paradip refinery
Dated:20.08.2023
Topic covered: EMERGENCY HANDLING ON POWER FAILURE
Faculty: MD ARIF
Training session attended by:
Sl. Sl.
Name Signature/date Name Signature/date
No. No.
Mr. AVANISH
1 7
Mr. AASIM
2 8
Mr. CHANDAN
3 9
Mr. GIRIRAJ
4 10
Mr. DURGESH
5 11
Mr. RAKESH
6 12
Discussion points:
COMMUNICATE WITH CPP AND IF POWER CLEARANCE NOT RECEIVED WITHIN SHORT PERIOD OF TIME, TAKE
DECISION TO PROCEED FOR UNIT S/D AND INFORM TO RSM & UNIT INCHARGE
ENSURE, EMERGENCY LAMPS PROVIDED IN THE CONTROL ROOM SHOULD GET SWITCHED ‘ON’
AUTOMATICALLY.
ENSURE ALL THE SAFETY INTERLOCK IS ACTIVATED AS PER LOGIC
ENSURE CDU/VDU FURNACE MAIN STACK DAMPER IS 100% OPEN; BOTH FURNACES FG/FO S/D VALVES
ARE CLOSED.
ENSURE CDU/VDU FURNACE FG/FO SHUT DOWN VALVES ARE CLOSED
CLOSE INDIVIDUAL CONTROL VALVES OF FG/FO LINE FROM DCS
ISOLATE THE B/VS OF INDIVIDUAL FG & PILOT GAS BURNER AT THE FIRING P/F.
IN VACUUM FURNACE ALSO ISOLATE INDIVIDUAL B/V OF VENT GAS BURNERS
CLOSE EJECTOR MOTIVE STEAM MAIN C/V HIC-3013.