You are on page 1of 10

WATER DEMAND CALCULATIONS

PROJECT: GOVERNMENT MEDICAL COLLEGE AT VIZIANAGARAM IN VIZIANAGARAM DISTRICT,


ANDHRA PRADESH

SUBJECT: WATER TANK CAPACITIES & SPACE REQUIREMENTS

ZONE 2 - MEDICAL COLLEGE AND STUDENT HOSTELS


ZONE 3 - RESIDENTIAL BUILDINGS

Zone 2 Zone 3
I. TOTAL WATER REQUIREMENT Unit
PHASE -1 PHASE -2 PHASE -1 PHASE -2
1 Domestic Water Demand
Potable water demand 67 29 36 11 m3/day
Flushing water demand 37 15 17 6 m3/day
2 Horticultural Water demand 15 15 15 15 m3/day
3 Total Water Demand for all purposes 119 59 68 32 m3/day

II. UNDERGROUND TANK CAPACITIES & AREA REQUIRED Zone 2 Zone 3 Unit
UG Fire Static Tank Capacity as per NBC part 4 2016 For Medical Separate Sump For Medical
1 100.00 NA m3
College & Leture Gallery College

2 UG Raw Water Tank Capacity 0.00 50.00

Hostels & Kitchen & Dinning


3 UG Domestic Tank Capacity 50 kld 100 kld m3
& Quarters
(As per NBC - combined capacity of pt 2 and 3 above to be 1.0 days)

4 UG Soft Tank Capacity m3


5 Total UG Tanks Required 150 150 m3
(50 Cum Domestic (100Cum
To consider + 100 Cum Fire Domestic+50 Raw
static) water)
TOTAL 150 Cum 100 Cum
6 Max. Depth of Water Considered Meters
7 Area Required for UG Tanks (Incl. for Structure/walls) m2
8 Approx. Area Required for UG Tanks (Say) m2

SSIPCPL VIZAYANAGARAM 1 of 10
WATER DEMAND CALCULATIONS

9 Approx. Area for Plant Room (Adjacent to UG Tanks) m2


10 Total area required for water tanks and plant rooms Meters

Zone 2 Zone 3
III. S.T.P. ( Capacity & sizes) Unit
PHASE -1 PHASE -2 PHASE -1 PHASE -2
1 Total Domestic Water Requirements 104 44 53 17 m3/day
2 Total Sewage Generation @ 80% of Water Requirements 83.53 35.2 42.5436 13.7808 m3/day
3 S.T.P. Capacity required We 100 40
have proposed 80 40 m3/day
common STP for
Hospitals ,
Ancilaries ,Medical We have proposed
College , Nursing separate stp For
4 STP capacity proposed
College and Nursing Hostels , Quarters 100
Hostels With the KLD
capacity of 500 kld
and Separate ETP 75
5 Area required (Approx.) kld for Hospital 250 m2

SSIPCPL VIZAYANAGARAM 2 of 10
WATER DEMAND CALCULATIONS

PROJECT: GOVERNMENT MEDICAL COLLEGE AT VIZIANAGARAM IN VIZIANAGARAM DISTRICT,


ANDHRA PRADESH

SUBJECT: WATER DEMAND CALCULATIONS

Domestic Flushing
potable Water
Total water
Water consumpti Domestic FIRE
Flushing demand
No. of Consumpti on per Potable STATIC
water (Domestic
Users on Person water SUMP AS
S. Building demand and
Unit Name per Unit per Person per day as demand PER NBC
No. legend per day flushing
per day as per NBC per day -2016
purposes)
per NBC part 9
part 9 2016 2016
(As per
(LPCD) (LPCD) LPD LPD LPD
Arch)

I. DOMESTIC WATER DEMAND


A ZONE-2 (PHASE - 1)
1 UG Girls Hostel ist year&2 nd Year R01 186 90.00 45.0 16740.00 8370.00 0.00 25110.00

2 UG Boys Hostel ist year& 2 nd Year R03 126 90.00 45.00 11340.00 5670.00 0.00 17010.00

C01
Students 750 25 20 18750 15000 0.00 33750.00
3 Medical college
Teaching and
Non teaching 250 25 20 6250.00 5000.00 11250.00
staff
4 Kitchen cum Dinning / Gymnasium A-01 312 25 7800 0.00 7800.00
5 (Common For UG Girls & Boys

SSIPCPL VIZAYANAGARAM 3 of 10
WATER DEMAND CALCULATIONS

Domestic Flushing
potable Water
Total water
Water consumpti Domestic FIRE
Flushing demand
No. of Consumpti on per Potable STATIC
water (Domestic
Users on Person water SUMP AS
S. Building demand and
Unit Name per Unit per Person per day as demand PER NBC
No. legend per day flushing
per day as per NBC per day -2016
purposes)
per NBC part 9
part 9 2016 2016
(As per
(LPCD) (LPCD) LPD LPD LPD
Arch)

Sub-Total 60880.00 34040.00


Add 10% for Misc. & Continengenices 6,088 3,404
Sub - Total for Zone 1 (Present) 66,968 37,444
Grand Total of Domestic Water Demand for Zone 1 PHASE - 1 (Say in Cum per Day) 66.97 37 0 87,120

