Professional Documents
Culture Documents
Er.M.Elangovan, ME
Deputy Director, Retd.
Soils Lab, Highway Research Station
GEOFIBRES TYPE
GEO FIBRES
NON-WOVEN
NATURAL FIBRES
a) Coir Net
b) Coir Composite
c) Jute Fibres
SYNTHETIC FIBRES
a) Polyester
b) Polyethylene
c) Poly propylene
a) Reinforcement
b) Separation
c) Filtration
d) Drainage
Reinforcement Function
4
3
Compressive Stress
5
2
4
3 1) Subgrade,
Compressive Stress 2) GSB,
2 3) WMM,
4) Surfacing,
Rainwater Geosynthetic
5) ---Geo Grid
Non-woven
Reinforcement
Capillary Water
1
SEPERATION/FILTRATION
4
1) Subgrade,
3 2) GSB,
Compressive Stress 3) WMM,
2 4) Surfacing,
GSB FINES
5) ---Non-Woven
Geosynthetic
Non-woven
Geosynthetic
1 SUBGRADE
Reinforcement Embankment
4
3
Compressive Stress
2
1 5
Facing
Embankment
Soil
Foundation
Reinforcement Layers
OTHER APPLICATIONS
1) Aggregate Drain
2) Vertical Drain
3) Band Drain
GEO COMPOSITES
17
Vertical Drain in Villupuram Town in NH45 A
Cross section of Vertical drain
18
19
VERTICAL AND HORIZONTAL DRAIN IN VILLUPURAM TOWN
THE NATURAL SOIL IN THE AREA COARSE SAND FROM 1.0M BELOW, EXTENDING MORE THAN 8.0M
ENTIRE PIPES WRAPPED WITH NON WOVEN GEO SYNTHETIC AND STITCHED
TOP AND BOTTOM COVERED WITH SAME GEOSYNTHETICS TO PREVENT CLOGGING OF PIPE
HORIZONTAL AGGREGATE DRAIN PROVIDED FOR QUICK TRAINING AND PREVENT FLOODING
TOP OF AGGREGATE DRAIN FILLED WITH SAND AGGREGATE ID FOR VEHICLES TO USE FREELY
END OF TRAIN CONNECTED TO VERTICAL DRAIN CHAMBER WITH PVC PIPE PLACED HORIZONTALLY
COMPLETED IN 1997
FUNCTIONS EFFECTIVELY
NOTE:
III. WATER JET USED TO CLEAN FABRIC AND AGGREGATE FOR INCREASING EFFICIENCY
Cover slab for the chamber with vertical drains
23
THERODUM VEETHI IN THIRUVERKADU
24
THERODUM VEETHI - THIRUVERKADU
EXISTING ROAD
DISCHARGING TO
THE LANDSCAPE OF SLOPING FROM THE IRRIGATION BANK TOWARDS SINGAPERUMAL KOIL SIDE
WATER FROM IRRIGATION TANKS SEEPING TO SUBGRADE TOP WITH WATER STANDING UP
TO GSB LEVEL
FOREST LAND SIDE ALSO WATER SEEPING DUE TO CUTTING AND THE SOIL PERMEABLE
DAIMLER TEST TRACK FOR HEAVY
VEHICLES AT ORAGADAM
SOLUTIONS:
TANK SIDE: THE ROAD LEVEL WAS RAISED ABOVE GROUND LEVEL.
THE SUB GRADE LEVEL RISE ABOVE GROUND LEVEL THE SUBWAYS LEVEL
ON ENTIRE TANK SIDE AND FOREST SIDE AGGREGATE DRAIN AND STORMWATER
DRAIN PROVIDED AND CONNECTED TO DISPOSAL POINT ABOUT A KILOMETRE
AWAY WITH ADEQUATE SLOPE
30
31
32
33
34
MADHAVARAM – TONDIARPET ROAD
3. PROPOSAL
BOTH SIDES RCC DRAIN WITH PERFORATED COVER SLAB
VEHICLE ENTRANCE – EXIT
COVER SLAB DESIGN LIKE DECK SLAB
MADHAVARAM – TONDIARPET ROAD
4. CENTRAL 500 M
500 MM SAND FILLING (RIVER)
LEAN CONCRETE - 150 MM
CONCRETE PAYMENT (AS PER IRC 58)
5. END PROVIDED RETAINING WALL TO PROTECT SAND FILLING AND CC PAVEMENT WHEN BRIDGE WORK
TAKEN UP
PERFORMS WELL AFTER 25 YEARS OF CONSTRUCTION
Construction of concrete pavement in Madhavaram-
Tondiarpet High road, Kodungaiyur dumping yard
38
39
40
Dumping yard in April 2022
41
Drain condition in April 2022
42
Thank You