KHALIFA
PROJECT
MANAGEMENT
OUR TEAM
Hassan Durrani
Muhammad Salman
Mubashir Zaman
Shahood Khan
Zarafshan Gul
CONTENTS
01 02 03 04
Introduction History Goals & Project Timeline
Objectives
05 06 07 08
Structural Maintenance Challenges & Conclusion
Breakdown Strategies
INTRODUCTION
• 2010
• SOM
• Burj Dubai
• Tallest building
• Sustainable Design
• Mixed-Use Development
Structural
Construction
(2004-2007) Testing &
Conceptualization &
Certification (2009-
Planning (2003-2004)
Height Milestones 2010)
(2007-2008)
Construction
Commencement Building Facade &
Opening (2010)
(2004) Interior Works (2008-
2009)
Structural Breakdown
• Three wings
• Independent entrance
• Residences, Corporate suites & Armani hotel
• Sky lobbies with gyms, swimming pool • 27 types of stones, each with
• 5 star standards are maintained
& Jacuzzis are on floor 43 & 76 different durability
e.g. aroma & cleaning
• Sky lobby 123 houses lounges for the • Identified one chemical for
• 300 people working under maintenance of all types.
residences & the corporate suites.
aesthetic maintenance chief
CHALLENGES
• C onst ruc t i on Ti m e l i ne
• C ost Ma na ge m e nt
STRATEGIES
• Risk Management
• Adaptability & Flexibility
• Quality Control & Assurance
CONCLUSION
• Record breaking height Efficient resource allocation & Project’s adherence to quality control
• Innovative use of materials utilization measures
&technologies
Vision & ambition of Dubai’s Effective stakeholder management
infrastructure
THANK YOU.