INTRODUCTION
The intent of the instruction is to ensure safe coasting down of all
equipments and brought to unit on safer side. The sequences of
activities on boiler, turbine and auxiliaries for unit block out condition,
unit trip (power supply available) and immediate unit start up which
are to carried out in a coordinated and sequential manner by concern
engineer. Failure to do so may result in unforeseen delays and costly
damages. A checklist, in such circumstances, can help in carrying out
the activities in a coordinated manner. However, it is pertinent to note
here that such checklists are for normal cases only and under
unusual circumstances the procedure to be followed will be
determined by the judgment of the operating personnel.
RESPONSIBILITY
The shift charge engineer/ unit controller will distribute the checklist
document to concern engineer during every trip of the unit.
The local Boiler engineer is responsible for doing the following
sequence of activities and filled up the checklist formats & coordinate
with shift charge engineer/ unit controller. SCE/ UC is collected the
filled document from concern engineer and summit to O&E.
TCPL-1X63.75 MW POWER PLANT, GUMMIDIPOONDI -2-
ON BLOCKOUT CONDITIONS:
* Ensure that HFO trip V/V, HFO Nozzle v/vs are closed and
open short r/c v/v of HFO. & Ensure that LDO TRIP V/V & nozzle
v/vs are closed.
* Check that the running mills and seal air fan are tripped and
seal air v/vs are closed
Ensure that feed water control v/v isolation v/vs are opened.
After giving oil guns start command from DCS, ensure that
flame are stable and any oil leakage noticed than isolate oil
line.
Ensure that the seal air fan is running (after starting through
DCS)
After removing oil guns in service put scavenge mode for oil
nozzle cleaning.
Carryout APH soot blowing
Name:
Signature:
Activities Remarks
Ensure that HFO trip V/V, HFO Nozzle v/vs are closed and
open short r/c v/v of HFO. Ensure that LDO Trip V/V & nozzle
v/vs are closed.
Stop the bottom ash conveyor system. Check that the bottom
ash conveyor level is normal and sealing is ok
Check that the running mills and seal air fan are tripped and
seal air v/vs are closed
After giving oil guns start command from DCS, ensure that
flame are stable and any oil leakage noticed than isolate oil
line.
Ensure that startup vent mov is opened& steam is coming
out.
Date: Responsibility: local boiler engineer
Name:
TCPL-1X63.75 MW POWER PLANT, GUMMIDIPOONDI -5-
Signature:
Activities Remarks
Ensure that the seal air fan is running (after starting through
DCS)
Normalize SH spray
After removing oil guns in service put scavenge mode for oil
nozzle cleaning.