You are on page 1of 18

Murphy PowerCore

MPC-20 Controller

*CSA Certification: Non-Hazardous Environments Only


MPC-20 Controller

• Industrial Controller
– Pumps
• Dewatering
• Irrigation
– Center Pivot/Linear Movement
– Flood
– Sprinkler
– Hose Reel
• Slurry
• Diversion
– Compressor
– Frost Protection
2
MPC-20 Controller

• Fully Sealed (IP67)


Glue Seal

Leak Test Fixture

Leak Testing
Vent Patch
Installation

3
MPC-20

• Tactile Feedback Buttons


– Allows for a better user to
machine experience

4
MPC-20

• 90 Pin Delphi High Density Connector


– Allows for high I/O count at a reasonable cost

5
MPC-20

• Easy to Read Screens in Full Sunlight

6
Testing IP6X DUST TEST

• Environmental
– Humidity HALT TEST

– Thermal
– Shock
– Vibration
– IPXX HALT UNIT
– Salt Spray
– Fluid Compatibility
– 500Hr UV Test
– HALT
• Keypad
– Button Press Test

7
Testing

• Electrical
– Emissions
– Immunity
– Inductive Switching
– Load Dump
– Reverse Voltage
– ESD

8
Software Configurability

• Front User Interface

• Configuration Tool

• PowerVision Studio
9
MPC-20 Software Configurability

• Front User Interface


– Flexible Easy to Use Menu

10
MPC-20 Software Configurability

• Flexible Easy to Use Menu

11
MPC-20 Software Configurability

• Easy to Use Configuration Tool

Free Download:
http://forum.fwmurphy.com/

12
MPC-20 Software Configurability

• PowerVision based and supported for


engineering development under version 2.7

13
MPC-20 & ML2000

• Stand-alone Controller or Panel

14
ML2000

• 3 Panels to choose featuring MPC-20


– ML2000-FP (Flat Panel without Enclosure)
– ML2000 (Powdercoated Steel Enclosure)
– ML2000-4X (NEMA 4X Enclosure)
• Harnessing
– 10’ Mechanical 21Pin whip harness
– 10’ IO whip harness
– MIH harnessing for electronic engines

Refer to Sales Bulletins for part numbers.


15
Accessories

• PowerCore 90way Delphi Connector Kit


• PowerCore 90way 3’ whip harness
• MPC-20 IP66 Panel Gasket
• 21pin and 31pin Panel Connector Kit
• 6pin USB Panel Programming Harness

Refer to Sales Bulletins for part numbers.


16
Field Trials

• Ran field trials for ~5 months worldwide


• Accumulated Over 1200 hours of run time
in the field
• Gathered valuable feedback for software
improvements prior to launch from real
customers running in real applications

17
Questions

18

You might also like