PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY

Establishment of WAPDA Hydraulic Research and Training


Institute (WHR & TI) at Chicho Ki Mallian, Sheikhupura
INTRODUCTION
• As WAPDA water wing is involved in planning & designing and execution of irrigation,
drainage, water supply, storage dams and hydropower projects; which often require
confirmation of hydraulic design parameters and observance of behavior of hydraulic
structures in actual flowing condition through physical models.
• Physical models as per requirements of various Wapda projects are
prepared/maintained at irrigation research institute (IRI), near Nandipur Gujranwala;
which was established in mid-fifties and is under administrative control of irrigation
department, government of Punjab.
• A Memorandum of Understanding (MOU) was signed between Wapda and Irrigation
department Government of Punjab in late 1983. According to clause-1 of MOU Chief
Engineer, Irrigation, Research Zone, Govt. of the Punjab was designated as project
director, WAPDA model studies cell and given all financial and administrative powers
equivalent to the chief engineer in WAPDA
LIST OF PHYSICAL MODELS MAINTAINED AT IRRIGATION
RESEARCH INSTITUTE (IRI), NANDIPUR

Sr. Project Name Model Name Scale


1 Comprehensive Model 1:80
2 Sectional Model Of Spillway 1:50
3 Sectional Model Of Low Level 1:40
Dasu Hydropower Project Outlet
Sectional Model Of Spillway 1:20
4 (Aeration Study)
5 Spillway Model 1:60
Mohmand Dam Hydropower
6 Project Low Level & Flushing Outlet 1:40
LIST OF RECENTLY COMPLETED PHYSICAL MODELS AT
IRRIGATION RESEARCH INSTITUTE (IRI), NANDIPUR

Sr. Project Name Model name Scale


1 Sectional model of main spillway 1:40
Nai Gaj dam project
2 Sectional model of auxiliary spillway 1:40
3 Winder dam project Comprehensive Model 1:50
4 Tarbella 5th extension
hydropower project Comprehensive Model 1:50

5 Siri toi dam project, Govt.


of Balouchistan Comprehensive Model 1:50
6 Naulong Dam project Comprehensive Model 1:50
LIST OF UNDER TESTING AND UNDER CONSTRUCTION PHYSICAL
MODELS AT IRRIGATION RESEARCH INSTITUTE (IRI), NANDIPUR
Sr. Project Name Model name Scale Remarks
1 Under
Mangi dam project Comprehensive Model 1:50 construction
2 Diamer Basha dam Under
project Diversion model 1:80 construction
3 Under
Murunj Dam project Comprehensive Model 1:50 construction
4 Under
Gish kaur dam project Comprehensive Model 1:50 construction
5 Chashma right bank
canal (lift-cum gravity ) Comprehensive Model 1:30 Under
project modification
6
Jabba dam project Sectional model of spillway 1:40 Under testing
LIST OF UPCOMING PHYSICAL MODELS AT IRRIGATION
RESEARCH INSTITUTE (IRI), NANDIPUR
Sr. Project Name Model Name
1 Mangi dam project, Govt of Balochistan Sectional model

2 Sorra dam project, Govt of Punjab Sectional model of ungated


spillway
3 Sanam dam project, Govt of Balochistan Comprehensive Model
4 Chinnot dam project Comprehensive Model
Gazi barrage bridge model, Govt. of
5 Punjab Physical hydraulic study
6 Panjgur dam Project, Govt of Balochistan Comprehensive Model
7 Mohmand Dam Hydropower Project Aeration Study
ISSUES BEING FACED BY WAPDA MODEL STUDIES CELL (WMSC) AT
IRRIGATION RESEARCH INSTITUTE (IRI), NANDIPUR

• Problems in Administrative Approvals and Financial Disbursements.

• Uncertain Variations of rent for model construction and maintenance of models

to be paid to irrigation department Govt of the Punjab.

• Shortage of space/Trays for construction of new models


WAPDA HYDRUALIC RESEARCH AND TRAINING INSTITUTE
(WHR & TI) WAPDA AT CHICHO KI MALLIAN,
SHEIKHUPURA
• The establishment of WAPDA Hydraulic Research and Training Institute (WHR
& TI) is, therefore, crucial for addressing such challenges.

• Chicho Ki Mallian Hydropower Plant is a Low Head Hydroelectric Station


(13.2 MW), on Upper Chenab Canal (UCC) located near Sheikhupura, about
35 km north west of Lahore,

• 52 acres land is available at Chicho Ki Malian Hydropower Plant, with off


taking distributary from right side of UCC consisting of 2 No. 8 ft wide gates.

• At Chicho Ki Malian similar conditions are available as that of Nandipur for


establishment of Hydraulic Research Station.
LOCATION MAP OF WMSC AT CHICHO-KI-MALIAN
PROJECT AREA
PLAN FOR WHR & TI CHICO-KI-MALLIAN
PLAN FOR WHR & TI AT CHICHO KI MALLIAN

Chicho Ki Distributary off takes from UCC has a drop of 10 ft to be utilized to


operate physical models.
The proposed plan includes:
 12 No Trays for Model Testing
 Network of feeding channels for a discharges of 100 cusecs
 An escape channel to carry the water back into the supply channel
 Other infrastructure such as Workshop, Instrumentation Section,
Computer Cell, Offices, Residences, Rest House, Library, Store etc.
LAYOUT OF PROPOSED WHR & TI CHICHO KI MALLIAN
WORKS TO BE CARRIED OUT (PHASE-I & PHASE-II)
Phase – I:

I. Establishment of Physical Hydraulic Models Construction Facility for Research and


Testing. Trays for construction and model testing. Construction of Feeder channels,
canal falls, cross regulators, huts, bridges, outlets and inlets.

Phase – II

II. Establishment of International Modelling Research and Training Institute (IMRTI)


including Geotech and Computer lab in Institute.

III. Construction of library / record room

IV. Construction of rest house and officers/ staff colony and hostel.

V. Construction of Office Building and Residences

VI. Construction of Modern Workshop Facility.


FINANCIAL LAYOUT (PHASE-I & PHASE-II)
Phase-I
Item Amount (PKR)
Construction of hydraulic Research Center, Office building, 221,967,976
Construction of Workshop building, instruments and Residences
Hiring of Consultancy Services for Detailed Engineering Design, 44,393,595
Preparation of Tender Documents and Construction Supervision
266,361,571
Total (Phase-I)

Phase-II
Construction Cost (Institute & library, Library items, Softwares) 366,051,250
Construction of Residencies/Hostels/Roads/Mosque/ Shops 961,820,931
Total (Phase-II) 1,327,872,181
ISSUES BEING FACED BY WAPDA MODEL STUDIES CELL (WMSC) AT
IRRIGATION RESEARCH INSTITUTE (IRI), NANDIPUR

• Chairman WAPDA in a meeting directed to use own resources to proceed with

the Project.

• For the construction of essential activities of hydraulic research center under

Phase-I including the construction of 12 trays for model testing, a network of

feeding channels for discharges of 100 cusecs, an escape channel and other

necessary infrastructure, initially tentative amount of Rs. 25 million is required.


PROPOSAL TO BE SOLICITED
Keeping in view the importance of establishment of Model Study Cell at Chichoki
Mallian and consequent upon the directions of Chairman WAPDA to use own
resources

a. Initially utilize the available profit / interest amounting to Rs. 9,461,929/-


earned on the bank accounts of GM (Hydro) Planning to fund the above said
essential activities of WHR & TI. This allocation will facilitate the
commencement of essential activities without delay

b. Utilization of future profit / interest to be earned on the bank accounts of GM


(Hydro) Planning to fund the gaps till the completion of essential activities of
WHR & TI.
BREAKDOWN OF COST ESTIMATE
Tentative Cost Estimate (Phase-I)
Sr. No Item Amount (PKR)
1 Estimate for Construction of Hydraulic Research Center 75,616,996

3 Office Building 77,467,500

4 Construction of Workshop Buildings and Instruments 40,613,480

5 Residencies (2 No.) 28,270,000

6 Consultancy cost 44,393,595

Total (Phase-I) 266,361,571

Year-wise Phasing of Phase-I


Amount required for hiring of Consultancy Services for Detailed Engineering
Year I 44,393,595
Design, Preparation of Tender Documents and Construction Supervision
Construction of hydraulic Research Center, Office building, Construction of
Year II 221,967,976
Workshop building, instruments and Residences
BREAKDOWN OF INITIAL COST ESTIMATE FOR CONSTRUCTION OF HYDRAULIC RESEARCH CENTER

Initially Rs. 25 Million are required for Construction of Hydraulic research center the breakdown of which
is given below

Tentative Cost Estimate (Phase-I)


ITEMS Amount (PKR)
Clearing and Grubbing 383,386.48
Excavation/Filling of Feeder/Escape Canal 4,613,639.39
Head Regulator (1 No) 2,290,548.92
Canal Falls (02 Nos.) 1,693,070.93
Cross Regulators (02 Nos.) 2,057,617.78
Huts (4Nos.) used as stores 1,123,729.91
Bridges (02.Nos) 1,684,860.75
Outlets and inlets 3,343,174.97
Sub-Total-1 17,190,029
Contingencies 515,700.87
Sub- Total-2 17,705,730
Inflation on WSCR @40 % 7,082,292.00
Total 24,788,022

Say RS.25 MILLION


WAYFORWARD

a. Approval for utilization of available and future profit from bank accounts of
O/O GM(HP) for Phase-I activities

b. Establishment of Project directorate with appointment of Project Director


within Hydroplanning for performing aforesaid activities