Duplex and Super Duplex

Stainless Steel Failures


In Heat Exchangers

1
Inspection Division HPCL-MR
Agenda

2
Inspection Division HPCL-MR
Background
DSS
Introduced for first time in HPCL MR in salt water service in Yr. 2008.
Many of the Duplex exchangers started failing within 6 months of
commissioning.
Total no of DSS exchangers :70
DSS Exchanger failure within 1 yr. of commissioning : 21

SDSS
 Introduced for first time in salt water service in Yr. 2000 in DHDS.
Some of these super duplex exchangers failed within 4 of
commissioning.
Total no of SDSS exchangers : 18
SDSS Exchanger failure : 3
3
Inspection Division HPCL-MR
Material Details

4
Inspection Division HPCL-MR
Observations DSS

Corrosion at seal weld and HAZ.


Pitting at tube edges
Pin hole and Pitting at tube ID
Crevice corrosion of tube sheet near gasket
seating surface.

5
Inspection Division HPCL-MR
Observations DSS Contd…

6
Inspection Division HPCL-MR
Observations DSS Contd…

7
Inspection Division HPCL-MR
Observations DSS Contd…

8
Inspection Division HPCL-MR
Observations DSS Contd…

9
Inspection Division HPCL-MR
Observations SDSS

Seal weld corrosion.

Crevice corrosion near gasket seating surface


area which was covered under silt

10
Inspection Division HPCL-MR
Observations SDSS Contd…

11
Inspection Division HPCL-MR
Observations SDSS

12
Inspection Division HPCL-MR
Observations SDSS Contd…

13
Inspection Division HPCL-MR
Investigations DSS
PMI & Microstructure examination
Chemical composition of Tubes, tube sheet
and HAZ found OK
Tube Microstructure found OK
Tube sheet Microstructure found OK
Weld and HAZ :Microstructure found OK

14
Inspection Division HPCL-MR
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Shell Geometry Input

15
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Bundle Details Input

16
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Tube Skin Temperature Results

17
Investigations SDSS

PMI & Microstructure examination

Chemical composition of Tubes, tube sheet and HAZ found OK


Tube Microstructure found OK
Tube sheet Microstructure found OK
Weld and HAZ : ABNORMAL FERRITE CONTENT

18
Inspection Division HPCL-MR
Limitations of DSS & SDSS

CPT of DSS is 45o C & CCT is 20o C . If operating window is close to


this the material is prone to pitting & crevice corrosion.

CPT of SDSS is 75o C & CCT is 50o C. Silt and non smooth weld
finish can lead to deposition and aggravate crevice corrosion.

If proper welding procedure is not followed it leads to formation


of too high ferrite level and loss of nitrogen thereby poor PRE
level and reduction in corrosion resistance.

19
Inspection Division HPCL-MR
Microstructure of Tube of Tube
Sheet Weld

Healthy Microstructure Contaminated Microstructure of SDSS

Typical Super Duplex Microstructure - 50% Ferrite + 50% Austenite


20
Inspection Division HPCL-MR
Root Cause

21
Inspection Division HPCL-MR
Failure Mechanism of Seal
Weld in SDSS

22
Inspection Division HPCL-MR
Importance of Nitrogen

23
Inspection Division HPCL-MR
Repairs

Tube to tube sheet weld joints re-welded at affected locations using


Argon + 2% nitrogen as shielding gas
Weld build up done at affected gasket faces and surrounding locations
using same shielding gas and machined to original dimensions
QAP included a post weld ferrite count examination and
metallography
Metal gasket was selected to be of a grade with similar corrosion
resistance as DSS and SDSS

24
Inspection Division HPCL-MR
Way Forward

Design Stage

Selection of material of construction for exchanger tube should


be based on the Tube skin Metal Temperature.

Where hydrogen is not present in the stream use of conventional


metallurgy eg. CuNi / Ti should be preferred.

In case of hydrogen being present in the process stream where


CuNi / Ti is not suitable, bare minimum SDSS should be used. For
higher tube film temperatures HDSS may be considered

25
Inspection Division HPCL-MR
Way Forward Contd..

Fabrication Stage

Adding 2% nitrogen to the shielding gas during tube-to-tube sheet


joining is an effective method of reforming austenite despite the
high cooling rates typical of this type of Welding.

The PQR/QAP must include a ferrite count and microstructure


examination.

Overlay weld of gasket area on tube sheet with Alloy 69 may be


considered.

26
Inspection Division HPCL-MR
Way Forward Contd..

Operational Stage

Incoming seawater should be filtered in order to remove debris,


sand and silt, which may compromise the performance of passive
materials, which perform best when the surfaces are clean.

If it is considered that the material is performing too close to the


limits of its operating window, a “belt and braces” approach can
be taken by fitting mild steel or iron sacrificial anodes into the
channel heads. These should be inspected and replaced at each
turnaround.

27
Inspection Division HPCL-MR
THANK YOU

28
Inspection Division HPCL-MR
List of Failed Exchangers
S. No Equipment No. MOC Commissioning Failure Type of
Date Date Failure
1. 102-E-2009A/B DSS Aug’09 Sept’09 Tube
leak, FTS
grooving
2. 102-E-4090B DSS Sept’09 June’11 Tube
leak,
Channel
Barrel
grooving
3. 103-E-2018 B DSS Nov’09 Aug’10 Tube
leak
4 103-E-2014 B DSS Nov’09 Dec’10 Tube
leak
5 103-E-2010 C/D DSS Nov’09 Dec’10 Tube
leak
6. 103-E-2001 B DSS Nov’09 Dec’10 Tube End
corrosion
29 Erosion
7. 103-E-2017 B DSS Nov’09 Dec’10
Inspection Tube
Division HPCL-MR
List of Failed Exchangers
S. No Equipment No. MOC Commissioning Failure Type of
Date Date Failure
9. 103-E-2006 B DSS Nov’09 Mar’10 Tube leak

10. 103-E-2017 A DSS Nov’09 May’10 Tube leak

11 31E37 DSS May’10 July’11 Tube leak


12 31E38 DSS May’10 July’11 Tube leak
13 114E3057D DSS Feb’11 Nov’11 Tube leak
14 114E3057C DSS Feb’11 Nov’11 Tube leak
15 14E24C DSS May’10 Dec’11 Tube leak
16 14E24C DSS May’10 Dec’11 Tube leak
17 14E24C DSS May’10 Dec’11 Tube leak
18 DSS April’10 Tube leak
99-E-19 A Nov’11
19 DSS April’10
30 Tube leak
99-E-20 A Sept’11
Inspection Division HPCL-MR
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Nozzle Input

31
Inspection Division HPCL-MR
Investigations DSS
HYSIS Calculations on Tube Skin Metal Temperature
Baffle Input

32
Inspection Division HPCL-MR
33
Inspection Division HPCL-MR

You might also like