INDUSTRIAL TRAINING REPORT
A R G YA R A F I S E P U T R O – A 1 9 E M 0 5 7 9
LITERATURE REVIEW 02
03 TRAINING INFORMATION
CONCLUSION 04
2
Part 1 : Introduction
i) Background of Industrial Training
ii) Objective
iii) Scope
iv) Summary
By doing internship, student expected to receive
This industrial training give student to gain more
an orientation and theoretical knowledge to the
knowledge for working practical.
company for which student is interning.
BACKGROUND OF INDUSTRIAL
TRAINING
OBJECTIVE
Knowing steps that should be use when conduct Learn Inspection and Test Plan for
Quality control for pressure vessel. pressure vessel in oil & gas industry.
5
INDUSTRIAL TRAINING SCOPE
6
All the knowledge and skills gained at
SUMMARY OF university must be applied in the
INDUSTRIAL workplace, where proper and adequate
procedures must be followed. Knowledge
TRAINING
have been chosen based on the problem
statement and limitations encountered.
Industrial training is a place for students
to develop and express their ability.
7
Part 2 : Literature
Review
NO AUTHOR TITLE YEAR REMARK
9
Part 3 : TRAINING
INFORMATION
TRAINING EXPERIENCE
11
Reviewing ASME Section VIII Div. 1
12
THE DIFFERENCES BETWEEN DIV. 1 & 2
DIVISION 1 DIVISION 2
13
REVIEWING INSPECTION AND TEST PLAN (ITP)
14
Hierarchy Flowchart process
of Inspection and Test Plan
15
CONCLUSION
Based on the knowledge about Inspection and Test Plan (ITP), ITP is a
structured document that outlines the specific and standards requirement
for inspecting a pressure vessel. By clearly defining the inspection and
testing activities, the ITP helps to ensure that the product or system is
safe, reliable, and fit for its intended purpose. The ITP includes a range of
activities such as inspections, tests, hold points, witness points, and
reviews, which are carried out by designated parties with specific
responsibilities. Monitoring is also a critical aspect of an ITP, allowing
designated parties to observe and record the progress of the inspection
and testing activities and ensure that they are being carried out according
to the specified requirements or standards referring to BCD3-000-43-SPC-
4-001-00-2-IFR and government regulation 84.K/38/DJM/1998