TOOLS NEEDED Walkkie talkie 1set, F-rods, Torch light, Spanner set for
safety valve gagging.
PPEs REQUIRED Helmet, safety shoe, earplug.
3.1 Isolate the power supply of all BFPs and close their suction valves Opn
3.2 BFP Recirculation gate valves closed. Opn
3.4 Dea Extraction MOV EX 14 closed and further hand tightened. Opn
3.5 CRH to Dea EX-001 & its B/P valve closed and further hand tightened Opn
3.6 DM-20 & its before gate valves closed. Opn
3.7 HPH 5 drain condensate to dea DR-11 isolation valves closed Opn
3.8 HPH 5 drain condensate to dea bypass MOV DR-43 closed. Opn
3.9 HPH 6 drain condensate to dea DR-6 isolation valves closed. Opn
3.10 HPH 6 drain condensate to dea bypass MOV DR-42 closed. Opn
3.11 Level column isolation valves (both sides 4nos) closed. Opn
3.12 Dea Overflow bef & aft gate valves closed. Opn
4.3 If the safety valve has not opened for a Deaerator pressure of 7.5-7.6 ksc pressure Opn, TOS
4.4 Close the AST to Dea PCV B/P gate valve Opn, TOS
4.5 Open SM 20 valve from control desk Opn, TOS
4.6 Adjust the spring tension for the safety valve T.Mtce
4.8 If the safety valve has opened note down the pressure at which it opened and closed Opn, TOS
4.9 Close the AST to Dea PCV B/P gate valve. Opn, TOS
4.11 Adjust the spring tension for the safety valve to advance or delay the opening of T.Mtce
safety valve.
4.12 If the safety valve opened at the set pressure follow the step 4.13 Opn, TOS
4.13 If the safety valve opened at the set pressure repeat the process for other safety Opn, TOS
valves by following the steps 4.1 to 4.5 T.Mtce
4.14 Prepare a protocol and get is signed for reference. TOS, T.Mtce
4.15 Normalize the scheme after the safety valve floating work is over. Opn
DGM/T.Mtce DGM/SAFETY
CGM/TPS-II