You are on page 1of 5

EMERGENCY MOCK

DRILL REPORT
l'RO,IECT: ENGINEERING, PIW CUR I MENT AND CONSTRUCTION OF MARINE FACILITIES AT GOPALPUR PORT, ODISllA, INDIA
Document No. Date Rev. Page
AFC/3749/ HSE/032 27.12.2017 RO Page I of 5

Report No. 14
Site: Gopalpur Port, Odisha, Job Code: 3749
Date: -Jan- 2021
Location: Berth no 2
Type of Mock Drill: Fire Drill
Purpose: To check effectiveness of handling emergency situation.
Conducted by: HSE Depai1ment

PART A: - Sequence Planned :-


); Identifying & reporting of emergency situation: Planed on Fire Drill at Berth No-2 Area . Site
>
Manager, Engineer & Supervisor will inform HSE Executive I Project manager about incident. After
on spot discussion, emergency will be declare.
); Respective communication and other information to all concerned regarding emergency
>
with respect to the situation for fire, personal injury, natural calamity : ERT (Emergency
Response Team) coordinator will communicate all above information and coordinate for post
action.
); All clear siren/ declaration: Whistle will be raised to declaration of Emergency.
>
Specify the action to be taken by emergency response team: Emergency response team
);
> coordinator should be informing all personnel to evacuate the area immediately.
); Assembly: All personnel should be assembled at designated Assembly
>
Point. Head count confirmation: - Head count should be done by
);
> Execution team.
); Situation normalization, All clear message from spot: Situation normal
); should be described by ERT
>
>
& Rescue Team.
); Briefing all concerned about the mock drill result: Mock drill result should be briefly described
>
by HSE.
); Disbursement of gathering: All people should be aware of emergency situation and how to save
>
him- self.
);
PART Resume theprepared
B (To be normal activity: Afterdrill)
after mock declare
:- normal situation , all workmen will be resumed their duty.
>
Reporting to all concerned : All workmen will be report their concern.
Sequence actual: (Actual sequence with time chronology are to be mentioned in line to the
sequence planned)
); Identifying & reporting of emergency situation: - On 17/07/2020 at around 15.35 hrs. One welder (S.
>
Ravikumar, San Marine) was performed welding works near combustible storage drums, suddenly
catches fire inside of the garbage storage drums which are placed near hot work area at SBW area.
One worker (R. Ramesh Chandra Rao, San Marine) working near fire located areas, he was immediately
taken fire extinguisher & sand bucket which was placed near hot work area and used to extinguish the
Contra ctor Employer 's Representative Employer
EMERGENCY MOCK
(.AFc Shapoorji Pa llonji DRILL REPORT
EJ. INFRA CONSU LTANTS
<i>
onsJ
AFCON S lllf RAS TR
UCTU R E U l.11TED
PROJECT: ENGINEEIUNG, PIWCUREMENT AND CONSTRUCTION OF MARINE FACILITIES AT GOPALPUR PORT, ODISllA, INDIA
Document No.
fire. Date Rev. Page
AFC/3749/HSE/032 27.12.2017 RO Page 2 of 5
Other workmen immediately came to the same location. One worker informed to site supervisor Mr.
V Suresh & he was informed to Emergency Contact Number, First Aider, Mr. Alok Kumar (CPE
Engineer), Mr. Pritam Mukhe1jee (HSE In charge). Decision was taken to declare emergency and
whistle was raised for declared emergency at 15:45 hours. everybody stopped their activities
immediately and gathered near assembly point
Respective communication and other information to all concerned regarding emergency with
respect to the situation for fire, personal injury, natural calamity: Mr. V.Suresh was informed to
P&A (Admin), for vehicles.
Specify the action to be taken by emergency response team: Emergency response team was
reached the spot and send to Assembly point all the workmen within few minutes.
Assembly: All personnel were assembled at designated assembly point.
Head count confirmation: - Head count was taken at the assembly point and found total 14 Nos.,
No one was m1ssmg .
Situation normalization. All clear message from spot: Situation normal was described by ER
team.
Briefing all concerned about the mock drill result: Mock drill result was briefly described by HSE ln­
Charge
Resume the normal activity: After declare normal situation, all workmen were resumed their duty.

