You are on page 1of 8

SUPPLY

CHAIN
FINAL PROJECT QUESTIONS

LECTURER:DR MOHD LUTFI

PREPARED BY:
SASHMITA
Shortages of production capacity to
cope with high demand of Gardenya
White Sandwich Bread during the PKP
period in 2020. During the PKP, the
demand for Gardenya Sandwich bread
increased to 350,000 packs
performance day which the factory has

ISSUE 1 run at its full capacity 200,000 packs


performance day with two production
lines. The SC manager has been
instructed to conduct a “make or buy
analysis”, to find three suppliers in
Malaysia and to conduct “supplier
QUESTION selection analysis” in order to solve this
problem. (10 marks)
ANSWE
R
• Compare Potential Suppliers

• Quality, Cost, and Delivery (QCD)

• Long-Term Relationship
ISSUE 2: QUESTION
Shortages of wheat flour from Russia due to Russia – Ukraine war in 2022 which affects the
supply of raw material to produce bread in Gardenya factory. The average consumption of wheat
flour by Gardenya factory is 200 tons per month which 80% of the supply is from Russia. Other
major producer of wheat flour is United States of America but the cost price is triple than the
price purchase from Russia due to Ringgit Malaysia currency value has dropped substantially in
the past few months. Hence, the SC manager has been instructed to conduct a “Sourcing
Strategy” analysis and come out with remedial measures to solve this problem on short term and
long term basis. (10 marks)

Back to Agenda Page


ANSWER • Right Outsourcing Partner

• Request for Supplier Information and


Identification of Selection Criteria

• Implementation of Supplier Relationship


Management (SRM)
targeted to produce for the
first three months is only 5000
cartons per month. Whereas
ISSUE 3:QUESTION the minimum production
capacity to run production of
cup mee is minimum 20,000
cartons performance month.
Currently Gardenya factory
has no machine to produce
cup noodle production and
considering to purchase and
install a new line to produce
Nimee Cup Noodle. The SC
manager has been instructed
to conduct a “make or buy
analysis”, to find three
suppliers in Malaysia and to
conduct “supplier selection
analysis” in order to solve this
problem. (10 marks)
ANSWER
• Evaluating Offers

• Operational Capacity
Analysis

• Technical Capability
Determination
THANK YOU FOR
LISTENING