You are on page 1of 6

SEIP for 080-V-001

Contents

General Section Unit Item No Name Ranking Installation Maker Government Compliance

2 080/SWS 080-V-001 Degassing Drum - 2015 Doosan Vietnam

Temperature(℃) Pressure(kpag) Material /Thickness(mm)


Shell &Head&Stack Boot&Head&Stack
Design Operation MPT Design Operation
Specification Material Thickness MAT Material Thickness MAT

SA516- SA516-
80 54.4 - 343 16 70N+HIC+Epox 24/22/15 13.2/18.7/NA 70N+HIC+Epoxy 24/22/15 13.2/18.7/NA
y Lining Lining
Type Related area Risk level History

Amnonium Bisulfide Corrosion; Shell / Head H


Damage Mechanism Sour Water Corrosion;
Wet H2S Damage
(Blistering/HIC/SOHIC/SSC) Boot H
Lining Damage

Area selection
Item Inspection area Method Purpose Inspection interval Volumn
Fixed point Point Remarks
Fouling,
Shell/Head VI
Lining,Corrosion
Every openning All - - DCSM
Inspection Criteria /
Method
Fouling,
Nozzle VI
Lining,Corrosion
Every openning All - - DCSM
Visual
Inspection Fouling,
Demister VT
Lining,Corrosion
Every openning All - - DCSM

Fouling,
Stack VT
Lining,Corrosion
Every openning Top sec - - DCSM

Defect Confirmation If necessary in case of epoxy lining was peeled off from metal.
NDE Weld WFMT
Crack
Every openning 25%
See Layout

Item Content

Damage History

Remarks
None Inspection Area

Others

Prepared by Review by Approved by


Horizontal Drum
080-V-001 Inspection Record

1. General Unit : 080/SWS


Item No : 080-V-001 Degassing Drum Inspection Date: / /2019

2. External inspection [Legend] G (good), R (not good), N (none)

Shell, Top head Platform Name Plate

Insulation Nozzles Steam tracing


Foundation Grounding Others

Remark

3. Internal inspection:

Area Part Result & finding Remark

North or East Head

Drum Shell

South or West Head

INTERNAL
SURFACE OF Shell of Water Leg (if
PRESSURE applicable)
VESSEL

Lower Head of Water


Leg(if applicable)

Nozzles

Small Connections

Inlet nozzle /
Distributor
Baffles, Screens,
Grids,
INTERNALS
Demister, Demister
Support

Vortex Breaker

Other Flange Face (if


open for inspection)

Thermowells
MISCELLANE
OUS Internal Coating or
Linings

Page 2
MISCELLANE
OUS

Other Pressure
Containing
Instruments

Others -

Remark

4. Thickness measurement:
Baseline
Part Part ID Method Nom. Th’k Act. Th’k Judgment Remark
Th'k
Top head

Shell

Shell

Nozzle AG

5. NDE
Part Detail Location Method Judgment Remark

Nozzle N7 RT

Nozzle N11 RT

7. Repair work

8. Recommendation

9. Attachment
1.  Inspection layout
2.  Photo record
3. SEIP

Recommended next opening :………. Prepared by Reviewed by Approved by

Purpose : ■ Cleaning, ■ Inspection

Page 3
1. Epoxy lining condition shall be checked at first. If lining was peeled off from metal, metal surface shall be checked by
VI with UTM for general corrosion or gage for pitting, if necessary. 2. Water injection point area in stack shall be checked
for corrosion. Note: Remove top pipe spool is required
3. All of the Internal parts should be inspected for deformation,corrosion

MT if lining peeled off found out : * CML of WFMT for <- For Defect confirmation, PT for welds
HIC/SSC to be set on Head welding line and M/H welding attache M1 & M2 with shell head without
line without scaffolding, however, If epoxy lining is broken scaffolding is recommended rather than top
by VI int, please cancel tentative CML and change CML at side of nozzles with scaffolding required.
the broken epoxy lining area

Surface preparation by buffing machine for


inside,just in case of lining damage found out by
visual inspection.

1. External Inspection

2. Internal Inspection
2.1 Fouling Condition

2.2 Corrosion

2.3 Internal Part Condition

3.Wall Thickness Measurement


3.1 Head

3.2 Shell

4. Repair Works

5. Recommendation
Photo Record of 080-V-001

1. Location

2. Result

1. Location

2. Result

1. Location

2. Result

You might also like