POINT IS LOWER THAN THE GROUND THE STRAW ROLLS MAY NOT FIBRE ROLLS: TYPICALLY 200 TO 250mm LEVEL AT EITHER END OF THE ROLL. NECESSARILY NEED TO BE REMOVED JUTE, COIR OR STRAW ROLL TIED WITH FROM THE SITE. SYNTHETIC OR BIODEGRADABLE MESH. 6. ENSURE THE ANCHORING STAKES ARE DRIVEN INTO THE END OF EACH ROLL 4. ALL SYNTHETIC (PLASTIC) MESH OR STAKES: MINIMUM 25 x 25mm TIMBER AND ALONG THE LENGTH OF EACH ROLL OTHER NON READILY BIODEGRADABLE STAKES. AT A SPACING NOT EXCEEDING 1.2m OR MATERIAL MUST BE REMOVED FROM THE SIX TIMES THE ROLL DIAMETER, SITE ONCE THE SLOPE OR DRAIN IS INSTALLATION WHICHEVER IS THE LESSER. A MAXIMUM STABILISED, OR THE ROLLS HAVE STAKE SPACING OF 0.3m APPLIES WHEN DETERIORATED TO A POINT WHERE THEY 1. REFER TO APPROVED PLANS FOR USED TO FORM CHECK DAMS. ARE NO LONGER PROVIDING THEIR LOCATION AND INSTALLATION DETAILS. INTENDED DRAINAGE OR SEDIMENT IF THERE ARE QUESTIONS OR PROBLEMS 7. ADJOINING ROLL MUST BE OVERLAP AT CONTROL FUNCTION. WITH THE LOCATION, DIMENSIONS OR LEAST 450mm, NOT ABUTTED. METHOD OF INSTALLATION CONTACT THE ENGINEER OR RESPONSIBLE ON-SITE MAINTENANCE OFFICER FOR ASSISTANCE. 1. INSPECT ALL FIBRE ROLLS PRIOR TO 2. WHEN PLACED ACROSS FORECAST RAIN, DAILY DURING NON-VEGETATED OR NEWLY SEEDED EXTENDED PERIODS OF RAINFALL, SLOPES, THE ROLLS MUST BE PLACED AFTER SIGNIFICANT RUNOFF ALONG THE CONTOUR. PRODUCING STORMS OR OTHERWISE AT WEEKLY INTERVALS. 3. IF PLACED ON OPEN OR LOOSE SOIL, ENSURE THE FIBRE ROLLS ARE 2. REPAIR OR REPLACE DAMAGED FIBRE TRENCHED 75 TO 125mm IN SANDY SOILS ROLLS. AND 50 TO 75mm IN CLAYEY SOILS. Collected sediment 3. REMOVE COLLECTED SEDIMENT AND 4. ENSURE THE OUTER MOST ENDS OF DISPOSE OF IN A SUITABLE MANNER Fibre rolls recessed THE FIBRE ROLL ARE TURNED UP THE THAT WILL NOT CAUSE AN EROSION OR 50 to 75 mm in clayey soils, SLOPE TO ALLOW WATER TO POLLUTION HAZARD. or 75 to 125 mm in sandy soils ADEQUATELY POND UP-SLOPE OF THE ROLL, AND TO MINIMISE FLOW REMOVAL BYPASSING. 1. ALL EXCESSIVE SEDIMENT TRAPPED 5. WHEN PLACED ACROSS THE INVERT BY THE ROLLS MUST BE REMOVED FROM OF MINOR DRAINS, ENSURE THE SOCKS THE DRAIN OR SLOPE IF SUCH SEDIMENT ARE PLACED SUCH THAT: IS LIKELY TO BE WASHED AWAY BY EXPECTED FLOWS. (i) THE CREST OF THE DOWNSTREAM Catchments & Creeks Pty Ltd
ROLL IS LEVEL WITH THE CHANNEL
2. DISPOSE OF COLLECTED SEDIMENT IN INVERT AT THE IMMEDIATE UPSTREAM SOCK (IF ANY); A SUITABLE MANNER THAT WILL NOT Figure 1 - Typical installation of fibre rolls CAUSE AN EROSION OR POLLUTION (ii) EACH ROLL EXTENDS UP THE HAZARD. Drawn: Date: CHANNEL BANKS SUCH THAT THE CREST GMW Apr-10 Fibre Rolls FR-01