Professional Documents
Culture Documents
Main Work Flow Process
Main Work Flow Process
Working Process
Field Repair Process Workshop Repair
External Work Process
Process
Yes
Stock Issue Update
Warehouse
Inventory
No Value
PR Receive
Purchasing
Price
PO
Information
Main Work Flow Process (Site)
Workshop
Yes
Stock Issue Update
Warehouse
Inventory
No Value
PR Receive
W’house SKHQ
Price
SPB
Information
Main Work Flow Process
• WO = Work Order
• MOL = Mechanic Order List (Part Order from
Mechanic)
• SPB = Surat Pengiriman Barang (Part Delivery
Note)
• PR = Purchase Request
Workshop Activity
• Machine Incoming Inspection
• Pre Delivery Inspection
• General Overhaul
• Component Overhaul
• Part Repair
• Small Component Repair
• Machine Performance Test
• Testing & Adjusting
• Periodic Maintenance (LV, Genset, Forklift, Etc)
• On Call Field Repair
• Fabrication
• Welding & Machining
• Component Incoming Inspection
• Component receiving
• Component Delivery
• Tools Borrowing
• Measuring
• Part Recommendation / Part Ordering
Job Classification
1. General Overhaul 3. Component / Part Repair
– HE – Turbo
– DT – Water Pump
– Utility (Genset, Compressor, Water – Starting Motor
Pump, Etc) – Alternator
– Control Valve (Non Excavator)
2. Component Overhaul – Hydraulic Pump
– Engine – Hydraulic Cylinder
– Transmission – Bucket
– Differential – Blade
– Travel Device (Excavator) 4. Periodic Maintenance
– Swing Device (Excavator) - Periodic maintenance (LV, Genset,
– Compressor, Forklift, Etc)
Main Control Valve (Excavator)
– 5. Other Minor Repair
Main Pump (Excavator)
- Change & repair Tire LV
- Change brake pad LV
- Repair Fogging Machine
- Change Hose Forklift
- Etc
6. Fabrication