Inspection Division HPCL-MR
Agenda
2
Inspection Division HPCL-MR
Background
DSS
Introduced for first time in HPCL MR in salt water service in Yr. 2008.
Many of the Duplex exchangers started failing within 6 months of
commissioning.
Total no of DSS exchangers :70
DSS Exchanger failure within 1 yr. of commissioning : 21
SDSS
Introduced for first time in salt water service in Yr. 2000 in DHDS.
Some of these super duplex exchangers failed within 4 of
commissioning.
Total no of SDSS exchangers : 18
SDSS Exchanger failure : 3
3
Inspection Division HPCL-MR
Material Details
4
Inspection Division HPCL-MR
Observations DSS
5
Inspection Division HPCL-MR
Observations DSS Contd…
6
Inspection Division HPCL-MR
Observations DSS Contd…
7
Inspection Division HPCL-MR
Observations DSS Contd…
8
Inspection Division HPCL-MR
Observations DSS Contd…
9
Inspection Division HPCL-MR
Observations SDSS
10
Inspection Division HPCL-MR
Observations SDSS Contd…
11
Inspection Division HPCL-MR
Observations SDSS
12
Inspection Division HPCL-MR
Observations SDSS Contd…
13
Inspection Division HPCL-MR
Investigations DSS
PMI & Microstructure examination
Chemical composition of Tubes, tube sheet
and HAZ found OK
Tube Microstructure found OK
Tube sheet Microstructure found OK
Weld and HAZ :Microstructure found OK
14
Inspection Division HPCL-MR
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Shell Geometry Input
15
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Bundle Details Input
16
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Tube Skin Temperature Results
17
Investigations SDSS
18
Inspection Division HPCL-MR
Limitations of DSS & SDSS
CPT of SDSS is 75o C & CCT is 50o C. Silt and non smooth weld
finish can lead to deposition and aggravate crevice corrosion.
19
Inspection Division HPCL-MR
Microstructure of Tube of Tube
Sheet Weld
21
Inspection Division HPCL-MR
Failure Mechanism of Seal
Weld in SDSS
22
Inspection Division HPCL-MR
Importance of Nitrogen
23
Inspection Division HPCL-MR
Repairs
24
Inspection Division HPCL-MR
Way Forward
Design Stage
25
Inspection Division HPCL-MR
Way Forward Contd..
Fabrication Stage
26
Inspection Division HPCL-MR
Way Forward Contd..
Operational Stage
27
Inspection Division HPCL-MR
THANK YOU
28
Inspection Division HPCL-MR
List of Failed Exchangers
S. No Equipment No. MOC Commissioning Failure Type of
Date Date Failure
1. 102-E-2009A/B DSS Aug’09 Sept’09 Tube
leak, FTS
grooving
2. 102-E-4090B DSS Sept’09 June’11 Tube
leak,
Channel
Barrel
grooving
3. 103-E-2018 B DSS Nov’09 Aug’10 Tube
leak
4 103-E-2014 B DSS Nov’09 Dec’10 Tube
leak
5 103-E-2010 C/D DSS Nov’09 Dec’10 Tube
leak
6. 103-E-2001 B DSS Nov’09 Dec’10 Tube End
corrosion
29 Erosion
7. 103-E-2017 B DSS Nov’09 Dec’10
Inspection Tube
Division HPCL-MR
List of Failed Exchangers
S. No Equipment No. MOC Commissioning Failure Type of
Date Date Failure
9. 103-E-2006 B DSS Nov’09 Mar’10 Tube leak
31
Inspection Division HPCL-MR
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Baffle Input
32
Inspection Division HPCL-MR
33
Inspection Division HPCL-MR