AREA- TG MDBFP Isolation & Normalization
UNIT-1/2 Procedure Date: 01.10.2010
1. PURPOSE:-
This document is prepared to guide the operating personnel while isolating and thereafter normalizing the
MDBFP of stage - I Units.
2. SCOPE:-
This shall be applicable to both units of stage - I (2x500MW units), NTPC Simhadri.
3. INTRODUCTION:-
To cater to the feed water requirement of the boiler, three boiler feed water pumps have been provided (Two
Turbine driven BFPs & One Motor driven BFP). During normal operation, both TDBFPs remain in service
and MDBFP remains as standby on auto. MDBFP is generally used during unit start up or shut down, low
load operation of the Unit or during emergency situations. This document deals with the total isolation and
normalization procedure of MDBFP.
Description Parameters
Main pump Booster pump MOTOR
Manufacturer BHEL/Hyderabad BHEL/Hyderabad BHEL/Hyderabad
Outer Barrel, Inner Horizontal Double
Cage Rotor
Type Radially Split Casing, Suction, Single
Multi Stage Centrifugal Discharge Centrifugal Asynchronous Motor
No. of Stages 4+1 kicker stage 1 ***
Flow Rate 990 TPH 990 TPH ***
Speed 5465 RPM 1494 RPM 1500 RPM
Recirculation Required for
400 TPH 400 TPH ***
Continuous Minimum Flow
Power Consumption/Output (KW) 6223 608 10000 KW (Max)/11KV
Inlet/Suction Pressure 26.4 9.06 6.33 Kg/Cm2
Exhaust/Outlet Pressure 202.5 20.3 0.1064 Kg/Cm2
o o
Inlet/Suction Temperature 164 C 164 C ***
NPSH at 3% Head Break Down 50 (bar) 4.5 (bar) ***
Discharge Pressure at Kicker Stage 255.02 (bar) *** ***
Efficiency 81 % 81.5 % 99%
Full Load Current *** *** 601.5 Amps
Starting Current *** *** 2720 Amps
Direction of Rotation CCW from BP NDE CW from DE CCW from BP NDE
5. RESPONSIBILITY:-
TDE/UCE/SCE
6. ISOLATION PROCEDURE:-
6.1. PRECONDITION:-
a. MDBFP is unloaded and stopped. Discharge valve and its IBV are closed.
LOCKING BY CHAIN:
i. Recirculation manual valve at deaerator floor.
ii. Booster pump suction valve at 8.5M
iii. Super heater & Reheater spray manual valves at 8.5M.
7. NORMALISATION PROCEDURE:-
UNLOCKING OF CHAIN:
i. Recirculation manual valve at deaerator floor
ii. Booster pump suction valve at 8.5M
iii. Super heater & Reheater spray manual valves at 8.5M.
• Inform the other units regarding MDFP being taken I/S to avoid parallel activities in 11 KV bus
• Note Starting Current, Normal Current and Dip in 11 KV Bus
2
• Open the BFP discharge valve at 60 kg/cm of discharge pressure
• Record all TSI and other parameters before and after rolling.
• Feed water side drain/vent valves are to be tightly closed before attaining full pressure.
• Open Ammonia dosing valve.