WORK STEP
1. ERECT MOBILE SCAFFOLD TO ACCESS TO ROOF SLAB
AREA
2. HOOK 1.8M LANYARD TO SCAFFOLD AND MOVE TO
THE INSTALLED WIRE ROPE
3. UNHOOK THE LANYARD FROM THE SCAFFOLD AND
HOOK 1.8M LANYARD TO THE LIFE LINE TO INSTALL
KLIP LOCK
4. INSTALL KLIP LOCK FOR THE FIRST ROOFING SHEET
5. BY USING 1.8M LANYARD, CONTINUE INSTALLATION OF
ROOFING SHEET BY SEQUENCE UNTIL THE LAST SHEET
6. USING THE SAME METHOD, CONTINUE INSTALLATION
CAPPING, FLUSHING ETC.
LEGEND
×=Lifeline Anchor (1.8m from canopy edge)
Mobile Aluminium Scaffold (Ingress &
Roofing Sheet Storage Area
Egress)
X5 X4 X3
X6 X7
X10 X8
X9