B ZONE-2 (PHASE -2 )
Student Hostels (Third to Fifth Year ‐ Single
1 R 02 182 90 45 16380 8190 0.00 24,570
Occupancy) ‐ Female - PHASE 2
Student Hostels (Third to Fifth Year ‐ Single) ‐
2 R 04 105 90 45 9450 4725 0.00 14,175
Male - PHASE 2
Sub-Total 25830 12915
Add 10% for Misc. & Continengenices 2,583 1,292
Sub - Total for Zone 1 (Future) 28,413 14,207
Grand Total of Domestic Water Demand for zone 1 PHASE - 2 (Say in Cum per Day) 29 15.00 43.00 38,745.0

SSIPCPL VIZAYANAGARAM 4 of 10
WATER DEMAND CALCULATIONS

Domestic Flushing
potable Water
Total water
Water consumpti Domestic FIRE
Flushing demand
No. of Consumpti on per Potable STATIC
water (Domestic
Users on Person water SUMP AS
S. Building demand and
Unit Name per Unit per Person per day as demand PER NBC
No. legend per day flushing
per day as per NBC per day -2016
purposes)
per NBC part 9
part 9 2016 2016
(As per
(LPCD) (LPCD) LPD LPD LPD
Arch)

C ZONE-3 (PHASE - 1)
1 Residents Accomodation ‐ Female R 05 64 90 45 5760 2880 0.00 8640.00

2 Residents Accomodation ‐ male R 07 33 90 45 2970 1485 0.00 4455.00

3 Staff Accomodation ‐ Teaching Staff R 10 100 105 45 10500 4500 0.00 15000.00

4 Staff Accomodation ‐ Non Teaching Staff R 11 150 90 45 13500 6750 0.00 20250.00

5 Nurses Female Quarters R 12 0 90 45 0 0 0.00 0.00

6 Nurses Hostel Female ( 2 Blocks ) R 09 0 90 45 0 0 0.00 0.00


C03
Students 0 25 20 0 0 0.00 0.00
7 Nursing college
Teaching and
Non teaching 0 25 20 0 0 0.00
staff

Sub-Total 32730 15615


Add 10% for Misc. & Continengenices 3,273 1,562
Sub - Total 36,003 17,177
Grand Total of Domestic Water Demand (Say in Cum per Day) 36.00 17.18 0.00

SSIPCPL VIZAYANAGARAM 5 of 10
WATER DEMAND CALCULATIONS

Domestic Flushing
potable Water
Total water
Water consumpti Domestic FIRE
Flushing demand
No. of Consumpti on per Potable STATIC
water (Domestic
Users on Person water SUMP AS
S. Building demand and
Unit Name per Unit per Person per day as demand PER NBC
No. legend per day flushing
per day as per NBC per day -2016
purposes)
per NBC part 9
part 9 2016 2016
(As per
(LPCD) (LPCD) LPD LPD LPD
Arch)

D ZONE-3 (PHASE - 2)
1 Interns Accomodation ‐ Female - PHASE 2 R 06 68 90 45 6120 3060 9180
2 Interns Accomodation ‐ Male - PHASE 2 R 08 48 90 45 4320 2160 6480
Sub-Total 10440 5220
Add 10% for Misc. & Continengenices 1,044 522
Sub - Total 11,484 5,742
Grand Total of Domestic Water Demand (Say in Cum per Day) 11.48 5.74 0.00

II. HORTICULTURAL WATER DEMAND

1 60,000

Grand Total of Horticultural Water Demand (in Cu.m. per Day) 60

TOTAL WATER REQUIREMENTS FOR ALL PURPOSES 103


SAY (IN MLD) 0.10

SSIPCPL VIZAYANAGARAM 6 of 10
WATER DEMAND CALCULATIONS

PROJECT: GOVERNMENT MEDICAL COLLEGE AT VIZIANAGARAM IN VIZIANAGARAM DISTRICT, ANDHRA PRADESH

SUBJECT: OVER HEAD TANK CALCULATIONS

Proposed
Proposed
Capacity of
Capacity of
Total water Proposed Over head
Over head Space
demand Capacity of Over Domestic Total
Flushing tank requirement at
S. (Domestic head Fire tank as Potable tank Capacity of
Unit Name Building legend and flushing per NBC part 4 (50% of terrace level for
No. (50% of OH Tanks
Requirements OHT.
purposes) 2016 Requirements
(For Gravity
(For Gravity
based System
based System

LPD LITERS LITERS LITERS LITERS (M2)

1 UG Girls Hostel ist year&2 nd Year R01 25110.00 25000.00 8370.00 4185.00 37555.00

2 UG Boys Hostel ist year& 2 nd Year R03 17010.00 25000.00 5670.00 2835.00 33505.00
C01
Students 45000.00
3 Medical college
Teaching and 20000.00 9375.00 10000.00 39375.00
Non teaching 0
staff
Student Hostels (Third to Fifth Year ‐ Single
4 R 02 24,570 25000.00 8190.00 4095.00 37285.00
Occupancy) ‐ Female - PHASE 2
Student Hostels (Third to Fifth Year ‐ Single) ‐
5 R 04 14,175 25000.00 4725.00 2362.50 32087.50
Male - PHASE 2

