Professional Documents
Culture Documents
5.0%
4.0%
2.9%
3.0%
2.4%
2.1% 1.9%
2.0% 1.6%
1.4% 1.4%
1.2%
1.0% 1.1% 1.1% 1.1%
1.0% 0.6% 0.6%
0.4% 0.3%
0.2% 0.1%
0.0%
8/9 8/10 8/11 8/12 8/13 8/14 8/15 8/16 8/17 8/18 8/19 8/20 8/21 8/22 8/23 8/24 8/25 8/26 8/27 8/28 8/29 8/30 8/31 9/01
%
GP12 PERFORMANCE
% GP12 WAREHOUSE DETACHMENT AGOSTO
7.0%
6.1%
6.0% 5.9%
5.0%
4.0%
3.0% 2.8%
2.3%
2.1%
2.0% 1.9%
1.6%
1.4%
1.2%
1.1% 1.1%
1.0% 0.9% 1.0%
1.0%
0.6% 0.6%
0.4% 0.3%
0.2%
0.0%
8/9 8/10 8/11 8/12 8/13 8/14 8/15 8/16 8/17 8/18 8/19 8/20 8/21 8/22 8/23 8/24 8/25 8/26 8/27 8/28 8/29 8/30 8/31 9/01
% GP12 WAREHOUSE TAB AGOSTO
0.2%
0.1%
0.1%
0.1%
0.1%
0.1%
0.0%
8/11 8/16 8/23 8/30
% GP12 WAREHOUSE GAP AGOSTO
0.2%
0.2%
0.1%
0.1%
0.1%
0.1%
0.0%
8/21 8/29 8/31 9/01
The problema detachment
Loose delamination sheets found on rotor substacksLoose delamination found on PT00383250-B when on OP30 heater. Top substack on
all there was not fully seated on guidepins and had a loose delamination sheet between it and the substack below.The loose sheet caught
on the heater’s guide pins. This prevented the top substack from correct placement. The temperature sensor could not take a proper read-
ing due to askew substack placement.This resulted in OP30 heater overheating and burning substack.
Parts with delamination reported by the
customer
Burnt parts resulting from delamination
defect
5 Por que´s Deteccion
¿Por qué? El bonding necesita 200° para activarse durante un mayor tiempo
EXIT
ENTRANCE
Panel Operation
ENTRANCE
ENTRANCE
QUALITY LAB
Corrective actions
Temperature setting Temperature analysis
Temperature setting
PLAN ACTION
ACTION PLAN
ISSUE LEAD
DELAMINATION ON ROTOR DV4 HJ CHO
PRIORI % OF
ACTION RESPONSIBLE STATUS START END Comments
TY COMPLETENESS
ANALYSIS OF COIL SHEETS
Send shetts lamination for bonding analysis Mario Lopez 2023-08-28 2023-09-03
Comparison of results Mario Lopez 2023-09-03 2023-09-03 After recieved results
Oven #2 Parameters test (Temperature-Time)
Blue taper Temperature check for 8 pcs (Peak 29.08.2023: The pieces remained longer inside the oven, due to a
Mario Lopez Closed Medium 100 29/08/2023 29/08/2023
temperature value) for main oven failure of the rotob. These parts are excluded from the sampling
Blue taper Temperature check for 4 pcs (Peak
Mario Lopez Closed Medium 100 29/08/2023 29/08/2023 29.08.2023: Result between 132 to 160 Celsius
temperature value) for preheating
Delamination validation with cutter 6 pcs Mario Lopez Closed High 100 29/08/2023 29/08/2023 29.08.2023: The parts with L* value 35~50 have better resistance
Yellowing validation by Colorimeter of
Mario Lopez Closed High 100 29/08/2023 29/08/2023 Excel file
Production parts
Tensile test (3 pcs) Mario Lopez Closed High 100 29/08/2023 30/08/2023 Excel file. 2 graphs
Oven #2 Temperature Analysis
Daily verification of machine start-up (Oven #2 29.08.2023: Daily checklist. Values remain according to the settings
Until the process is
real value temperature) + Part confirmation Angela Roblero On going High 50 24/08/2023 30.08.2023: Daily checklist. Values remain according to the settings
controlled
Temperature from Pre-heating oven 31.08.2023: Daily checklist. Values remain according to the settings
Purchase order for 2 colorimeters. Antonio Martinez Closed High 100 28/08/2023 29/08/2023 Arrived 29 August
29.08.2023: Sent 29 Aug for repair with external lab, external lab
needs to check the equipment to provide estimated Repair time,
expecting answer from Lab 30 Aug.
Repair & calibrate old Colorimeter Antonio Martinez On going Medium 50 29/08/2023 TBD
30.08.2023: Pending the verdict of the supplier. He is analyzing the
colorimeter. No response has been received yet.
31.08.2023: Damaged colorimeter needs to be sent back to the
manufacturer (Konica) for repair due to the parts that are damaged.
Make a visual aid to measure 3 points at the top 31.08.2023: It is required to place the colorimeter at specific points
Angela Roblero Open High 0 31/09/2023 01/09/2023
and bottom to measure the L* value.
Verify the FIFO of each line to respect the correct 01.09.2023: A check sheet will be created to control the FIFO on
Antonio Martinez Open High 100 01/09/2023 TBD
flow of material production and process dates. each line.
Determine additional controls (Yellowing check) 29.08.2023: Date depends on the completeness of correlation
Mario Lopez Open High 0 TBD TBD
after heating based on correlation results analysis
PLAN ACTION