Legend:

Direction of Purlin installation Skylift Parking Skylift Parking


Zone Zone

Skylift parking zone

Skylift Parking
Phase 2 Phase 1 Skylift Parking
Zone Zone
WORK STEP
1. ERECT MOBILE SCAFFOLD TO ACCESS TO ROOF SLAB
AREA
2. HOOK 1.8M LANYARD TO SCAFFOLD AND MOVE TO
THE INSTALLED WIRE ROPE
3. UNHOOK THE LANYARD FROM THE SCAFFOLD AND
HOOK 1.8M LANYARD TO THE LIFE LINE TO INSTALL
KLIP LOCK
4. INSTALL KLIP LOCK FOR THE FIRST ROOFING SHEET
5. BY USING 1.8M LANYARD, CONTINUE INSTALLATION OF
ROOFING SHEET BY SEQUENCE UNTIL THE LAST SHEET
6. USING THE SAME METHOD, CONTINUE INSTALLATION
CAPPING, FLUSHING ETC.

LEGEND
×=Lifeline Anchor (1.8m from canopy edge)
Mobile Aluminium Scaffold (Ingress &
Roofing Sheet Storage Area
Egress)

Wire Rope Direction of Roofing Sheet Installation


LEGEND WORK STEP
Access Ladder 1. ERECT ACCESS LADDER TO ACCESS TO TOP CANOPY
2. HOOK 1.8M DOUBLE LANYARD TO THE INSTALLED
LIFELINE
Roofing Sheet Storage Area 3. PLACE 1 SHEET OF METALDECK ROOF SHEET AS
TEMPORARY BRIDGE TO TRAVEL FROM ACCES LADDER
Direction of Roofing Sheet TO THE OTHER END
ANCHOR POINT 4. MAXIMUM 2 WORKER INSTALLED THE KLIP LOCK AND
Installation ROOFING SHEET AND ENSURE 100% TIE OFF TO THE
OBSTRUCTING INSTALLED LIFE LINE
Welded Anchor Post And ROOFING SHEET
Life Line (Refer Endorsed 5. INSTALL KLIP LOCK AND ROOF SHEET AS PER
INSTALLATION DIRECTION GIVEN
Drawing) 6. PLACE ROOF SHEET AS TEMPORARY BRIDGE TO
TRAVEL ON PURLIN
Metal deck Roof Sheet 7. CONTINUE ROOFING SHEET INSTALLATION AND
ENSURE TO HOOK THE 1.8M DOUBLE LANYARD TO THE
INSTALLED LIFE LINE
8. AT THE ANCHOR POINT WHICH OBSTRUCTING THE
ROOFING SHEET INSTALLATION, ENSURE TO HOOK THE
LANYARD TO THE LIFE LINE WHICH NOT AFFECTED
DURING ANCHOR POINT REMOVAL
9. SLOWLY REMOVE THE ANCHOR POINT AND MAKE
NECESSARY TOUCH UP WORK BEFORE CONTINUE THE
ROOF INSTALLATION
10. CONTINUE ROOFING SHEET INSTALLATION TO THE
LAST AREA
X1 X2

X5 X4 X3

X6 X7

X10 X8
X9

DIAGRAM 1