Professional Documents
Culture Documents
Workshop Management Planning
Workshop Management Planning
PLANNING
WORKSHOP
MANAGEMENT
1. WHY DOES IT NEED PLANNING FOR A TRAINING
WORKSHOP?
Formal training
• Fundamental training in a scope of formal training
• Training on key selected occupation
Work-space
• Total area of workshop
• Number of work-benches are base for calculating quantity of trainees
• Number and capacity of break-rooms and WCs
• Unused spaces which can be used in case of need for and during training
• Note: any cost rising?
• Other capacities for expanding (medium and long terms)
• Planning for use in medium and long terms
• Cost rising as expanding and buying more facilities
Cont…..
• The use frequency is the ratio between the average rate of production and existing
capacities (machines, manpower, space, ...)
• Unit of use frequency measure is [%]
• Use frequency = average rate of production / existing capacities:
• Untapped capacity [%] = 100 – frequency of use
• If, currently, up to 100% capacity of all resources is the goal of the enterprise, the
new approach
indicates that the frequency of full-time use of all the resources is not always have a
positive impact on training practice workshops.
Cont…..
Training plan including a time sequence and duration of the training units is expected for a
defined period.
• The training should be arranged a meaningful criteria which is consistent
with each other
• Reservations and corresponding utilization of resources should be planned
for next train_x0002_ing courses.