You are on page 1of 12

PROPOSED ONE UNIT SINGLE STOREY

AQUACULTURE RESEARCH CENTRE ON LOT 12732, BLOCK 5, KUALA


BARAM LAND DISTRICT, MIRI FOR CURTIN UNIVERSITY, SARAWAK,
MALAYSIA PART OF LOT 2160)

SAFETY INDUCTION
CLIENT

CURTIN (MALAYSIA) SDN. BHD. TECHNICORPS


Logo
BUILDER SDN. BHD.
INTRODUCTION
TECHNICORPS
BUILDER SDN. BHD.
ECHNICORPS
LDER SDN. BHD.
PROJECT LOCATION

PROJECT SITE
TECHNICORPS
BUILDERSITE
SDN.LAYOUT
BHD.
TECHNICORPS
BUILDER SDN. BHD.
HSE POLICY
TECHNICORPS
BUILDER SDN. BHD.
OSH ACT 514
Duties of Employer (Section 24 ) Kewajipan Majikan (Seksyen 24 )
1. Maintain machinery equipment and substance 1. Simpan peralatan dan bahan jentera yang cukup
that are safe enough to be used onsite so as it selamat untuk digunakan di tapak supaya tidak
wouldn’t cause ACCIDENT menyebabkan KEMALANGAN
2. Provide and maintain Personal Protective 2. Menyediakan dan menyelenggara Peralatan
Equipment (PPE), Safe Access and Emergency Pelindung Diri (PPE), Akses Selamat dan
Equipment ( To response in any emergencies) Peralatan Kecemasan ( Untuk bertindak balas
3. Provide and ensure welfare facilities i.e. – dalam sebarang kecemasan)
temporary accommodation, first aid box, rest 3. Menyediakan dan memastikan kemudahan
area kebajikan iaitu – tempat tinggal sementara, peti
4. Provision of information examples (signage, pertolongan cemas, tempat rehat
notice, warning signages, memo) 4. Penyediaan contoh maklumat (papan tanda,
5. Provide instruction, e.g. Safe Work Instruction notis, papan tanda amaran, memo)
6. Provide training, e.g. Induction and Tool Box 5. Menyediakan arahan, cth. Arahan Kerja Selamat
Talk 6. Menyediakan latihan, cth. Induksi dan Ceramah
7. Provide supervision personnel, e.g. Safety and Kotak Alat
Health Officer, Site Supervisor, Site Safety 7. Menyediakan kakitangan penyeliaan, cth.
Supervisor Pegawai Keselamatan dan Kesihatan, Penyelia
Tapak, Penyelia Keselamatan Tapak
TECHNICORPS
BUILDER SDN. BHD.
OSH ACT 514
Duties of Employee (Section 24) Kewajipan Pekerja (Seksyen 24)
1) Untuk mematuhi semua Arahan dan Prosedur Majikan
1. To comply with all Employer Instruction
and Procedure 2) Tidak menganggu dan menyalahgunakan mana-mana
2. Not to abuse and misused any material bahan atau peralatan yang boleh menjejaskan
or equipment which may jeopardize the keselamatan dan kesihatan sendiri.
safety and health of own 3) Menggunakan dan memakai PPE yang sesuai yang
3. To use and wear appropriate PPE disediakan
provided 4) Untuk bekerjasama dengan semua arahan yang
4. To cooperate with all the instruction diberikan oleh majikan atau mana-mana pihak berkuasa
given by employer or any authorities yang berkaitan dengan Keselamatan dan Kesihatan
relating to Safety and Health 5) Menjaga keselamatan dan kesihatan diri dan orang lain
5. To take care of own safety and health semasa menjalankan tugas
and other while on duties
TECHNICORPS
BUILDER SDN. BHD.

Project Entry Requirement


 Safety Helmet Safety Helmet with
 Safety Shoes Chin Strap

SAMPLE OF MANDAOTRY
PPE IN USE
Gum Boot with Steel
Toe &
Steel Plate
TECHNICORPS
BUILDER SDN. BHD.

EMERGENCY REPORTING

Agencies Contact Agencies


number
Miri General 085-460600 Miri General
Hospital Hospital
Covid-19 082-443248 Covid-19
Hotline Hotline
(Sarawak (Sarawak
Edition) Edition)
TECHNICORPS
BUILDER SDN. BHD. EMERGENCY RESPOND

Do Not Panic
Do Not Run
Follow the instruction of SSS/Sup./Eng. available
and muster at assembly point.
Jangan panik
Jangan lari
Ikut arahan SSS/Sup./Eng. tersedia dan
berkumpul di tempat perhimpunan.
TECHNICORPS
BUILDER SDN. BHD. POTENTIAL HAZARD AND HOW TO PREVENT
WORK ACTIVITY HAZARDS CONTROL MEASURE

EXCAVATION 1. STRIKE BY MACHINE 1. SIGNAGE SHALL BE PUT


penggalian 2. PEOPLE CAVE IN 2. BARRICADE THE ACTIVITY AREA
3. STOP WORKING IF THERE ANY SUSPICIOUS
HAZARD

CONCRETING 1. STRIKE BY THE MOVING CEMENT BUCKET 1. APPOINT COMPETENT SIGNALMAN


2. CONTACT WITH WET CEMENT (CHEMICAL) 2. SIGNAGE SHALL BE PUT
3. WEATHER(RAIN OR HEAT STRESS) 3. BE ALERT AND AWARE.

PILE CUTTING BY HACKING OR USING POWER 1. STRIKE BY FLYING OBJECT WHILE HACKING 1. GOOD SHORING
TOOLS MANUALLY 2. SIGNAGE SHALL BE PUT
2. THE CUT PILE FALL OVER TO HUMAN 3. BARRICARDE THE ACTIVITY AREA
3. KNOCK BY ANOTHER HACKER 4. STOP WORKING IF THERE ANY SUSPICIOUS
4. LAND SLIDE HAZARD FOUND AND INFORM SUPERVISOR
5. USE RIGHT PPE
6. CHECK POWER TOOL BEFORE START WORK

LIFTING 1. OBJECT FALL OVER HUMAN 1. SIGNAGE SHALL BE PUT


2. STRIKE BY MOVING MACHINE 2. SUPERVISION BY THE GANG LEADER
3. BREAK LOOSE 3. APPOINT A COMPETENT SIGNALMAN
4. CABLE DISCONNECTED
4. BARRICADE THE ACTIVITY AREA
5. CHECK THE MACHINE PRIOR TO START
WORK
WORKING AT HEIGHT 1. FALL FROM HEIGHT 1. USE BODY HARNESS
TECHNICORPS
BUILDER SDN. BHD.

TERIMA KASIH,
INGAT ADA YANG MENUNGGU ANDA DI
RUMAH!
TAMAT
Bekerja Dengan Selamat, Pulang Dengan Bahagia

You might also like