Professional Documents
Culture Documents
A
PMR Report on
Note:
Container DM Water Plant (15 m3/hour).
Borewell pumps 02 Nos. (23 m3/hour).
Boiler fill pumps with Stainless Steel piping.
With all necessary Power Supply arrangements to run the systems.
WATER TREATMENT PLANT LAYOUT:
STAGE-1:
RESERVIOR FOR CLARIFIED
CLARIFIER PRE-TREATMENT
RAW WATER STORAGE TANK
PLANT
UF STAGE-2:
CARTRIDGE
RO STORAGE UF DMF REVERSE OSMOSIS
FILTER
TANK TREATMENT PLANT
DM STAGE-3:
Mixed
SAC DEGASSER SBA STORAGE IONIZING
Bed
TANK TREATMENT PLANT
THANK YOU