Water Consumption
S/N Description Of Service water requirement Critical Demand @ Normal
Conditions m3/hr

1 Polymer preparation Unit For RDT Critical 5.7


2 Polymer Post dilution For RDT Critical 22.976
3 Polymer preparation Unit For Centrifuge Critical 7.906
4 Polymer Post dilution For Centrifuge Critical 31.624

5 Service water requirement for RDT Critical 8.8

6 Service water requirement for Odour Control Unit Critical 18.42

Digester Foam Suppression system requirement(Requirement for One


7 digester) Non-Critical 86.4
To be used in a Timely manner Intermittently on both digesters.

8 Wash down Point RDT Room/ Area (2 points) Non-Critical 2


9 Wash down Point Thickener & digester feed pumps area(2 points) Non-Critical 2
10 Digester Grit Collection Tank Wash down (2 Points) Non-Critical 2
11 Wash down Point Thermophilic digesters Roof (2 Point) Non-Critical 2
12 Wash down Point Condensate Traps (4 Points) Non-Critical 2
13 Wash down Point centrifuge feed pumps area (1 point) Non-Critical 2
14 Wash down point CHP Area (1 point) Non-Critical 2

Raw Total Service water demand From ASE 156.296

Critical Demand Flow From ASE 55.896

ASE Service Booster pump capacity 97.913

ASE Service Booster pump capacity with Future RDT 107.282

ASE Selected Service Booster pump capacity 114

Phase-2 As-Built Data


Existing GRP Tank 12-TST-001C Capacity (m3) 120
Existing Service Booster set Capacity (m3/hr) 60
Existing TE pump 06-FET-01A/01B Capacity (m3/hr) 70 Duty/Standby

Check of existing facilities


Total Water demand (phase2 + ASE) m3/hr 216.296
Total critical water demand (Phase-2 + ASE) m3/hr 115.896
Time to fill the storage tank (hr) 1.71428571428571
Time to empty the storage tank while ph-2 service is only running (hr) Never
Time to empty the storage tank while ph-2 & ASE service are running (hr) 0.82025482583256
Time to empty the storage tank while ph-2 & ASE critical are running (hr) 2.61460693742374

If we run TE transfer pumps as two duty


Total Water demand (phase2 + ASE) m3/hr 226.296
Total critical water demand (Phase-2 + ASE) m3/hr 115.896
Time to fill the storage tank (hr) 0.85714285714286
Time to empty the storage tank while ph-2 service is only running (hr) Never
Time to empty the storage tank while ph-2 & ASE service are running (hr) 7.36377025036819
Time to empty the storage tank while ph-2 & ASE critical are running (hr) Never

If we run TE transfer pumps as two duty and considering Average daily consumption
Avg ASE Water demand based on daily consumption(m3/hr) 51.68
Avg ASE Critical Water demand based on daily consumption(m3/hr) 43.8966666666667
Total Water demand (phase2 + ASE) m3/hr 111.68
Total Critical Water demand (phase2 + ASE) m3/hr 103.896666666667
Time to fill the storage tank (hr) 0.85714285714286
Time to empty the storage tank while ph-2 service is only running (hr) Never
Time to empty the storage tank while ph-2 & ASE service are running (hr) Never
Time to empty the storage tank while ph-2 & ASE critical are running (hr) Never

Note: Existing TE pump (see below curve) has a high operating head , meanhwile the actual
head is not exceeding 25mtr as per actual calculation , hence each pump is expected to delivery
around 95-100 m3/hr during actual operation.
Ajman WWTP Sludge to Energy
Service Water Calculations
Water Consumption @ All
operating at the same time Daily Consumption
Pressure Required Reference
- Worst Case Scenario m3/day
m3/hr
5.7 114 6 barg JESCO Submittal
22.976 459.52 6 barg JESCO Submittal
7.906 158.12 6 barg JESCO Submittal
31.624 632.48 6 barg JESCO Submittal

13.2 264 5 barg Alfa Laval Submittal

18.42 216 5 barg Bioair Submittal

Flow: Nozzle flow and vendor


172.8 172.8 4 barg recommendations
Besix-In-House Expertise

4 2 1 barg
4 2 2 barg
4 2 3 barg
4 2 3 barg
8 4 2 barg
2 1 1 barg
2 1 1 barg

261.096 1240.32 6.0 barg

60.296 1053.52 6.0 barg


Remarks/Assumptions

Daily consumption based on 20hrs operation


Daily consumption based on 20hrs operation
Not considered in ASE demand as it is already covered by Ph2 Booster
Not considered in ASE demand as it is already covered by Ph2 Booster

Worst case condition considered : pause every 15 seconds, instantaneous flow


during washing 4.4m3/hr - Daily consumption based on 20hrs operation

Instantaneous flow considered


Intermittent.
Worst case considered when both digesters require foam suppression at the same
time.
Assumption : one digester per day will require foam suppression
One washdown point at a time for maximum 30 minutes per day
One washdown point at a time for maximum 30 minutes per day
One washdown point at a time for maximum 30 minutes per day
One washdown point at a time for maximum 30 minutes per day
One washdown point at a time for maximum 30 minutes per day
One washdown point at a time for maximum 30 minutes per day
One washdown point at a time for maximum 30 minutes per day
Service water for Centrifuge polymer unit is considered part of the existing service
water booster set
Critical demands definition : all the demands that must run and need service water
all the times and in the same time.