NLC INDIA LTD

THERMAL POWER STATION-II, NEYVELI


TOS DIVISION

SOP FOR Deaerator safety


valve floating - Turbine
TITLE scheme preparation cum DOC ID:TOS/SOP/014
operating procedure in Stage II
Turbine
ISSUE DATE 01-08-2020 REVISION : 00 DATE :

SCOPE OF WORK Deaerator safety valve floating - Turbine scheme preparation


cum operating procedure in Stage II Turbine
SITE RESPONSIBILITY CM/T.Mtce and DCE/TOS
Unit should be in shut down condition,
ISOLATIONS REQUIRED
Deaerator safety valve floating scheme should be made ready,
AST header to be charged and maintained 12ksc.

TOOLS NEEDED Walkkie talkie 1set, F-rods, Torch light, Spanner set for
safety valve gagging.
PPEs REQUIRED Helmet, safety shoe, earplug.

S.No Description Responsibility


1.0 Ensure the compliance of PPE by workers and executives. Opn,TOS &
T.Mtce
2.0 Required conditions:

2.1 Unit should be under shutdown condition Opn

2.2 Ensure that no pending LCs, pertaining to Deaerator. Opn

2.3 Ensure that CT pump is in service Opn


2.4 Fill the Deaerator to normal working level Opn
2.5 Ensure that AST header Charged. Opn

2.6 Preheat the Dea water to 75 °C. Opn

2.7 Ensure that CEP is not running. Opn


3.0 Deaerator safety valve floating scheme preparation activities.

3.1 Isolate the power supply of all BFPs and close their suction valves Opn
3.2 BFP Recirculation gate valves closed. Opn

3.3 Main condensate isolation valve at dea level closed. Opn

3.4 Dea Extraction MOV EX 14 closed and further hand tightened. Opn

3.5 CRH to Dea EX-001 & its B/P valve closed and further hand tightened Opn
3.6 DM-20 & its before gate valves closed. Opn

3.7 HPH 5 drain condensate to dea DR-11 isolation valves closed Opn
3.8 HPH 5 drain condensate to dea bypass MOV DR-43 closed. Opn

3.9 HPH 6 drain condensate to dea DR-6 isolation valves closed. Opn

3.10 HPH 6 drain condensate to dea bypass MOV DR-42 closed. Opn

3.11 Level column isolation valves (both sides 4nos) closed. Opn

3.12 Dea Overflow bef & aft gate valves closed. Opn

3.13 Operating vents of HPH 5, 6 closed at dea level. Opn

3.14 Healthiness of SM-20 valve operation to be checked Opn


4.0 Deaerator safety valve floating procedure
4.1 Gag all the safety valves except the one for floating T.Mtce
4.2 Slowly raise the Deaerator pressure by opening AST to Dea PCV B/P gate valve. Opn, TOS
Do not exceed the Deaerator pressure more than 7.6 ksc.

4.3 If the safety valve has not opened for a Deaerator pressure of 7.5-7.6 ksc pressure Opn, TOS

4.4 Close the AST to Dea PCV B/P gate valve Opn, TOS
4.5 Open SM 20 valve from control desk Opn, TOS
4.6 Adjust the spring tension for the safety valve T.Mtce
4.8 If the safety valve has opened note down the pressure at which it opened and closed Opn, TOS
4.9 Close the AST to Dea PCV B/P gate valve. Opn, TOS

4.10 Open SM 20 valve from control desk. Opn, TOS

4.11 Adjust the spring tension for the safety valve to advance or delay the opening of T.Mtce
safety valve.

4.12 If the safety valve opened at the set pressure follow the step 4.13 Opn, TOS

4.13 If the safety valve opened at the set pressure repeat the process for other safety Opn, TOS
valves by following the steps 4.1 to 4.5 T.Mtce

4.14 Prepare a protocol and get is signed for reference. TOS, T.Mtce
4.15 Normalize the scheme after the safety valve floating work is over. Opn

DGM/EEMG & WCTP (O) DGM/O&OS

DGM/T.Mtce DGM/SAFETY

GM/ Mtce GM/O&M