BOILER GROUND FLOOR

& ESP INSTRUMENT AIR


& STATION AIR DETAILS
Station Air
To fuel Near SST 5A Station Air
area Instrument air

CM#5D inert steam and


CM#5H inert steam and
Pyrite hopper
Pyrite hopper
TO OTF
To IMD panel 1st floor

CM#5G inert steam and


CM#5C inert steam and
Pyrite hopper
Pyrite hopper

CM#5F inert steam and CM#5B inert steam and


Pyrite hopper Pyrite hopper

To IMD panel 1st floor To Clinker Grinder gate valve

CM#5E inert steam and CM#5A inert steam and


Pyrite hopper Pyrite hopper
To DM plant
To Boiler

To PSF Backwashing
Both Line blind near
LCO htr
To Ash Plant
To GGH air motor
STREAM 4 STREAM 3 STREAM 2 1 STREAM 1
2

4
1 – Instrument air from Feedcycle to ESP MHV
2 – Instrument air common header for distribution of air for each stream MHV.
3 - 1” line tapping taken between stream 3 and stream 4 for Segregator valves

- SV – SAGRATING VALVE ( TOTAL NO. – 16 )

Total 80 no of MHV and individual each MHV is having individual isolating valve.

Total isolation point is 81