Emergency Response Team Head : Mr. Alok Kumar

Execution Team Head : Mr. V Suresh

First Aid Team: Mr. Tirumala Rao

Observer: Mr. Pinaki Ray, Mr. Pritam Mukherjee


Contra ctor
EMERGENCY MOCK
Employer 's Representative Employer

[AFCO
ns )
ShapoorjiPallonji
DRILL REPORT
l I NFRA CONSU LTANiS
-<ii
AF CONS IN F RASTRU C
TURE LI M I TED

PIW.IECT: ENGINEERING, PIWCUREMENT AND CONSTRUCTION OF MARINE FACILITIES AT GOPALPUR PORT, ODISIIA, INDIA
Document No. Date Rev. Page
AFC/3749/HSE/032 27. 12.2017 RO Page 3 of 5
Sequences of Emergency Preparedness:-
Time Details

15:35 At SBW area, Welder (Mr. S. Ravikumar) started to welding works near combustible
materials storage drums.

15:37 Materials storage drums suddenly catches fire.

15:38 Co-workers & Site foreman noticed this incident, immediately informed to site supervisor.

15:39 Mr. R. Ramesh Chandra Rao (San Marine) immediately reached at same point and
extinguishers the fire immediately.

15:40 Others crew members immediately reached at same point and help to extinguishers the fire
completely.

15:43 Ambulance with first aider reached at spot location.

15:45 Site Manager was declared site emergency instructing to stop all activities at that location.

15:47 HSE In Charge was called workforces to evacuate the area and gathering at emergency
assembly point further rescue management.

15:50 HSE In Charge addressed to workforces regarding emergency situations and details of
rescue management system of our company.

15:58 Head count was done along with the staff and workers, as it was recorded in muster roll
and confirmed the presence of all the personnel at that location.

16:05 Emergency declared off by the Site Manager and workforces ere sent back to resume
w their normal job.
Contra c tor
EMERGENCY MOCK Employer's Representative Employer

]
[AFCOns
Af CONS lrH RASTRUCTU R E LIM I
Shapoorji Pallonji
DRILL REPORT
I NFRA CONSULT ANTS
(i)
TED

PHO.mer: ENGINEERING, PIWCUHEMENT AND CONSTIWCTION OF MAHINE FACILITIES AT GOPALPUH l'OHT, ODISl-IA, INDIA
Document No. Date Rev. Page
AFC/3749/HSE/032 27.12.2017 RO Page 4 of 5

Observations:
../ Immediately one person reached for extinguish the fire.
../ Everybody was aware about whistle blowing .
../ They also know the communication system as everybody gathered near assembly point, when
the emergency arises.
Good Practices and points observed during emergency drill :­
../ Good Communication .
../ Well known to use of fire extinguishers .
../ Good Emergency Arrangement.
Contractor Empl oyer 's R E mpl

[AFcon EMERGENCY MOCK epresentative oyer

AfC ONS lrlfRASTRUCTURE LIMITED Shapoorji


DRILL REPORT (i)
sJ
Pallo nji
INFRA
CONSULTANTS
l'I WJE CT : ENGINEERING, l' I WC Ul mM E N T AND CONSTRU CTI ON OF MARINE FACILITIES AT GOl'ALP UR PORT, ODISllA, INDIA
Document No. Date Rev. Page
AFC/3749/ HSE/032 27.12 .2017 RO Page 5 of5

. / Workmen were aware about whistle blowing .


. / They know to gather near assembly point after declare emergency .
Conclusions:-
Everybody knows their roles and responsibility to handle emergency
situation .
Lacunae detected during rehearsal:-
. / Emergency contact
numbers not displayed at site.
Head Count: 14 Nos. Overall Performance:
Good Mode of communication: Mobile phone & Whistle.
Post rehearsal Emergency Preparedness
Meeting:-
All workforces including sub-contractor were assembled and briefed about the emergency and
preparedness of rescue management. The potential near miss may cause serious incident and follow up the
procedures of safe working practices .

Recommendations:-
Emergency contact numbers should be displayed at SBW barge repairing
areas. Fire Extinguishers usage training frequently organized.

Pritam Mukherjee Vidyasagar Babu

HSE In Charge Project Manager