6 Residents Accomodation ‐ Female R05 8640.00 0.00 2880.00 1440.00 4320.00

7 Residents Accomodation ‐ male R07 4455.00 0.00 1485.00 742.50 2227.50

8 Staff Accomodation ‐ Teaching Staff R 10 15000.00 0.00 5250.00 2250.00 7500.00

9 Staff Accomodation ‐ Non Teaching Staff R 11 20250.00 0.00 6750.00 3375.00 10125.00

SSIPCPL VIZAYANAGARAM 7 of 10
WATER DEMAND CALCULATIONS

Proposed
Proposed
Capacity of
Capacity of
Total water Proposed Over head
Over head Space
demand Capacity of Over Domestic Total
Flushing tank requirement at
S. (Domestic head Fire tank as Potable tank Capacity of
Unit Name Building legend and flushing per NBC part 4 (50% of terrace level for
No. (50% of OH Tanks
Requirements OHT.
purposes) 2016 Requirements
(For Gravity
(For Gravity
based System
based System

LPD LITERS LITERS LITERS LITERS (M2)

10 Nurses Female Quarters R 12 0.00 0.00 0.00 0.00 0.00

11 Nurses Hostel Female ( 2 Blocks ) R 09 0.00 0.00 0.00 0.00 0.00

12 C03

13 Nursing college Students 0.00 0 0.00 0.00 0.00


Teaching and
14 Non teaching 0 0.00 0.00 0.00
staff
15 Interns Accomodation ‐ Female - PHASE 2 R 06 9180 3060.00 1530.00 4590.00
16 Interns Accomodation ‐ Male - PHASE 2 R 08 6480 2160.00 1080.00 3240.00
17 Kitchen cum Dinning / Gymnasium A-01 7800.00 0.00 3900.00 0.00 3900.00

SSIPCPL VIZAYANAGARAM 8 of 10
WATER DEMAND CALCULATIONS

PROJECT: GOVERNMENT MEDICAL COLLEGE AT VIZIANAGARAM


IN VIZIANAGARM DISTRICT, ANDHRA PRADESH

SUBJECT: WATER BALANCING EQUATION

A Total Water Demand Zone 2 Zone 3 Unit


1) DOMESTIC WATER DEMAND
(i) Total Potable Water Demand 96 47 m3/day
(ii) Total Flushing Water Demand 52 23 m3/day
Total Domestic Water Demand 148 70 m3/day
2) Total Horticulture Water Demand 30 30 m3/day
3) Total Soft Water Demand for medical purposes m3/day
Grand Total of Water Demands for all Purposes 178 100 m3/day

B Total Available Treated Effluent for Recycling Zone 2 Zone 3 (In m3/Day)
1) Total Sewerage Generated (Total Domestic Demand x 0.8) 118.7296 56.3244 m3/day
Total Treated Effluent Water Available from STP for Recycling
2) 107 51 m3/day
(90%)
Total of Available Water for Re-use 107 51 m3/day

C Total Utilized Treated Effluent Zone 2 Zone 3 (In m3/Day)


1) Total Amount Re-used for Flushing Water Purposes 52 23 m3/day
2) Total Amount Re-used for Horticulture Purposes 30 30 m3/day
Total Recycled /Utilized Treated Effluent 82 53 m3/day
Balance treated effluent for disposal outside the site 24 -2 m3/day

D Balance Water Requirements Zone 2 Zone 3 (In m3/Day)

1) Daily Fresh Water Required per Day for Potable Purpose 96 47 m3/day

Daily Fresh Water Required per Day for Soft water for
2) m3/day
medical purposes
Total Daily Net Fresh Water Demand 96 47 m3/day

SSIPCPL VIZAYANAGARAM 9 of 10
PROJECT: GOVERNMENT MEDICAL COLLEGE AT VIZIANAGARM IN VIZIANAGARAM DISTRICT, ANDHRA PRADESH

SUBJECT: ZONING OF BUILDINGS AS PER THE MASTER PLAN

S. No. DESCRIPTION Building name & legend REMARKS

UG Girls Hostel ist year&2 nd Year


UG Boys Hostel ist year& 2 nd Year

1 ZONE -2 Student Hostels (Third to Fifth Year ‐ Single Occupancy) ‐ Female -


PHASE 2
Student Hostels (Third to Fifth Year ‐ Single) ‐ Male - PHASE 2
Medical College
Kitchen cum Dinning / Gymnasium

Residents Accomodation ‐ Female

Residents Accomodation ‐ male


Staff Accomodation ‐ Teaching Staff
Staff Accomodation ‐ Non Teaching Staff
2 ZONE -3 Interns Accomodation ‐ Female - PHASE 2
Interns Accomodation ‐ Male - PHASE 2

SSIPCPL VIZAYANAGARAM

You might also like