6
Root gap
dimension
HI-LO Single Purpose Welding Gauge
Internal
alignment
1) Use a pencil for the arrow lines, but make all written
comments and measurements in ink only
The report sketch used in SEA CWI exam will look like the
following example.
After you have completed your report sketch of your test plate
the next step is to complete your final report again the report must
be completed in ink (no pencil).
The report form used in SEA CWI will look like the following
example.
Arc Strike
Welding process:
WELD FACE
Signature:
98
140
12
40
8
C
A
60
20
90
15
10
46
Under fill Slag inclusion
5
Lack of side Undercut
Arc Strike
Spatter or scale on the pipe surface Spatter or scale on the pipe surface
Lack of side
Slag wall fusion
25
120
38
8
15
A
C
Cap height : 4mm. Weld width: 12-14mm Cap height : 5mm. Weld width: 12-14mm
Toe blend: Poor. Misalignment (HI-LO): 2mm Toe blend: Poor. Misalignment(HI-LO): 1mm
Spatter or scale on the pipe surface Spatter or scale on the pipe surface
140
40
6
8
C
A
180
60
20
90
10
15
46
Excess Poor stop start
5
Lack of root Undercut
penetration penetration
>1.0 mm 5mm Penetration height : 3mm.
Misalignment (HI-LO): 2mm
Penetration height : 5mm. Spatter on the pipe surface
NOTES:
Misalignment (HI-LO): 1mm
Scale on the pipe surface
Lack of root
fusion
38
8
D
A
C
120
120
Smooth Undercut
<1.0mm
Penetration height: 2mm. Penetration height: 3mm.
Misalignment (HI-LO): 2mm Misalignment (HI-LO): 1mm
Spatter on the pipe surface Scale on the pipe surface
SEA CWI Certified Welding Inspector
EXAMPLE WELD INSPECTION REPORT/SENTENCE SHEET
PRINT FULL NAME: Abdul Mukarim
SPECIMEN NUMBER PP002
EXTERNAL DEFECTS Defects Noted Code or Specification Reference
This *pipe/plate has been examined to the requirements of code/specification API 1104.................
and is accepted/rejected accordingly.
Comments:
* Request MPI testing.
** Recommend arc strikes are ground flush prior to MPI testing for cracks.
*** Radiography Required
Signature......................................................... Date.....................................................................................
*Delete which is not applicable. Use the other side for any comments.