Beckton Upgrade The Challenge the client.

GEC also consult with the CA/CM for any discrepancies


- Maintenance Docklands Light Railway Limited (DLRL) intends to
procure replacement rolling stock for the Docklands Light
especially excessive hours being charged in a task
against the submitted forecast report and apply any
Facility Building Railway (DLR) to meet both projected growth in service
demand and to replace the existing B92 vehicles that are
adjustment as per feedback of the CA/CM.

(MFB) nearing end of their design life. Check that there are no duplication on timesheet records
or any non-chargeable items included
The replacement rolling stock will have operational and
maintenance requirements which are likely to be Hourly rates are also verified against the schedule of
considerably different to the existing DLR fleet. This will rates in the Contract Data part 2 for the named staff and
London, UK require the construction of new maintenance facilities at generic staff grade.
Beckton Depot to service and maintain the replacement
fleet.

GEC was tasked to do the interim valuation of the


​The Impact
contractor payment application and preparation of the
valuation documentation and submit to the client for their GEC’s undertaking the interim payment valuation process
review prior to issuance of interim certificate o payment provided the UK colleagues more time to focus on client
notice. facing aspect of delivery
Sector
GEC needs to review the application for any GEC’s systematic approach and technical capability
• Rail
discrepancies, non-conforming works, non-chargeable provided a high-quality output to the client thus gained
Client expenses and ensures that the hourly rate used is in their confidence and provided more future opportunities
• Transport for London accordance with the contract. to Arcadis.
Principal Contract
• Dockland Light Railway Limited The Solution GEC’s ability to provide dedicated resources to support
After receiving the payment application, GEC will do a UK team ensured familiarity with the scheme.
Project data
• Date: 2019 -Ongoing desktop check to ensure completeness of documents
and compliance with the standard templates​ provided by
Sample Timesheet Submission
Beckton
Upgrade -
Maintenance
Facility
Building (MFB)

London, UK

Sector
• Rail
Client
• Transport for London
Principal Contract
• Dockland Light Railway Limited
Project data
• Date: 2019 -Ongoing
Sample Payment Application
Beckton
Upgrade -
Maintenance
Facility
Building (MFB)

London, UK

Sector
• Rail
Client
• Transport for London
Principal Contract
• Dockland Light Railway Limited
Project data
• Date: 2019 -Ongoing
Sample Forecast Report

Beckton
Upgrade -
Maintenance
Facility
Building (MFB)

London, UK

Sector
• Rail
Client
• Transport for London
Principal Contract
• Dockland Light Railway Limited
Project data
• Date: 2019 -Ongoing