Conventional
STP 1
Process Calculation
Coagulant - FeCl3
Sodium Hypochlorite - NaOCL
Sodium hydroxide - NaOH
Polymer Dosing
CIP Cleaning
Sodium Hypochlorite - NaOCL
Sodium hydroxide - NaOH
Hydrochloric acid - HCL
Unit
l/day
l/day
l/day
KG/day
l/day
l/day
l/day
Daily Quantity
Conventional
Daily Cost
QAR
5.90
41.00
100.00
1.11
1.50
1.20
1.30
22.00
2.11
2.60
2.53
1.20
1.30
1.60
STP 2
Coagulant - FeCl3
Sodium Hypochlorite - NaOCL
Sodium hydroxide - NaOH
Polymer Dosing
l/day
l/day
l/day
KG/day
Daily Quantity
Daily Cost
Conventional
QAR
19.39
1.50
166.00
1.20
332.00
1.30
4.14
22.00
l/day
l/day
l/day
6.92
8.54
8.31
Unit
1.20
1.30
1.60
hemicals Cost
MBR
Total Cost QAR
QAR
QAR
Daily Quantity
MBR
8.85
49.20
130.00
24.42
N/a
17.60
58.00
0.86
2.53
3.38
4.05
13.15
-
222.4
81,188.0
Daily Cost
QR
1.20
1.30
22.00
21.12
75.40
18.92
1.20
15.78
-
QAR
QAR
131.2
47,895.6
MBR
29.09
199.20
431.60
91.08
Daily Quantity
MBR
71.00
227.00
3.41
8.30
11.10
13.30
26.30
-
QAR
QAR
783.7
286,038.5
Daily Cost
QR
1.20
1.30
22.00
1.20
31.56
QAR
QAR
486.9
177,711.8
Sludge Production
Conventional
STP 1
Unit
Daily Sludge
Production
m3/day
0.80
Conventional
STP 2
Unit
Daily Sludge
Production
m3/day
2.80
MBR
STP 1
Unit
Daily Sludge
Production
m3/day
0.60
MBR
STP 2
Unit
m3/day
Daily Sludge
Production
2.40
292.00
219.00
Number of Truck
Cost of Sludge
per year
removal per Truck
36.50
1,500.00 QAR
Number of Truck
Cost of Sludge
per year
removal per Truck
127.75
1,500.00 QAR
Number of Truck
Cost of Sludge
per year
removal per Truck
27.38
1,500.00 QAR
Number of Truck
Cost of Sludge
per year
removal per Truck
109.50
1,500.00 QAR
54,750.00
191,625.00
41,062.50
164,250.00
Total Demand
Load
141
KW
Unit
3,170.00
KW.Hr
Conventional
STP 2
Total Demand
Load
326.3
KW
Unit
MBR
STP 1
Total Demand
Load
127.3
KW
Unit
2,777.00
KW.Hr
MBR
STP 2
Unit
Total Demand
Load
346.3
KW
tion Cost
1.50 QAR
QAR
1.50 QAR
QAR
3,687,960.00
QAR
1.50 QAR
QAR
1,735,575.00
QAR
1,520,407.50
QAR
1.50 QAR
QAR
3,725,737.50
QAR
QAR
QAR
QAR
5,246,145.00
5,423,535.00
177,390.00
AREA
Conventional
STP 1
Unit
Length
115
mtr
Width
50.00
mtr
Conventional
STP 2
Unit
Length
170
mtr
Width
72.50
mtr
MBR
STP 1
Unit
Length
45
mtr
Width
45.00
mtr
MBR
STP 2
Unit
Length
87
mtr
Width
84.00
mtr
Total Area
5,750.00
mtr sqaure
Total Area
12,325.00
mtr sqaure
Total Area
2,025.00
mtr sqaure
Total Area
7,308.00
mtr sqaure
9,333.00
18,075.00
8,742.00