You are on page 1of 5

SEIP for 080-AC-001

Section Unit Item No Name Grade Installation Maker Government Compliance


General Stripper Overhead
2 080/SWS1 080-AC-001 Pumparound Cooler
- 2015 SK Vietnam

Temperature(℃) Pressure(Mpa ) Material/Thickness(mm)


Shell Side Tube Side Shell Side Tube Side Header Tube
TMT
Specification Operation Design Operation Design Operation Design Operation Design Material Nor MAT Material Nor MAT

N/A N/A 99.5/55.2 125/175 N/A N/A N/A 0.66/0.764 0.988 25/12 - SA789-Duplex 1.7 -

Type Related Area Possibility History Type Related Area Possibility Hisatory

3_Ammonium Bisulfide
Damage Mechanism Corrosion;
Tube High - - - - -
3_Chloride Stress
Corrosion Cracking

Area Selection
Item Area Method Purpose Frequency Volumn Remarks
Fixed Point Point

Header VI Fouling, Corrosion Every Opening All - -


DCSM
Inspection Visual Inspection
Method/Criteria Tube VI Fouling, Corrosion Every Opening All - -
DCSM

Estimation of tube DCSM


NDE Tube ECT Based on RBI *10% Total 36 tubes per one bundle. - -
useful life time Open all Plugs

History

Remarks

Prepared by Review by Approved by


080-AC-001(Stripper Overhead Pump Around Cooler)

1. General Unit : 080 / SWS


Name : Stripper Overhead Pump
Item No : 080-AC-001 Inspection Date :……...2019
Around Cooler

2. External Inspection [Legend] G (good), R (not good), N (none)

Structure bolt Louver Header Grounding

Tube Fin Anchor Bolt Name Plate

Remark

3. Internal Inspection [Legend] V (Severe), M (Moderate), S (Slight), N (Negligible)

Fouling
Part Part ID Status Cause Judgment Action
Degree Comp. Type

Front
Header
Rear

Tube Inside

Remark

4. Thickness Measurement (refer to the Lay-Out)

Part Part ID Method Nom Th’k(mm) Act Th’k(mm) Judgment Remain life Action

Header

Remark

5. Evaluation of Remaining Useful Life of Tube (refer to the Lay-Out)


Method Nom. thk'(mm) Ret. Th'k Act' th'k(mm) Remaining Life

1.7

Remark

6. NDE (Refer to attachment for details)


Part Part ID Method Judgment Part Part ID Method Judgment

- - - - - - -

- - - - - - -

Remark

7. Repair Work
Part Part ID Repair Work Details Reason Result

Remark

8. Recommendation

9. Attachment
1. Layout
2. Photo
3. SEIP
Recommended next opening : year Prepared by Reviewed by Approved by
Purpose : ■ Cleaning, ■ Inspection
Row Number ECT 36 tubes per bundle

Row No.1 06 tubes ECT

Row No.2 06 tubes ECT

Row No.3 06 tubes ECT

Row No.4 06 tubes ECT

Row No.5 06 tubes ECT

Row No.6 06 tubes ECT

*Tube Material: SA789 Duplex 1. Opening all Plugs


Stainless Steel 2. Jet Cleaning all 336 Tubes
* 36 tubes/bundle A check by ECT 3. Conduct 100% visual .
4. Conduct ECT 36 tubes per
bundle A

1. External Inspection
1.1
2. Internal Inspection
2.1 Fouling Condition

2.2 Corrosion
2.2.1 Tube inside
2.2.2 Header

4. Evaluation of Tube Remaining Useful Life

5. NDE Result

6. Repair Work

7. Recommendation
Photo Record of 080-AC-001

Location

Inspection Results

Location

Inspection Results

Location

Inspection Results

You might also like