Purpose : This procedure is used as work instruction for Turbine Operator, Desk and Field
Engineer and Shift Incharge
Procedure:
Before Starting:
1) Check the permits issued for the above equipment are returned.
2) Suction valve should be open.
3) Open suction relief valve.
4) Oil level in Thrust bearing should be normal
5) Open the inlet & outlet valves of DMCW line to thrust bearing and ensure that DMCW
pump is running.
6) Open the valves for staffing box sealing (both CEP discharge & overhead CST)
7) Open the bypass of discharge valve.
8) Open the GSC inlet & outlet valves (CD-7 & CD-8)
9) Open the isolation valves of CD-25 (Minimum recirculation line).
10) Open the isolation valves of CD-21 (Excess Return line to overhead CST).
11) Open the isolation valves of DM-20 (Emergency make up to Condenser).
12) Open the isolation valves of DM-15 (Normal make up to Condenser).
13) Open the isolation valves of CD-14 & CD-19 (Deaerator level control).
14) Open the CEP recirculation valve from DCS.
15) Open the isolation valves of vent line (CEP discharge & Canister vent)
16) Charge all the local pressure gauges/transmitters/switches
17) Local Push Bottom should be released
18) Hot well level gauges should be visible.
19) CEP breaker should be in service & remote.
20) All other permissive should be available at DCS.
21) All CEP protection & interlock should be through.
22) Start the CEP from DCS.
Isolation of CEP:
Page 1 of 2
Desk Engineer Head - Operation
Prepared By Reviewed & Approved By
Standard Operating Procedure
Indiabulls Power Limited
Title:Standard Operating Procedure Document No SOP/OPNS/08
for Line Up & Isolation of CEP Issue No / Date
Operations Department Rev. No / Date 00/
Cross Reference :
RECORDS : Nil
Page 2 of 2
Desk Engineer Head - Operation
Prepared By Reviewed & Approved By