL