REQUIRED SPACE:-
NEVER
EVER PUT HAND ON LAPPED SEAL FACES OR DO NOT PUT LAPPED SEAL FACE
DOWN ON THE GROUND/FLOOR.
STORAGE NOTE :
INSTALLATION
1. CHECK THE SHAFT O.D.,
O.D. STUFFING BOX BORE/SPIGOT,BOLT SIZE, P.C.D.
P.C.D., AND
NO.LENGTH AVAILBLE TO ENSURE DIMENSIONS AGREE WITH SEAL ASSEMBLY
DRG.(IF PROVIDED.)
2. INSTALL SLEEVE ON SHAFT.
3. SCREW THE IMPELLER TO HOLD THE SLEEVE IN PROPER POSITION SECURELY
ON SHAFT.
4. SCRIBE A MARK ON SLEEVE THAT LINE UP WITH FACE OF ST
STUFFING
UFFING BOX AS
SHOWN IN FIGURE-1.
1.
5. REMOVE STUFFING BOX PLATE.
6. ENSURE GASKET & STATIONARY WITH PACKING
PACKING IS FITTED ON GLAND PLATE
7. MEASURE DIMENSIONS ‘A’ AS SHOWN IN FIGURE
FIGURE-2.
8. MEASURE FREE LENGTH ’X’ OF ROTARY UNIT.
9. NOW,
W, TO SET SEAL IN STUFFING BOX SCRIBE MARK ON SLEEVE AS MARK
MARK-2 AS
SHOWN IN FIGURE-2.
2.
10. BE CERTAIN TO HAVE ALL GASKET /GRUB SCREW /HARDWARES IN SEAL
CHAMBER BEFORE DETERMINING THIS LOCATION.
11. TIGHTEN THE ROTARY UNIT TO ITS WORKING LENGTH WITH THE HELP OF SEAL
ASSLY DRG .
12. THEN BOLT STUFFING BOX PLATE TO THE PUMP FRAME.
13. INSTALL IMPELLER & SCREW ON THE SHAFT.
SHAF
14. COMPRESS GLAND PLATE AGAINST STUFFING BOX, CHECK THE SEAL
COMPRESSION BY GAP BETWEEN GLAND GASKET & STUFFING BOX FACE.
15. TIGHTEN THE GLAND PLATE STUDS EVENLY.
EQUP. START UP
1. OBSERVE THE EQUIPMENT AND ENSURE ALL THE ASSEMBLY DONE PROPERLY.
2. PROVIDE
OVIDE QUENCHING OR FLUSHING LINES
ES AND STARTS QUENCHING FLUIDS IN
THE SEAL CAVITY.(IF
(IF APPLICABLE)
3. ROTATE SHAFT MANUALLY BEFORE SHART UP.
4. ENSURE THE SEAL ROTATES SMOOTHLY AN
AND THEN STARTS THE PUMP.
PUMP