Chemicals Co

Conventional
STP 1
Process Calculation
Coagulant - FeCl3
Sodium Hypochlorite - NaOCL
Sodium hydroxide - NaOH
Polymer Dosing
CIP Cleaning
Sodium Hypochlorite - NaOCL
Sodium hydroxide - NaOH
Hydrochloric acid - HCL

Unit
l/day
l/day
l/day
KG/day
l/day
l/day
l/day

Daily Quantity
Conventional

Daily Cost
QAR

5.90
41.00
100.00
1.11

1.50
1.20
1.30
22.00

2.11
2.60
2.53

1.20
1.30
1.60

Total cost per Day


Total cost per Year
Conventional

STP 2
Coagulant - FeCl3
Sodium Hypochlorite - NaOCL
Sodium hydroxide - NaOH
Polymer Dosing

l/day
l/day
l/day
KG/day

Daily Quantity
Daily Cost
Conventional
QAR
19.39
1.50
166.00
1.20
332.00
1.30
4.14
22.00

Sodium Hypochlorite - NaOCL


Sodium hydroxide - NaOH
Hydrochloric acid - HCL

l/day
l/day
l/day

6.92
8.54
8.31

Unit

Total cost per Day


Total cost per Year

1.20
1.30
1.60

hemicals Cost
MBR
Total Cost QAR

QAR
QAR

Daily Quantity
MBR

8.85
49.20
130.00
24.42

N/a
17.60
58.00
0.86

2.53
3.38
4.05

13.15
-

222.4
81,188.0

Daily Cost
QR

Total Cost QAR

1.20
1.30
22.00

21.12
75.40
18.92

1.20

15.78
-

Total cost per Day


Total cost per Year

QAR
QAR

131.2
47,895.6

MBR

29.09
199.20
431.60
91.08

Daily Quantity
MBR
71.00
227.00
3.41

8.30
11.10
13.30

26.30
-

Total Cost QAR

QAR
QAR

783.7
286,038.5

Daily Cost
QR

Total cost per Day


Total cost per Year

Total Cost QAR


85.20
295.10
75.02

1.20
1.30
22.00
1.20

31.56
QAR
QAR

486.9
177,711.8

Sludge Production
Conventional

STP 1

Sludge Production @ 18%

Unit

Daily Sludge
Production

m3/day

0.80

Conventional

STP 2

Sludge Production @ 18%

Unit

Daily Sludge
Production

m3/day

2.80

MBR

STP 1

Sludge Production @ 18%

Unit

Daily Sludge
Production

m3/day

0.60

MBR

STP 2

Sludge Production @ 18%

Unit

m3/day

Daily Sludge
Production
2.40

Sludge Production Cost

total Volume per


year

292.00

total Volume per


year
1,022.00

total Volume per


year

219.00

total Volume per


year
876.00

Number of Truck
Cost of Sludge
per year
removal per Truck

36.50

Total Cost QAR per year

1,500.00 QAR

Number of Truck
Cost of Sludge
per year
removal per Truck
127.75

1,500.00 QAR

Number of Truck
Cost of Sludge
per year
removal per Truck

27.38

1,500.00 QAR

Number of Truck
Cost of Sludge
per year
removal per Truck
109.50

1,500.00 QAR

54,750.00

Total Cost QAR

191,625.00

Total Cost QAR

41,062.50

Total Cost QAR

164,250.00

Power Consumption Cost


Conventional
STP 1

Total Demand
Load

141
KW

Unit

Consumption per day at


average

3,170.00
KW.Hr

Conventional
STP 2

Total Demand
Load
326.3
KW

Unit

Consumption per day at


average
6,736.00
KW.Hr

MBR
STP 1

Total Demand
Load

127.3
KW

Unit

Consumption per day at


average

2,777.00
KW.Hr

MBR
STP 2

Unit

Total Demand
Load
346.3
KW

Consumption per day at


average
6,805.00
KW.Hr

TOTAL MBR (STP1 & STP2) Power Consumption Cost Yearly =


TOTAL Conv. (STP1 & STP2) Power Consumption Cost Yearly =
TOTAL Saving If MBR is used in (STP1 & STP2) Yearly =

tion Cost

Cost per Kw.Hr

Total Cost QAR per


Year

1.50 QAR
QAR

Cost per Kw.Hr

Total Cost QAR per


Year

1.50 QAR
QAR

Cost per Kw.Hr

3,687,960.00
QAR

Total Cost QAR per


Year

1.50 QAR
QAR

Cost per Kw.Hr

1,735,575.00
QAR

1,520,407.50
QAR

Total Cost QAR per


Year

1.50 QAR
QAR

3,725,737.50
QAR

QAR
QAR
QAR

5,246,145.00
5,423,535.00
177,390.00

AREA
Conventional
STP 1
Unit

Length
115
mtr

Width
50.00
mtr

Conventional
STP 2
Unit

Length
170
mtr

Width
72.50
mtr

MBR
STP 1
Unit

Length
45
mtr

Width
45.00
mtr

MBR
STP 2
Unit

Length
87
mtr

Width
84.00
mtr

TOTAL MBR (STP1 & STP2) Occupied Area (m2) =


TOTAL Conv. (STP1 & STP2) Occupied Area (m2)=
TOTAL Area Saving If MBR is used in (STP1 & STP2) (m2) =

Total Area
5,750.00
mtr sqaure

Total Area
12,325.00
mtr sqaure

Total Area
2,025.00
mtr sqaure

Total Area
7,308.00
mtr sqaure

9,333.00
18,075.00
8,742.00