1. Power used during the production is 16 units per hours @ Rs 10 per unit. No current is taken during
maintenance or setting up time.
2. The machine require a chemical solution which is replaced at the end of each week at a cost of Rs.
2000 per week.
3. Cost of maintenance is Rs 50,000 per annum.
4. Two attendant control the operation of this machine with five other identical machines. Their combined
weekly wages amount to Rs. 1200 per week.
5. General work overheads allocated to this machine amount to Rs 20,000 per annum.
Q.10