Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

CORN AND RICE MILL PROJECTS

I.2 PROJECT COMPONENTS

Capacity
Facilities
No. of (ton/hour) Specification/Description
please enumerate; use separate sheet, if
Units or Area
necessary)
(sq./M)
1. Main Components

a. Drying (method) NONE

Mechanical 2 1 ton / hour SANCHO USING RICE HUSH 10 TON PER UNIT

Solar N/A N/A

b. Cleaning/Hulling 2 1 TON / HOUR

c. Shaking/Separating 1 1 TON / HOUR

d. Polishing `1 1 TON / HOUR

e. Grinding 1 1 TON / HOUR

f. All in one machine for NONE


cleaning/polishing/grinding

g. Weighing and Packaging 1 2 TON / HOUR BASCULA

h. Others, specify NONE

2. Storage Facility
a. Fuel Storage NONE

b. Product Storage 1 20SQM

Project Name: ____________________________________________________


Page 1 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

c. Palay/corn Storage 2 300 SQ / M

d. Others, specify NONE

3. Air pollution control Facility


a. Cyclone Dust Collector 2 1 SQ / M PER
UNIT

b. Rice Hulls Storage Bins 1 20 SQ / M

4. Power source/supply
a. Electric source ORMECO

b. Genset NONE

5. Water source / supply NONE

6. Waste water management Facility/ NONE


septic tank

7. Solid waste management Facility NONE

8. Drainage System NONE

9. Support Facilities
a. Workers quarters NONE

b. Admin building NONE

c. Motor pool facility 10 SQ / M

d. Others, specify

Project Name: ____________________________________________________


Page 2 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

I.3 UTILITIES/REQUIREMENTS (Operation Phase):


Power/Energy and Water Requirements
Utilities Estimated Demand/ Source Breakdown Projected breakdown
Consumption (Total) from Source specified
Grid KWh
Power/Electricity 120 ORMECO

KWh

Generator Set KWh


NONE

Others, please specify: KWh

Local Water Utility Provider m3/day


Water NONE

m3/day
Well in: (specify location): m3/day
NONE

Spring in: (specify location): m3/day


NONE

River, Lake or other surface m3/day


water : (specify name &
location)

Others, please specify: m3/day

Power/Energy and Water Efficiency Measures (if any)

Utilities Proposed Estimated Savings Estimated Total Savings


Efficiency/Conservation for each Measure
Measures
Power/ Electricity KWh KWh
Not Applicable

KWh

Project Name: ____________________________________________________


Page 3 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

Water Rainwater collection system m3/day m3/day


with total capacity of
N/A

Others, please specify: m3/day


N/A

I.4 MANPOWER & TIMETABLE OF CONSTRUCTION


N/A
Proposed Start of Construction
N/A
Proposed Start of Commissioning
N/A
Proposed Start of Commercial Operation

Phase Expertise/Skills Requirement per Expertise/Skill Total Requirement


per project phase
a. Construction N/A

b. Operation N/A

I.5 INDICATIVE PROJECT COST (Initial Investment):


10,000000
PhP __________ US $ ___________ _ (specify if with foreign investment)