You are on page 1of 13

Introduction

Drive Test
RF drive testing is a test that allows a mobile operator to monitor, troubleshoot, tune, and optimize the
radio network to improve mobile network coverage, capacity and Quality of Service (QoS). During drive
tests, RF engineers take field measurements while driving on vehicles equipped with specialized RF tools
within the cell coverage area.

The vehicle does not really matter, a drive test can be performed using a motorcycle or bicycle on the
road. You can also perform drive test for any specific spot or inside the high-rise building or shopping
complex by walking when it is called “Walk Test”. Moreover, when you do drive test in rivers or canals by
boat then we say it’s “Boat Test”.
Drive Test Tools and Software
 At least one laptop
 TEMS Investigation software
 TEMS Discovery software
 Soft/hard license
 Mobile Equipment’s
 At least one car GPS
 Accessories(Converter, Hub etc.)
Purpose of DT
To investigate and analyze the network coverage, capacity, Quality of Service (QoS) and Quality of
Experience to customers(QoE) on real time

Briefly it discussed
 Network Problem Identification
 Key Performance Indicator(KPI) Monitoring

Network Problem Identification Key Performance Indicator (KPI)


Generalized Basic Radio Parameter Specific Radio Parameter Call Drop Rate (CDR)
GSM WCDMA LTE NR Call Drp Call Setup Success Rate (CSSR)
RxLev RSCP RSRP NR RSRP HO Failure Handover Success Rate (HOSR)
RxQual Ec/Io SINR NR SINR Poor Data Throughput
C/I R99/HSDPA Throughput RSRQ NR RSRQ Neighbor missing
SQI MOS POLQA MOS PDCP Throughput NR PDSCH Throughput Frequency Interference
Call Setup Time (CST)
Timing Advance (TA)
Overshooting
Pilot Pollution
Site GPS Cross check
Route Drive Work
SL. No Description Covearge Area Driven KM Remarks
1 Modhy Badda-Rampura-Mohanagar Project-Modhubag-Chowdhuripara-Mogbazar-Tejturibazar Rampura-Mogbazar 80
2 Hatirjheel-Modhubag-Tejturibazar-Iskaton-Malibag-Mouchak-Chowdhuripara Modhubag-Malibag 65
3 Kochukhet-Ibrahimpur-Kafrul-Pirerbag-Kazipara-Monipur-Mirpur-10 Mirpur 50
4 Hatirjheel-Modhubag-Tejturibazar-Iskaton-Malibag-Mouchak-Chowdhuripara Modhubag-Malibag 65
5 Kochukhet-Ibrahimpur-Kafrul-Pirerbag-Kazipara-Monipur-Mirpur-10 Mirpur 50
Gulshan 1,2-Banani-Kakoli-Airport Road-ECB Chattar-Mirpur DOHS-Mirpur12,11,10,13,14-
Gulshan-Mirpur-
6 Shewrapara-Kazipara-Agargaon-taltola-Shyamoli-Technical-Gabtoli-Mazar Road-Mirpur1,2- 80
Mohammadpur
Technical-Kollyanpur-Shaymoli-Asadgate-Kamarbari-Mohakhali-Gulshan-1
Gulshan 1-Badda Link Road-DIT Avenue-Abul Hotel-Malibag-Shantinagar-Motoijheel-Gulisthan- Gulshan-Malibag-
7 60
Kakrail Mour-Mogbazar-Hatirjheel-Gulshan 1 Gulisthan
Gulshan-Rampura-
8 Gulshan-Tejgaon-Mogbazar-DU-BUET-Ramna-Gulisthan-Jatrabari-Shonir Akhra 110
Jatrabari
9 Aftabnagar Aftabnagar 20
10 Aftabnagar Aftabnagar 30
11 Police Plaza-Badda Link Road-Hatirjheel Hatirjheel 30
Total 640
Cluster Drive Optimization Plan (Banani)
SL No Site Id

1 DHK0083

2 DHK0700

3 DHK0013

4 DHK0401

5 DHK0137

6 DHK0702

7 DHK0361

8 DHK0015

9 DHK0758

10 DHK0078

11 DHK6403

12 DHK0894

13 DHK0011

14 DHK0874

15 DHK0186

16 DHK0065
Cluster Drive Optimization Plan (Baridhara)
SL No Site Id

1 DHK0784

2 DHK5052

3 DHK0459

4 DHK0021

5 DHK0457

6 DHK0323

7 DHK0430

8 DHK0648

9 DHK0452

10 DHK4225

11 DHK0449

12 DHK0447

13 DHK0019

14 DHK1194

15 DHK0456

16 DHK0242
Customer Complain Drive

SL. No Description Covearge Area Driven KM Remarks


1 Hatirjheel Hatirjheel 5  
2 Nobabpur Nobabpur 10  
3 Baily Road Baily Road 8  
4 Police Plaza-Badda Link Road-Hatirjheel Badda Link Road 5  
5 Gulisthan Gulisthan 12  
6 Bangla Motor Bangla Motor 6  
7 Rampura Wapda Road Rampura Wapda Road 5  
Total
51  
Testing TA Restriction
Testing Call Setup Time On-Net(MOGBSCH05 & 06)

BTRC: Target
MO MT CST<=7 Sec Recommendation

Teletalk Teletalk 5.78 Sec Normal

After Call attempt MS goes to LAU


Teletalk Teletalk 9..41 Sec and RAU, it takes time to call setup.
Need to check core network
Testing Call Setup Time Off-Net(MOGBSCH05 & 06)

MO MT BTRC: Target Recommendation


CST<=7 Sec
Teletalk Grameenphone 6.92 Sec Normal

After Call attempt MS goes to LAU


Teletalk Grameenphone 9.45 Sec and PS Mode, it takes time to call
setup. Need to check core network
Testing Call Setup Time On-Net(SBNBSCH01)

BTRC: Target
MO MT Recommendation
CST<=7 Sec
Teletalk Teletalk 4.461 Sec Normal

After Call attempt MS goes to LAU


Teletalk Teletalk 25.7 Sec and PS Mode, it takes time to call
setup. Need to check core network
Testing Call Setup Time Off-Net(SBNBSCH01)

BTRC: Target
MO MT CST<=7 Sec Recommendation

Teletalk Grameenphone 6.32 Sec Normal

After Call attempt MS goes to LAU


and PDP context activate, it takes
Teletalk Grameenphone 24.08 Sec
time to call setup. Need to check
core network
Conclusion

You might also like