INDUSTRIAL TRAINING REPORT

A R G YA R A F I S E P U T R O – A 1 9 E M 0 5 7 9

UTM JOHOR BAHRU


PRESENTATION CONTENT
01 INTRODUCTION

LITERATURE REVIEW 02

03 TRAINING INFORMATION

CONCLUSION 04
2
Part 1 : Introduction
i) Background of Industrial Training
ii) Objective
iii) Scope
iv) Summary
By doing internship, student expected to receive
This industrial training give student to gain more
an orientation and theoretical knowledge to the
knowledge for working practical.
company for which student is interning.

BACKGROUND OF INDUSTRIAL
TRAINING

Students will be exposed to new challenges


aimed at improving their soft skills and applying
their understanding to develop innovation and
ideas while also gaining work experience during
this program.
4
To improve knowledge and skill in
manufacturing processes in mechanical
engineering, especially in the field of
Quality engineering.

OBJECTIVE

Knowing steps that should be use when conduct Learn Inspection and Test Plan for
Quality control for pressure vessel. pressure vessel in oil & gas industry.

5
INDUSTRIAL TRAINING SCOPE

gain the real work experience and provide a


meaningful assistance to the company. In general,
Inspection and Test Plan in quality control project
department mostly discussing about how to conduct
quality control step by step for pressure vessel in oil &
gas company

6
All the knowledge and skills gained at
SUMMARY OF university must be applied in the
INDUSTRIAL workplace, where proper and adequate
procedures must be followed. Knowledge
TRAINING
have been chosen based on the problem
statement and limitations encountered.
Industrial training is a place for students
to develop and express their ability.

7
Part 2 : Literature
Review
NO AUTHOR TITLE YEAR REMARK

Pressure vessels are closed containers used in


industry to hold gases or liquids at a different
1 Moss & Basic Pressure Vessel Design Manual 2013 pressure from the ambient pressure. Their
applications include use in oil refineries, nuclear
reactors, vehicle airbrake reservoirs, and more

The concept of quality is subjective and varies


from person to person. Manufacturing Quality
2 Pullarcot Inspection and Test Plan 2015 Control aims to objectify and quantify quality so
it can be measured and monitored through
Inspection and Testing activities.

SECTION VIII Rules for


Construction of Pressure regulations may require the use of this Division
3 ASME Vessels 2019 ASME Boiler and 2019 of the Code for vessels or components not
Pressure Vessel Code An considered to be within its scope
International Code

9
Part 3 : TRAINING
INFORMATION
TRAINING EXPERIENCE

Reviewing ASME VIII Div. 1

Reviewing Inspection and Test Plan.

11
Reviewing ASME Section VIII Div. 1

In this section, there are 3 subsection occurs in it. Subsection A, B, and


C. Each subsection will discuss different information for making a new
pressure vessel. Subsection A discuss about the general information
and requirement, for Subsection B discuss more specific about
fabricating process and for subsection C is mostly discuss about the
material later will be use for the pressure vessel.

12
THE DIFFERENCES BETWEEN DIV. 1 & 2

DIVISION 1 DIVISION 2

Apply pressure from 15 to 3,000 psi Apply pressure up to 10,000 psi

more flexibility in the design approach,


Design specification for various
but requires a more comprehensive
component. analysis.
Certification process require a more
Certification process criteria not that comprehensive certification process due
complex to the increased complexity of the design
and analysis.

13
REVIEWING INSPECTION AND TEST PLAN (ITP)

By reviewing this document, it shows all the step process of inspecting


a new pressure vessel, what should be prepared before conducting the
inspection. Should be good enough if in this ITP is shown the referring
document in detail.

14
Hierarchy Flowchart process
of Inspection and Test Plan

15
CONCLUSION
Based on the knowledge about Inspection and Test Plan (ITP), ITP is a
structured document that outlines the specific and standards requirement
for inspecting a pressure vessel. By clearly defining the inspection and
testing activities, the ITP helps to ensure that the product or system is
safe, reliable, and fit for its intended purpose. The ITP includes a range of
activities such as inspections, tests, hold points, witness points, and
reviews, which are carried out by designated parties with specific
responsibilities. Monitoring is also a critical aspect of an ITP, allowing
designated parties to observe and record the progress of the inspection
and testing activities and ensure that they are being carried out according
to the specified requirements or standards referring to BCD3-000-43-SPC-
4-001-00-2-IFR and government regulation 84.K/38/DJM/1998

16